Adler 579 Installation Instruction

Contents page:
Part 2: Class 579: Installation instructions
1. Items supplied ..................................................3
2. General and shipping braces .........................................3
3. Installing the machine
3.1 Adjusting the working height...........................................4
3.2 Attaching the yarn stand .............................................4
3.3 aligning and connecting the pedal .......................................5
4. Electrical connection ..............................................6
5. Pneumatic connection
5.1 Connecting the maintenance unit........................................7
5.2 Setting the operating pressure .........................................7
2
6.1 Filling the oil reservoirs..............................................8
7. Sewing test ....................................................9
1
6
2
7
8
3
9
4
5
10
2
1. Items supplied
What items are supplied depends on your order. Prior to installation please check that all the required parts are present.
1 head
2 operating panel
3 stand
4 pedal linkage
5 pedal
6 yarn stand
7 table plate
8 main switch
9 control box
10 maintenance unit
– –
optional extras (depending on the order) tools and minor components in the accessory kit
2. General and shipping braces
2
CAUTION:
The machine must be set up by trained specialist personnel. All work on the electrical equipment of this special sewing machine
may only be carried out by qualified electricians or other appropriately trained persons.
The mains plug must be removed.
Shipping braces
All shipping braces must be removed before the machine is installed.
Remove safety straps and battens on the machine head, table and stand.
3
Loading...
+ 6 hidden pages