ACV uk Delta Classic INSTALLATION OPERATING AND SERVICING INSTRUCTIONS

Page 1
INSTALLATION, OPERATING
AND SERVICING INSTRUCTIONS
DELTA Classic
Combination boiler
with atmospheric burner
ACV reserves the right to modality the technical specifications and components of its products without prior notice. 664Y0100
05/11/2002
Page 2
These instructions are intended for:
- the specifying engineer
- the installation engineer
- the user
- servicing technicians
1.2 SYMBOLS
The following symbols are used in these instructions:
Essential instruction for operating the system correctly.
Essential instruction for personal safety and environmental protection.
Danger of electrocution.
Risk of burns.
1.3 APPLICABLE STANDARDS
The products have received the “EC” certificate in accordance with the standards prevailing in different countries (European Directives 90/42/EEC, “efficiency”, 90/396/EEC “gas appliances”). These products have also received the Belgian “HR+” mark.
1 INTRODUCTION 2
1.1 Intended users of these instructions 2
1.2 Symbols 2
1.3 Applicable standards 2
1.4 Warnings 2
2 INSTALLATION 3
2.1 Boiler room 3
2.2 Connections 3
2.4 Electrical connection 5
3 START-UP 6
3.1 Filling the heating and hot water circuits 6
3.2 Atmospheric burner troubleshooting 6
4 SERVICING 6
4.1 Recommendation 6
4.2 Servicing the gas boiler 6
4.3 Servicing the safety devices 6
4.4 Servicing the burner 7
4.5 Emptying the boiler 7
4.6 Spare parts 7
5 DESCRIPTION 8
5.1 Overview 8
5.2 Description of operation 8
5.3 Design features 9
6 TECHNICAL SPECIFICATION 10
6.1 Effective dimensions 10
6.2 Maximum operating conditions 10
6.3 Domestic hot water performance 10
6.4 Boiler performances 10
6.5 Atmospheric burner 11
7 USER GUIDE 12
7.1 Using the boiler 12
7.2 Boiler room 13
1.4 WARNINGS
These instructions are an integral part of the equipment to which they refer and must be supplied to the user.
The product must be installed and serviced by qualified engineers, in compliance with the prevailing standards.
ACV accepts no liability for any damage resulting from incorrect installation or from the use of components or fittings not specified by ACV.
Failure to observe instructions regarding tests and test procedures can result in personal injury or pollution risks.
Note: ACV reserves the right to modify the technical specifications and components of its products without prior notice.
INDEX 1 INTRODUCTION
2
Page 3
2.1 BOILER ROOM
2.1.1 ACCESS
The boiler room must be large enough to allow good access to the boiler.The following minimum distances (mm) are required around the boiler:
- front 500 - sides 100
- rear 150 - above 700
2.1.2 VENTILATION
The boiler room must be fitted with top and bottom vents according to the table below.
2.1.3 BASE
The base on which the boiler rests must be made of non-combustible materials.
2.2 CONNECTION
2.2.1 CHIMNEY CONNECTION
The boiler can be connected to a standard flue that complies with the regulations in force or is connected to a chimney. It must be easy to remove to give access to the flue pipes when servicing the boiler.
IMPORTANT Boilers must be installed by a qualified engineer, in accordance with the prevailing local standards and regulations.
2.2.2 CENTRAL HEATING CONNECTION
2.2.2.1 Examples of basic circuit configurations
The drain valve and safety valve must be connected to the sewer drain.
1. 3-way manual motorisable mixer valve
2. Safety valve pre-set to 3 bar with pressure gauge
3. Circulator
4. Non-return valve
5. System filling valve
6. Expansion tank
7. Room thermostat
8. ACV 13 controller
(see controller kit page 5)
9. Central heating isolating valve
10. Drain valve
Fig. 2: Configuration with circulator controlled
by a room thermostat
2 INSTALLATION
Fig. 3: Configuration with motor driven mixer valve
Fig. 1: Boiler room ventilation and chimney connection
A
B
D
C
A. Top vent B. Bottom vent C. Chimney height D. Chimney diameter
3
G20 G25 G30-P30
Ventilation
Min. fresh air requirement m
3
/h 96,6 119,3 140,4
Top vent (A) dm
2
1,5 1,5 1,5
Bottom vent (B) dm
2
1,6 2 2,3
Chimney
C = 5 m Ø min. F mm 153 157 170 C = 10 m Ø min. F mm 153 153 153 C = 15 m Ø min. F mm 153 153 153
9
9
2
4
3
5
6
10
7
9
2
5
6
9
4
8
3 1
10
Page 4
2.2.2.2 ACV circulation kit
ACV offers an optional pre-assembled circulation kit comprising:
- a circulator.
- a 3-way manual motorisable valve.
- connecting pipes including a second optional circuit.
- two isolating valves.
- adapters for mounting safety valve and filling valve to right or left of expansion tank.
2.2.2.3 Discharge
The drain cock and safety valve must be connected to the waste water system in accordance with current regulations.
2.2.3 DOMESTIC HOT WATER CONNECTION
2.2.3.1 Pressure reducer
If the water mains pressure is greater than 6 bar, a pressure
reducer calibrated to 4.5
bar must be fitted.
2.2.3.2 Safety unit
The tank safety unit must be ACV approved and calibrated to 7 bar. The valve discharge must be connected to the sewer drain.
2.2.3.3 Hot water expansion tank
Installing a hot water expansion tank avoids any risk of pressure surges due to water-hammer.
2.2.3.4 Hot water circulation
If the tank is situated a long way from the point of use, then installing a closed return circuit can provide a faster supply of hot water always available.
2.2.3.5 Description
1. Safety unit
2. Pressure reducer
3. Thermostatic mixing valve
4. Hot water circulator
5. Non-return valve
6. Hot water expansion tank
7. Inlet valve
8. Draw-off valve
9. Emptying valve
IMPORTANT As a safety measure against burns, we strongly advise installing a thermostatic mixing valve (recommended temperature: 60° C).
Optional fittings available
2 INSTALLATION
Fig. 5a: Configuration without thermostatic mixing valve
1
2
3
4
6
5
7
9
8
Fig. 5b: Configuration with thermostatic mixing valve
4
Fig. 4: ACV circulation kit assembly
Safety unit Ø 3/4” Pressure reducer Ø 3/4” Thermostatic mixer Ø 3/4” Hot water expansion tank 5 litres
2
7
1
9
6
4
5
8
Page 5
Wiring diagram of ACV controller kits (fig. 7)
2 INSTALLATION
2.3 ELECTRICAL CONNECTION
2.3.1 POWER SUPPLY
The boiler operates with a 230 V - 50 Hz single phase supply. An on-off switch box with 6 A fuses must be fitted outside the boiler to allow power to be shut off during servicing and before any repairs are carried out on the boiler.
2.3.2 COMPLIANCE
Boiler installation must comply with the prevailing local standards and legislation.
2.3.3 SAFETY
The stainless steel tank must be earthed separately.
2.3.4 BURNER ELECTRICAL CONNECTION
The burner is supplied with power by a 3-core cable.
1. Boiler thermostat (60/90° C)
2. On/off switch
3. Summer/winter selector
4. Thermometer
5. Controller (optional)
6. TTB
7. Cut-off thermostat
(95° C max.)
8. Safety thermostat (103° C max.)
9. Plug (power and control)
10. Room thermostat
11. Heating pump connection
12. To gas valve
Fig. 8: Control panel
The power to the boiler must be switched off before any work is carried out.
Fig. 9: Boiler wiring
M. Brown O. Orange
N. Black B. Blue R. Red
T. Green-yellow
1
2
C
L1
L1
N
T1
T2
N
T1
T2
S3
S3
N
L1
230V-50 Hz
6A
M
R
B
B
O
B
B
O
M
M
T
N
N
1O
11
9
2
8
7
3
6
1
12
241 3 5
B2. Water temperature detector B9. Outside temperature detector B5. Analogue/digital room thermostat P1. Central heating pump
Y1/Y2/N. Mixer valve (SQK349)
bl. Blue N
n/z. Black Y2
br. Brown Y1
5
Fig. 6a: kit 1
Fig. 6b: kit 2
2.2.4 CONTROLLER KITS
KIT 1: ACV 13.00 / Basic Basic kit for regulating flow temperature according to weather conditions. It comprises: temperature regulator with analogue timer, water temperature detector (-30/130° C), outside temperature detector (-30/50° C), 230V - 3 spindle servomotor SQY 31 and intermediate socket.
KIT 1: ACV 13.00 / Standard Basic kit for regulating flow temperature according to weather conditions. It comprises: temperature regulator with analogue timer, water temperature detector (-30/130° C), outside temperature detector (-30°/50' C), 230V - 3 spindle servomotor SQY 349 and intermediate socket.
SQK 349
P1 B5 B9 B3 B2
QAAD50
(QAAD70)
n/z br
bl
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2
QAC32 QAD22
P1Y1Y2NB5B9B3B2
230V
N
1
L1
ALIMENTATION
230V / 50 Hz
Page 6
3.1 FILLING THE HEATING AND HOT WATER CIRCUITS
1. Fill the domestic hot water circuit and bring it up to pressure.
IMPORTANT The hot water tank must be pressurised before the heating circuit is filled.
2. Fill the heating circuit taking care not to exceed the 2 bar pressure
limit.
3. Vent the air from the top of the boiler.
4. After venting the air from the system, bring the pressure up to the
static head plus 0.5 bar: 1.5 bar = 10 m – 2 bar = 15 m.
5. Check the power connection, the boiler room ventilation, and ensu-
re that there are no leaks in the flue gas discharge pipes.
6. Set the thermostat (1) to between 60 and 90° C.
3 START-UP 4 SERVICING
Fig. 10: Control panel
7. Set the Summer/Winter selector (3) to the desired position.
8. Switch the on/off switch (2) to the ON position.
9. Check the gas supply pressure on starting up.
3.2 BURNER TROUBLESHOOTING
Refer to the servicing and troubleshooting instructions for the burner.
Before servicing or repairs, switch off the power at the mains switch fitted in the boiler room by the electrician.
3
2
5 4
7
1
8
6
4.1 RECOMMENDATION
ACV advises that boilers should be serviced at least once a year. The burner must be serviced and tested by a competent engineer.
4.2 SERVICING THE GAS BOILER
1 - Switch off the power at the mains switch outside the boiler and
close the gas tap. 2 - Set the on/off switch on the control panel to the OFF position. 3 - Release and remove the chimney flue (1) to free the top of the
boiler. 4 - Remove the jacket top (2) and lift off the flue reducer (3). 5 - Remove the baffles (4) from the flue pipes (5) for cleaning. Replace
them if in poor condition. 6 - Unscrew the burner chamber plate (6). 7 - Brush the flue pipes (5). 8 - Clean the burner chamber (7) and the burner (8). 9 - Check that the insulation on the burner chamber plate (6) is in
good condition.
1. Chimney flue
2. Jacket top
3. Chimney flue reducer
4. Baffles
5. Flue pipes
6. Burner chamber plate
7. Burner chamber
8. Burner
Fig. 11: Main components.
4.3 SERVICING THE SAFETY DEVICES
- Check that all thermostats and safety devices are working properly:
boiler thermostat, cut-off thermostat and manually reset safety
thermostat.
- Test the safety valves on the central heating and hot water circuits
6
21 3
Page 7
4.4 SERVICING THE BURNER
- Check and clean the burner and ignition electrode.
- Check that the safety components are working properly.
4.5 EMPTYING THE BOILER
4.5.1 EMPTYING THE PRIMARY CIRCUIT (central heating):
1. Switch off the power to the boiler at the mains switch installed by the electrician.
2. Close the isolating valves (1) of the boiler system.
3. Connect a hose to the drain valve (2). Ensure that it is attached properly.
4. Open the drain valve and let the hot water drain out.
5. When the boiler is empty, return the isolating and safety valves to their initial positions.
4.5.2 EMPTYING THE HOT WATER TANK:
1. Switch off the mains power to the boiler at the external switch installed by the electrician.
2. Relieve the pressure in the primary circuit.
3. Close valves (A) and (B).
4. Open valves (C) and (D) (first C then D).
5. Let the water drain away.
6. After emptying, return the valves to their initial positions.
For the tank to be emptied, valve (C) must be situated at ground level.
4.6 SPARE PARTS
Refer to the specific document available from ACV or your distributor.
4 SERVICING
Fig. 12a: Emptying the primary circuit
Fig. 12b: Emptying the hot water circuit
A
C
B
D
7
1
1
2
Page 8
5.1 OVERVIEW
Combination boiler (central heating and domestic hot water).
Designed for venting through a chimney.
TANK-IN-TANK indirect storage type domestic hot water production.
Fittings necessary for connecting the circulation kit for feeding the heating circuit
(available as an option).
Control panel with on/off switch, adjustable thermostat, thermometer, “Summer/Winter” selector and knockout for fitting ACV integrated control system
(optional).
Flue gas anti-backdraught safety device.
Delivered complete with atmospheric type burner.
DELTA Classic models G20, G25 and G30, for natural gas, with rated outputs of 23.2, 28.7 and 34 kW.
DELTA Classic model P30, for propane, with a rated output of
34.4 kW.
5.2 DESCRIPTION OF OPERATION
5.2.1 THE TANK-IN-TANK CONCEPT
The DELTA Performance series differs from traditional hot water producers because of its ring-shaped tank immersed in the primary fluid contained in the outer body. When there is a demand for hot water from the central heating system or the domestic hot water system, the thermostat starts the burner. The combustion gases quickly heat up the primary fluid, creating a natural circulation around the tank.
5.2.2 DOMESTIC HOT WATER HEATED INDIRECTLY
This circulation facilitates heat exchange between the primary fluid and the domestic water, which takes place all over the tank surface. The corrugations on the inner and outer shells of the ring-shaped tank further boost the area of heat exchange and speed up the heating process of the domestic water.
5.2.3 EASY SETTING AND SAFETY ASSURED
With a single command, the water temperature of both the primary circuit and the hot water circuit is set by the adjustable thermostat situated on the tank in the primary circuit. A cut-off thermostat, placed on top of the boiler, automatically cuts out the burner when the water temperature in the primary circuit reaches 95° C. A manually reset safety thermostat shuts off the burner if the temperature reaches 103° C.
5 DESCRIPTION
1. Primary fluid
2. Domestic hot water
3. Combustion chamber
4. Control thermostat
5. Burner
Fig. 13: Stainless steel domestic hot water tank
1
2
5
3
4
Fig. 14: Overview of boiler
8
Page 9
5.3 DESIGN FEATURES
5.3.1 OUTER BODY
The outer body containing the primary fluid is made of STW 22 steel.
5.3.2 TANK-IN-TANK TYPE EXCHANGER ACCUMULATOR
The ring-shaped inner tank with its large heating surface for producing domestic hot water is built of Chrome/Nickel 18/10 stainless steel. It is corrugated over its full height by an exclusive production process and entirely argon arc welded by the TIG (Tungsten Inert Gas) method.
5.3.3 COMBUSTION GAS CIRCUIT
The combustion gas circuit is protected by cold galvanisation. The combustion gas circuit comprises:
5.3.3.1 Flue pipes
Depending on output, DELTA Classic models contain 4 or 8 steel flue pipes with an internal diameter of 64 mm. Each pipe is fitted with a baffle of special steel designed to improve heat exchange and reduce flue gas temperature.
5.3.3.2 Combustion chamber
The combustion chamber on DELTA Classic models is water cooled.
5.3.4 INSULATION
The boiler body is fully insulated by rigid polyurethane foam with a high thermal insulation coefficient, sprayed on without the use of CFCs.
5.3.5 JACKET
The boiler is covered by a steel jacket which has been scoured and phosphated before being stove enamelled at 220° C.
5.3.6 BURNER
DELTA Classic boilers are fitted with an atmospheric burner with elec­tric ignition.
IMPORTANT When starting the burner for the first time and when servicing it, refer to the technical instructions supplied with it.
5.3.7 CONTROL PANEL
(Fig. 15)
1 - Thermostat adjustable between 60 and 90° C 2 - On/off switch 3 - Summer/winter selector 4 - Thermometer 5 - Knockout for (optional) controller.
5 DESCRIPTION
Fig. 15: Boiler structure
12
1
15
2
4
3 5
14
6
19 8
11
9
13
7
20
16
18
17
7
10
Fig. 16: Control panel
241 3 5
9
1. Inner ring-shaped domestic hot water tank
2. External body containing central heating circuit
3. Insulation
4. Jacket
5. Flue pipes
6. Baffles
7. Control thermostat 60/90° C
8. Lower heating return
9. Combustion chamber
10. Burner chamber plate
11. Boiler drain
12. Upper heating flow and return
13. Chimney connection
14. Control panel
15. Domestic hot water outlet
16. Domestic cold water inlet
17. Cut-off thermostat 95° C / Thermometer
18. Manually reset safety thermostat 103° C
19. Gas burner
20. Burner chamber disk.
Page 10
6.1 EFFECTIVE DIMENSIONS
The units are delivered fully assembled, tested and packed on a timber base with shockproof edges and protected by heat-shrunk plastic film. On reception and after unpacking, check the equipment for damage. For transport purposes, refer to the weights and dimensions given below.
6.2 MAXIMUM OPERATING CONDITIONS
Maximum service pressure (tank full of water)
- Primary circuit: 3 bar
- Secondary circuit: 10 bar
Test pressure
(tank full of water)
- Primary circuit: 4.5 bar
- Secondary circuit: 13 bar
Operating temperature
- Maximum temperature: 90° C
6 TECHNICAL SPECIFICATION
Fig. 17: Effective dimensions
6.3 DOMESTIC HOT WATER PERFORMANCE
6.4 BOILER PERFORMANCES
10
Dimensions
G20 G25 G30/P30
A
1697 1697 1697
B
1460 1460 1460
C
154 154 154
D
360 390 390
Kg
712 712 712
Domestic hot water performances G20 G25 G30 P30
Operating at 80° c
Peak delivery at 40° C (6T = 30° C) litres/10’ 266 339 339 339 Peak delivery at 40° C (6T = 30° C) litres/60’ 820 1025 1151 1161 Continuous delivery 40° C (6T = 30° C) litres/h 665 823 975 986
Operating at 80° c
Initial heating time minutes 40 29 24 24 After draw-off of 140 l à 45° C minutes 16 12 10 10 Specific delivery litres/minutes 11 14 14,5 14,5
Results obtained without a thermostatic mixing valve and with water supply at 10° C
G20 G25 G30 P30
Input kW 26,1 33,1 39,0 40,0 Output kW 23,2 28,7 34 34,4 Combustion efficiency % 89 89 89 89,5 Maintenance loss at 60° C as % of rated value % 1,3 1 0,8 0,87 Mass rate of combustion products g/sec. 20 25 30 30 Average CO
2
% 99910 Total capacity litres 178,5 167,5 167,5 167,5 Primary circuit capacity litres 114,5 87,5 87,5 87,5 Heating connection Ø 1” 1” 1” 1” Hot water connection Ø 3/4” 3/4” 3/4” 3/4” Hot water tank heat exchange surface m
2
1,59 2,46 2,46 2,46
Weight empty Kg 154 186 186 186
Chimney connection B11 BS B11 BS B11 BS B11 BS
200
D
570
160
E
C
B
542
A
118 158
Page 11
6.5 ATMOSPHERIC BURNER
6 TECHNICAL SPECIFICATION
6.5.1 START-UP
- Flush the gas pipe thoroughly, activate the room thermostat and set the control thermostat for heat demand.
- Open the gas tap.
- Turn on the main switch on the control panel.
IMPORTANT:
- The burner is preset at the factory.
- Check the gas supply pressure and the pressure at the burner when starting up.
LEGEND:
1. Gas electro-valves
2. Upstream gas pressure test point
3. Pressure regulator
4. Burner gas pressure test point
11
G20 G25 G30 P30
Gas G20 - 20 mbar - I E2+ - I 2E LL
Burner pressure mbar 13,3 12,8 12,3 - Flow rate m
3
/h 2,76 3,50 4,13 -
Gas G25 - 25 mbar - I 2L
Burner pressure mbar 13,4 13,4 13,4 - Flow rate m
3
/h 3,10 3,88 4,50 -
Gas G31 - 37/50 mbar - I 3P
Burner pressure mbar - - - 28,5 Flow rate m
3
/h - - - 1,64
Injectorr Ø 1/100 mm 450 470 510 3x190
BE - FR I E2+
AT - DK ES - GB I 2H
IT - PT IE - SE
BE - FR ES - GB I 3P
IE - PT
NL I 2L
LU - DE I 2ELL
Fig. 18: Burner valve
Fig. 19: Natural gas atmospheric burner
Fig. 20: Propane atmospheric burner
1. Flame holders
2. Ionisation ignition electrode
3. Reset button
1. Ionisation ignition electrode
2. Flame holders
3. Injector
4. Reset button
1
8
2
3
1
4
23
7
6
5
4
1
8
7
6
5
4
2
3
Page 12
7.1 USING THE BOILER
7.1.1 GETTING TO KNOW THE CONTROL PANEL (Fig. 21)
Before doing any work on the boiler, switch off the power at the mains switch installed in the boiler room by the electrician. On the control panel, switch off the ON/OFF switch.
(item 2, Fig. 21)
1 - Control thermostat 60 to 90° C (item 1, Fig. 21)
Central heating systems are generally designed to operate at 80° C maximum. If they are operated at a lower temperature, a 3-way mixer valve installed on the heating flow pipe
(see Fig. 3, page 3) allows the
temperature to be set manually or, if you decide to install a regulator
(§ 2.2.4), automatically.
We recommend you set the thermostat to the maximum values to get the best from the domestic hot water system.
The water stored in the domestic hot water tank in the boiler can be at a very high temperature. In all cases, install the thermostatic mixer
(Fig. 5b, page 4) on the domes-
tic hot water flow pipe which must not exceed 60° C. A blender or mixing valve is recommended at each point of use.
2 - ON/OFF switch
(item 2, Fig. 21)
This must be used to switch off the boiler before working on it.
3 - Summer/winter selector
(item 3, Fig. 21)
“Winter” position: activates both the hot water and central heating func­tions. “Summer” position: the room thermostat or regulator
(§ 2.2.4) is
switched off. The heating circulator is also switched off. Only the domestic hot water function is provided. You can lower the temperature on the thermostat (1) to save energy. If there is not enough hot water, we recommend setting the thermostat (1) to its maximum value. When the next heating season begins, simply select “Winter” to reactivate the heating system.
4 - Thermometer
(item 4, Fig. 21)
Reads the temperature of the boiler primary circuit (central heating) directly.
5 - Regulator
(item 5, Fig. 21)
See the user instructions enclosed if you have chosen this option.
7.1.2 HEATING SYSTEM GAUGE PRESSURE
Your system is fitted with a heating safety valve set to 3 bar, with a pressure gauge.
Ensure that the water in the system is always pressurised. When cold, and the air in the system has been vented, the pressure gauge must show a pressure between 0.5 and 1.5 bar, depending on the height of the building (1 bar = 5m / 1.5 bar = 10 m and 2 bar = 15 m). To add water, open the filling valve
(Fig. 2 and 3 page 3). Close the valve
after filling. Vent the air in the system to get an accurate water pressure reading.
7.1.3 SAFETY VALVE
(central heating)
(item 2, Fig. 3, page 3)
The drain pipe to waste water system drain must be iaw current regulations.
In the event of a fault after this short trial, inform the installing engineer.
7.1.4 SAFETY UNIT
(domestic hot water)
(item 1, Fig. 5a and 5b, page 4)
A monthly inspection is recommended. Lift the lever on the emptying device for a few seconds to ensure that the safety valve is working properly.
The drain pipe to waste water system drain must be iaw current regulations.
In the event of a fault after this short trial, inform the installing engineer.
7 USER GUIDE
Fig. 21: Control panel
241 3 5
12
Page 13
7.2 BOILER ROOM
• Keep vents free at all times.
• Do not store inflammable products in the boiler room.
• Take care not to store corrosive products near the boiler, such as paints, solvents, chlorine, salt, soap and other cleaning products.
• If you smell gas, do not switch on the light or light a flame.Turn off the mains gas tap at the meter and inform the appropriate services immediately.
7 USER GUIDE
7.1.5 GAS BURNER - RESETTING
If the atmospheric burner is not working:
1. Remove the protective cover.
2. Press the red button to start the burner.
3. If the burner lights, replace the cover.
If the burner is not working, isolate the electricity supply before attempting to reset the safety thermostat.
4. Remove the front panel of the casing and reset the safety thermostat positioned on top of the boiler.
Wait until the boiler temperature is below 60 °C. Then replace the casing front panel.
5. If the burner lights, replace the cover.
6. If the fault persists, notify the installing engineer.
Starting the burner.
In normal operation, the gas burner starts automatically whenever the boiler temperature falls below the set temperature.
Fig. 23: Safety thermostat reset button
To ensure your system operates properly, have it professionally serviced once a year before the central heating season begins.
Fig. 22: Burner reset button
13
Page 14
INTERNATIONAL
ACV international n.v
KERKPLEIN, 39 B-1601 RUISBROEK - belgium TEL.: +32 2 334 82 20 FAX: +32 2 378 16 49 E-MAIL: international.info@acv-world.com
AUSTRALIA
ACV PACIFIC PTY.LTD
UNIT 7, 10 ANELLA AVENUE CASTLE HILL NSW 2154 - AUSTRALIA TEL.: +61 2 88 50 45 88 FAX: +61 2 88 50 45 99 E-MAIL: pacific.info@acv-world.com
BELGIUM
ACV BELGIUM nv/sa
KERKPLEIN, 39 B-1601 RUISBROEK-BELGIUM TEL.: +32 2 334 82 40 FAX: +32 2 334 82 59 E-MAIL: belgium.info@acv-world.com
CHILE
ALBIN TROTTER Y ACV LTDA
SAN PABLO 3800 QUINTA NORMAL - SANTIAGO - CHILE TEL.:+56 2 772 01 69 FAX:+56 2 772 92 62/63 E-MAIL: chile.info@acv-world.com
CZECH REPUBLIC
ACV CR SPOL. s.r.o
NA KRECKU 365 CR-109 04 PRAHA 10 - CZECH REPUBLIC TEL.:+420 2 720 83 341 FAX:+420 2 720 83 343 E-MAIL: ceskarepublika.info@acv-world.com
DEUTSCHLAND
ACV DEUTSCHLAND Gmbh
GEWERBEGEBIET GARTENSTRASSE D-08132 MÜLSEN ST.JACOB - DEUTSCHLAND TEL.:+49 37601 311 30 FAX:+49 37601 311 31 E-MAIL: deutschland.info@acv-world.com
ESPAÑA
ACV ESPAÑA
C/ANTONIO GAUDI, 3 E-08349 CABRERA DE MAR - ESPANA TEL.:+34 937 595 451 FAX:+34 937 593 498 E-MAIL: spain.info@acv-world.com
FRANCE
ACV FRANCE sa
31, RUE AMPERE - Z.I MI - PLAINE F-69680 CHASSIEU - FRANCE TEL.:+33 4 72 47 07 76 FAX:+33 4 72 47 08 72 E-MAIL: france.info@acv-world.com
ITALIA
ACV ITALIA
VIA MALPIGHI 6 I-48018 FAENZA (RA) - ITALIA TEL.:+39 0546 62 25 15 FAX:+39 0546 62 25 05 E-MAIL: italia.info@acv-world.com
NEDERLAND
ACV NEDERLAND bv
POSTBUS 350 NL-2980 AJ RIDDERKERK - NEDERLAND TEL.:+31 180 42 10 55 FAX:+31 180 41 58 02 E-MAIL: nederland.info@acv-world.com
POLAND
ACV POLSKA sp. z.o.o.
BUIRO GLOWNE PL-87 - 702 KONECK - POLAND TEL.:+48 54 272 23 00 FAX:+48 54 272 23 01 E-MAIL: polska.info@acv-world.com
PORTUGAL
BOILERNOX LDA
RUA OUTEIRO DO POMAR CASAL DO CEGO, FRACÇÃO C, PAVILHÃO 3 - MARRAZES 2400-402 LEIRIA - PORTUGAL TEL.:+351 244 837 239/40 FAX:+351 244 823 758 E-MAIL: boilernox@mail.telepac.pt
RUSSIA
ACV RUSSIA
1/9, MALYI KISELNYI 103031 MOSCOW - RUSSIA TEL.:+7 095 928 48 02 / +7 095 921 89 79 FAX:+7 095 928 08 77 E-MAIL: russia.info@acv-world.com
SLOVAK REPUBLIC
ACV SLOVAKIA s.r.o.
PLUHOVÁ 49 831 04 BRATISLAVA - SLOVAK REPUBLIC TEL.:+421 2 444 62 276 FAX:+421 2 444 62 275 E-MAIL: slovakia.info@acv-world.com
UK
ACV UK Ltd
ST. DAVID’S BUSINESS PARK DALGETY BAY - FIFE - KY11 9PF - SCOTLAND TEL.:+44 1383 82 01 00 FAX:+44 1383 82 01 80 E-MAIL: uk.info@acv-world.com
USA
TRIANGLE TUBE PHASE III
FREEWAY CENTER - 1 TRIANGLE LANE BLACKWOOD NJ 08012 - USA TEL.:+1 856 228 8881 FAX:+1 856 228 3584 E-MAIL: sales@triangletube.com
ARGENTINA
TECNOPRACTICA
ALFEREZ BOUCHARD 4857 1605 CARAPACHAY - BUENOS AIRES TEL.: +54 11 47 65 33 35 FAX: +54 11 47 65 43 07 E-MAIL: jchas@tecnopractica.com
BRAZIL
SIMETAL INDUSTRIA E COMERCIO DE FERRAMENTAS LTDA
RUA GERSON ANDREIS 535 95112 - 130 CAXIAS DO SUL - BRAZIL TEL.: +55 54 227 12 44 FAX: +55 54 227 12 26 E-MAIL: export@simetall.com.br
BULGARIA
PROXIMUS ENGINEERING LTD
7 BIAL KREM STR. 9010 VARNA - BULGARIA TEL.:+359 52 500 070 FAX:+359 52 301 131 E-MAIL: yankod@yahoo.com
CHINA
BEIJING HUADIAN HT POWER TECHNOLOGY DEVELOPMENT CO. LTD
ROOM B-912, TOWER B, COFCO PLAZA N°. 8, JIANGUOMENNEI AVENUE BEIJING 100005 - PEOPLE’S REPUBLIC OF CHINA TEL.:+86 10 652 30 363/393 EXT 101 FAX:+86 10 652 27 071 E-MAIL: li.zheng@acv-world.com
DENMARK
VARMEHUSET
FRICHSVEJ 40 A 8600 SILKEBORG - DENMARK TEL.:+45 86 82 63 55 FAX:+45 86 82 65 03 E-MAIL: vh@varmehuset.dk
ESTONIA
TERMOX AS
TAHE 112A 51013 TARTU - ESTONIA TEL.:+372 736 73 39 FAX:+372 736 73 44 E-MAIL: termox@termox.ee
GREECE
ESTIAS
MARASLI STREET 7 54248 THESSALONIKI - GREECE TEL.:+30 310 31 98 77 FAX:+30 310 31 97 22 E-MAIL: info@genikithermanseon.gr
ÎLE MAURICE
SOTRATECH
29, RUE MELDRUM BEAU BASSIN - ÎLE MAURICE TEL.:+230 46 76 970 FAX:+230 46 76 971 E-MAIL: stech@intnet.mu
LITHUANIA
UAB “GILIUS IR KO”
SAVARNORIU PR. 192 3000 KAUNAS - LITHUANIA TEL.:+370 7 308 930 FAX:+370 7 731 796
MAROC
CASATHERM
PLACE EL YASSIR 20300 CASABLANCA - MAROC TEL.:+212 22 40 15 23 FAX:+212 22 24 04 86
MOLDAVIA
STIMEX - PRIM S.R.L.
STR BUCURESTI, 60A 2012 CHISINAU - MOLDAVIA TEL.:+37 32 22 46 75 FAX:+37 32 27 24 56 E-MAIL: stimex@larina.mldnet.com
ÖSTERREICH
PROTHERM HEIZUNGSTECHNIK Gmbh
TRAUNUFERSTRASSE 113 4052 ANSFELDEN - ÖSTERREICH TEL.:+43 7229 804 82 FAX:+43 7229 804 92 E-MAIL: protherm@nextra.at
ROMANIA
SC TRUST EURO THERM SA
D.N PIATRA NEAMT - ROMAN km 2 C.P 5 O.P 3 jud. Neamt 5600 PIATRA NEAMT - ROMANIA TEL.:+40 33 20 62 06 FAX:+40 33 20 62 00 E-MAIL: office@eurotherm.ro
SLOVENIA
Z*MAJ d.o.o.
CESTA OF 49 1420 TRBOVLJE - SLOVENIA TEL.:+386 356 32 830 FAX:+386 356 32 831 E-MAIL: jjeraj@zmaj.si
SWEDEN
WÄRMEPRODUKTER I KLIPPAN AB
TEMPLAREGATAN 7 26435 KLIPPAN - SWEDEN TEL.:+46 435 184 10 FAX:+46 435 184 02 E-MAIL: warmeprodukter.se@telia.com
TUNISIE
SO.CO.ME CHAUMAX
BOÎTE POSTALE N°44 1002 TUNIS - TUNISIE TEL.:+216 71 78 15 91 FAX:+216 71 78 87 31
UKRAINE
UKRTEPLOSERVICE LTD
PR. LAGUTENKO 14 83086 DONETSK - UKRAINE TEL.:+38 062 382 60 47/48 FAX:+38 062 335 16 89 E-MAIL: kotel@uts.donetsk.ua
Loading...