PROCEDURE TO SETUP SUPRA 818AHD SURFACE GRINDER
1. Unwrap the machine and check out machine for any physical damage. If so, report to your dealer as soon as
possible. Touch-up paint is inside the toolbox. Use it as needed.
2. Turn vertical handwheel counterclockwise (spindle up) to take out spindle support block.
Move machine to appropriate location. Put 5 leveling screw, nut and pad on machine (follow picture).
Remove the three hooks and one lock nut.
3. Check input power that will be used for the machine. Power required for our machines are: 230V three phase
(3Φ) or 460V three phase (3Φ). Power must be first specified upon ordering. Please connect the power to L1, L2,
L3, Ground terminal as follows with minimum current of 12 amps (230V).
4. Hook up electronic conduct connectors and wire, from hydraulic system, one fr om dust suction and coolant system (U5,V5,W5, and Ground).
5. Connect two corresponding hydraulic hoses: A-A, B-B as labeled.
6. Fill up hydraulic oil (minimum 20 gallons) and lubricating oil . Make sure filling gauge is at F.