Alfresco AXEVONG Specs

AGVPC UNIT
FRONT
BACK
5
3
8
21
3
"
8
7
1
"
16
1
11
"
16
24"
"
AGVPC TYPICAL INSTALLATION
COUNTERTOP CUTOUT REQUIREMENTS
1
22
"
2
3" MIN.
1
21
"
2
BULLNOSE
NOTCH DETAIL
10
12
7
"
16
21
1/2" FPT GAS LINE
(SEE NOTE)
3
"
8
1
"
1
16
3
1
"
4
10"
1
"
4
3"
5
25
5
"
22
16
"
16
15
"
16
3
1
"
8
SUPERIOR EQUIPMENT SOLUTIONS 7039 EAST SLAUSON AVENUE COMMERCE, CA. 90040
LAST SAVED BY: »» adrian «« Tuesday, August 26, 2008 2:04:50 PM
1
"
21
2
3
1
8
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SUPERIOR EQUIPMENT SOLUTIONS INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION FROM SUPERIOR EQUIPMENT SOLUTIONS, INC. IS PROHIBITED.
DRAWN BY: CREATED:
ADRIAN CRISCI
5/30/2008 2:18:14 PM
DEPTH EQUAL TO BULLNOSE
OVERHANG
9
3
"
GAS LINE CONNECTION
16
SETBACK LOCATION
NOTE:
• A GAS LINE IS REQUIRED INSIDE THE COUNTER FOR OPERATION.
• IT IS RECOMMENDED THAT A FLEXIBLE GAS LINE IS USED TO EASE THE INSTALL­ ATION IN NATURAL GAS (NG) SETUPS. THE CONNECTION IS 1/2" FPT.
"
• IF LIQUID PROPANE SETUP IS ORDERED, THE UNIT IS SUPPLIED WITH A REGULA­ TOR, A 36" HOSE AND A 1/2" MPT x 3/8" MPT ADAPTER.
PROJECT TITLE:
AGVPC
DRAWING NO.:
AGVPC - SPEC SHEET
DRAWING TITLE:
AGVPC SPECIFICATION SHEET
SHEET 1 OF 1
Loading...