![](/html/30/3073/30738349b6b7ff8f81b477782bad267f22bb6e4cd3162f60f107595c5de0b076/bg1.png)
TOWEL DISPENSER UNITS
Step 1:
Follow steps 1 and 2 from preceding pages.
Step 2:
Position Hand Sink onto Wall Mounting Clip. Mark top of Keyhole
Slot at Flange (Rear or Bottom) of hand sink. Open door to towel
dispenser - mark top of Keyhole Slot. Remove Hand Sink from
Wall Mounting Clip & drill holes for securing.
Installation Instructions for
Step 3:
Follow steps 4 and 5 of preceding page.
WALL MOUNTED
HAND WASHING SINK
Edgewood, New York 11717-8380
HAND SINKS - MA
Y 2005
CHECK FOR CONCEALED DAMAGE
FILE CL
Sinks manufactured by ADVANCE TABCO®are designed and constructed for the use of
liquid containment. Suggested applications: Hand Washing. ADVANCE TABCO®does not recommend
product use for activities employing harsh and active chemicals. Please consult factory regarding
unusual applications.
AIM WITH DELIVERING FREIGHT CARRIER
![](/html/30/3073/30738349b6b7ff8f81b477782bad267f22bb6e4cd3162f60f107595c5de0b076/bg2.png)
CONTENTS INCLUDE:
• (1) Hand Sink
Step 2:
Install faucet and drain assembly to Hand Sink.
• (1) Wall Mounting Clip
(Wall mounting hardware not included)
• (1) Drain Assembly (As required by model)
• (1) Faucet (As required by model)
Note: Electronic faucets are shipped separately
TOOLS REQUIRED:
• Tape Measure
• Adjustable Wrench
• Drill Motor & Drill Bits
• Pipe Wrench
• Level
• Safety Glasses
Step 1:
Identify Hand Sink location on wall.
Measure 41-1/2” A.F.F. (Above
Finished Floor) and draw level line
which will be the top edge of wall
mounting clip. Mark (2) slotted holes
of wall mounting clip and secure to
wall (Illustration 1 & 1A).
(Hardware not provided)
Illustration 1A
Illustration 1
Step 3:
Position Hand Sink onto Wall Mounting Clip. Mark top of Key Hole Slot
at Flange (Rear or Bottom) of Hand Sink and remove from Wall
Mounting Clip. Drill holes for securing Keyhole Slot Flange to wall.
Keyhole Slot
Step 4:
Position Hand Sink onto Wall Mounting Clip and secure to wall of
Keyhole Flange. (Hardware not provided)
41-1/2” Above
Finished Floor
Step 5:
Connect water and waste supply lines. Remove aerator and flush water
system. Check connection for leaks.
Finished Floor