Aleco RD-175 User Manual

Installation Instructions for Doors
with EZ Hinge Hardware
Required Tools
Header is Level
Center Punch
Drill (1/4” or 3/8” electric)
Drill bit: #7 (for steel channel)
Extension Cord
Hammer
Level (3’ minimum)
Need Nose Pliers
Pen or Pencil
Plumb Bob
Screwdriver, Slotted
Tape Measure
Tap 1/4“ 20 NC (for steel channel)
Attach Top Mounting Angle
Jamb is Plumb
Center Plumb Line on Jamb
Attach Jamb Guard
Step 1 Doorway Preparation
1.1 Inspect. If carton or doors are damaged from
shipping (bent shaft, etc.), contact factory.
1.2 Check jamb and header for plumb, level and square (measure diagonals).
1.3 Match size of door opening to size on packing slip.
1.4 Mark center plumb line on jamb.
1.5 Remove the top mounting angle from the door by
removing the hardware housing screws from the top corner of each side.
1.6 Line up the centerline on the bottom of the mounting angle with jamb centerline. Use the angle as a template to mark the hole locations on the jamb and header and center punch the holes.
1.7 Use the jamb guard as a template for the bottom mounting holes, lining up the centerline of the jamb guard with the centerline of the jamb. Mark the hole locations on jamb and floor and center punch the holes.
1.8 Drill centers with #7 bit (for steel channel), tap 1/4  20 and fasten to jamb with 1/4  20 bolts.
1.9 If jambs are wood or hollow metal over wood, fasten using 1 1/2” wood lags. Hollow metal frames without wood rough blocks should have 1/4” steel reinforcements (b/o) at jamb and header mounting locations.
Loading...
+ 2 hidden pages