Alera Lighting APCS PLK User Manual

sections
Plank - a+ClaSS
Technical Installation Data
2"
2"
⁄"
9 ⅞"
BottoM View
Solid Housing
row Mounting
A
Connection Section
End CapCross Section 3T8
Perforated Strip Housing
D
A
4, 8, 12 ft.
C
B
B
B
4, 8, 12 ft.
data chart
Nominal
Length
4' 19 lbs. 47 ¼" 48" 192 ⅝" 48 ⅝" 8' 32 lbs. 95 ¼" 96" 384 ⅝" 96 ⅝"
12' 44 lbs. 143 ¼" 144" 576 ⅝" 144 ⅝"
Note: Suspension data is computed using the standard aircraft cable assembly. The use of rigid stems will yield dierent data. Please consult factory for stem data. *3-Lamp includes CLC cover.
Approx. Weight
3-lamp*
A B C D
to install a/V downlight coVer:
» »
1. Install center lamp. 2. Place A/V cover directly over center lamp. 3. Install outer lamps.
Page 1 /4 Rev. 07/16/13 Beams / PLK-APCS TID
© 2013 Ale ra Lighting, a division of Hubbell Lighting, Inc. B ecause of continuing product imp rovement programs, Al era Lighting reserves the right to change specific ations without notice. 701 Millennium Blvd. Greenville, SC 296 07 / Tel 864.678.1000 / Website www.aleralighting.com
US Patent #8,436,542
Suspension Instructions:
1. Set bottom nut to desired xture height.
2. Adjust upper nut for a minimum of ⅜" between upper and lower nuts.
3. Slide cable hanger into hanger slot.
4. Secure and tighten upper nut.
Plank - a+ClaSS
Technical Installation Data
Connection Instructions:
1. Install rst xture of row with two hangers.
2. Slide inner die cast plates together.
3. Secure xture joints with two bolts and nuts and attach hanger at opposite end.
4. Repeat steps 2 and 3 until row is complete.
5. At each end of the row, attach and align end cap with screws.
Page 2 /4 Rev. 07/16/13 Beams / PLK-APCS TID
© 2013 Ale ra Lighting, a division of Hubbell Lighting, Inc. B ecause of continuing product imp rovement programs, Al era Lighting reserves the right to change specific ations without notice. 701 Millennium Blvd. Greenville, SC 296 07 / Tel 864.678.1000 / Website www.aleralighting.com
US Patent #8,436,542
Loading...
+ 2 hidden pages