ACI-Automation Components CONNECTING SPLIT-CORE CTs TO A LOAD Instruction Sheet

STEP-BY-STEP GUIDE TO CONNECTING SPLIT-CORE CTs TO A LOAD
ALL WORK SHOULD BE
ELECTRICIAN USING PROPER
SAFETY EQUIPMENT
Equipment is protected throughout by double insulation (IEC 536 Class III)
1. Open the CT by holding on to the removable leg and pulling it apart.
2. Connect CT around the load conductor to be measured. Make sure the maximum current of the conductor does not exceed CTs rating.
3. Re-connect the removable leg. The conductor should be in the inside of the CT window. Make sure the CT leg core aligns with the main housing core. (See
Photo 2.)
4. Repeat Steps 1-3 if you are using more than one CT.
5. Connect the white wire on the CT to the positive terminal on the measuring device. (See
Photo 3.)
6. Connect the black wire on the
CT to the negative terminal on the measuring device. (See
Photo 3.)
7. You are now ready to begin
your monitoring session.
Photo 1: Pull CT Apart.
Photo 2: Install CT Around
Conductor.
Photo 3: Connect White Wire to Positive Terminal. Connect Black Wire to Negative Terminal.
Loading...