Alfresco AXEVP User Manual

AXEVP UNIT
FRONT
BACK
11
3
16
3
" 21
8
1
7
"
16
1
11
"
16
24"
"
AXEVP TYPICAL INSTALLATION
COUNTERTOP CUTOUT REQUIREMENTS
1
"
22
2
3" MIN.
1
"
21
2
BULLNOSE
NOTCH DETAIL
10
12
7
"
16
1/2" FPT GAS LINE
(SEE NOTE)
1
"
1
16
3
"
1
4
10"
1
"
4
3"
5
25
5
"22
16
"
16
15
"
16
3
"
1
SUPERIOR EQUIPMENT SOLUTIONS 7039 EAST SLAUSON A VENUE COMMERCE, CA. 90040
LAST SAVED BY: »» Jorge «« Thursday, September 10, 2015 8:53:11 AM
1
"
21
2
3
1
88
THE INFORMA TION CONTAINED IN T HIS DRAWING IS THE SOLE PROPERTY OF SUPERIOR EQUIPMENT SOLUTIONS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION FROM SUPERIOR EQUIPMENT SOLUTIONS, INC. IS PROHIBITED.
DRAWN BY:
JORGE PELAYO
CREATED: 09/10/2015
DEPTH EQUAL TO BULLNOSE
OVERHANG
9
3
" GAS LINE CONNECTION
16
SETBACK LOCATION
NOTE:
• A GAS LINE IS REQUIRED INSIDE THE COUNTER FOR OPERATION.
• IT IS RECOMMENDED THAT A FLEXIBLE GAS LINE IS USED TO EASE THE INSTALL­ ATION IN NATURAL GAS (NG) SETUPS. THE CONNECTION IS 1/2" FPT.
"
• IF LIQUID PROPANE SETUP IS ORDERED, THE UNIT IS SUPPLIED WITH A REGULA­ TOR, A 36" HOSE AND A 1/2" MPT x 3/8" MPT ADAPTER.
PROJECT TITLE:
AXEVP
DRAWING TITLE:
XEVP SPECIFICA
A
TION SHEET
DRAWING NO.:
AXEVP - SPEC SHEET
SHEET 1 OF 1
Loading...