Albion SUPERDUTY Installation Instruction

SUPERDUTY
ENGINEERED FOR EFFICIENCY
CISTERNFLOW
®
HIGH RECOVERY
CYLINDER
INSTALLATION INSTRUCTIONS
INTRODUCTION
Installation of Albion Superduty cylinders is very straightforward making them the ideal choice when considering a property refurbishment programme.
1
SUPERDUTY
®
PRODUCT SPECIFICATION
45
o
Primary flow connection
Primary return connection
45
o
90
o
Hot services connection
Immersion heater
connection
Cold feed
connection
Probe Thermostat connection
CAPACITIES: 45, 80, 120, 140, 160, 180, 210 (litres). CONNECTIONS: PRIMARY FLOW/RETURN
CF45/CF80: 22mm compression. Other models: 1" male BSP.
COLD FEED/HOT WATER SERVICES CF45/CF80: 22mm compression. Other models: 1" female BSP.
THERMOSTAT All models: 1/2" female BSP
MAXIMUM WORKING HEAD:
STANDARD MODELS: 10 metres.
15 and 25 metre working heads available to order. Please ensure you have the correct model before installing.
PRIMARY HEAT EXCHANGER:
Albion's unique Superduty multi-coil is suitable for both open vented and sealed primary circuits with a maximum working pressure of 3.5bar.
OTHER DETAILS: CFC free factory applied insulation.
2
Loading...
+ 1 hidden pages