
SCOPE
The intended use of the Baseplate dolly 2.0 is to transport
baseplates. With 3 sizes holders available, this dolly can be
assembled to fit dierent baseplate dimensions. You can
choose 3 types of frames and 3 types of holders.
ASSEMBLY KIT
BASEPLATE DOLLY
ZEM2SV32
Admiral Staging the Netherlands
www.admiralstaging.com +31 534 301 201
FRAMES
For 73 x 73 cm baseplates
For 80 x 80 cm baseplates
For 100 x 100 cm baseplates
HOLDERS
For 6 mm baseplates
For 8 mm baseplates
For 10 mm baseplates
CONTENT
1
3
1
2 x holder: Baseplate holder PE block (6 / 8 / 10 mm)
ZEVLH061 / ZEVLH081 / ZEVLH101
2
1 x frame: Baseplate dolly frame (73 / 80 / 100 cm)
ZEVLB073 / ZEVLB080 / ZEVLB100
3
4 x castor: Swivel castor 160 mm with brake ZEWACW34
2
ASSEMBLY
STEP 1
Place holder components onto the
bottom of the frame.
CAUTION
LOADING
SEQUENCE
Load from the inside to
the outside.
Conical couplers facing
inwards.
STEP 2
Screw the holder components together.
3 2 1 1 2 3
STEP 2
Assemble castors onto frame and holder.
MAINTENANCE
The Baseplate dolly 2.0 hardly needs any maintenance
under normal use and environmental circumstances.
For safety reasons however, all parts must be checked
regularly for dirt, damages, loss and corrosion.
• Check all components for damage and corrosion.
Damaged and corroded parts shall be rejected and
thrown away.
Replaced component shall be genuine Admiral only.