AGF Manufacturing 7700, 7800 Installation Manual

AGF Manufacturing Inc.
Model 7700 and 7800
Owner’s Manual
INST-CORRinSITE_V001 · 5/16
M7800
M7700
CORRi n SITE Owner’s Manual
137
  
0,1 0,1
Recommended Installation Locations
CORRi n SITE is recommended for both wet and dry systems, and can be installed vertically or horizontally depending on its location in the system.
CORRi n SITE Plug Orientation for Vertical Installations
Any orientation on a vertical run of pipe in either a wet or dry system is considered acceptable. Refer to installation instructions and Fig. 2 below for both the M7700 Inline Pipe and M7800 Mechanical Tee.
CORRi n SITE Plug Orientation for Horizontal Installations
Wet System
AGF recommends positioning the plug at the top of the clock between 1 and 3 or 9 and 11, but not directly vertical at 12 (see Fig. 1).
Dry System
AGF recommends positioning the plug at the bottom of the clock between 3 and 5 or 7 and 9, but not directly vertical at 6 (see Fig. 1).
Fig. 1 Fig. 2
M7700 Inline Pipe Installation
The CORRi nSITE M7700 inline pipe has a 10” takeout with grooved pipe ends.
After choosing an installation location plumb the 10” pipe into the system 1. using the appropriately sized groove couplings. Before tightening couplings, orient the monitor’s plug to desired position (see Fig. 1).
After tightening couplings to manufacturer’s specifications apply appropriate 2. sealant to the plug’s threads and install into the pipe’s port (see Fig. 2). Orient the monitor’s plug so that the text is easy to read.
Complete installation tag and attach it to the eyelet in the monitor’s plug. 3. Record inspection dates on the monitor’s label as necessary.
2