Admiral Staging Admiral Bodenplatten Rahmen 1000, Admiral Bodenplatten Rahmen 800, inkl. Bolt Set, Admiral Bodenplatten Rahmen 730, Admiral Caseeinsatz 2er SET, 6x 8mm, Admiral Caseeinsatz 2er SET, 6x 6mm User Manual [EN]

...
Page 1
SCOPE
The intended use of the Baseplate dolly 2.0 is to transport baseplates. With 3 sizes holders available, this dolly can be assembled to fit dierent baseplate dimensions. You can choose 3 types of frames and 3 types of holders.
ASSEMBLY KIT
BASEPLATE DOLLY
ZEM2SV32
Admiral Staging the Netherlands
www.admiralstaging.com +31 534 301 201
FRAMES
For 73 x 73 cm baseplates
For 80 x 80 cm baseplates
For 100 x 100 cm baseplates
HOLDERS
For 6 mm baseplates
For 8 mm baseplates
For 10 mm baseplates
CONTENT
1
3
1
2 x holder: Baseplate holder PE block (6 / 8 / 10 mm) ZEVLH061 / ZEVLH081 / ZEVLH101
2
1 x frame: Baseplate dolly frame (73 / 80 / 100 cm) ZEVLB073 / ZEVLB080 / ZEVLB100
3
2
ASSEMBLY
STEP 1
Place holder components onto the bottom of the frame.
CAUTION
LOADING SEQUENCE
Load from the inside to the outside.
Conical couplers facing inwards.
STEP 2
Screw the holder components together.
3 2 1 1 2 3
STEP 2
Assemble castors onto frame and holder.
MAINTENANCE
The Baseplate dolly 2.0 hardly needs any maintenance under normal use and environmental circumstances. For safety reasons however, all parts must be checked regularly for dirt, damages, loss and corrosion.
Check all components for damage and corrosion. Damaged and corroded parts shall be rejected and thrown away.
Replaced component shall be genuine Admiral only.
Loading...