PROCEDURE TO SETUP SUPRA 618AHII SURFACE GRINDER
1. Unwrap the machine and check out machine for any physical damage. If so, report to your dealer as soon as possible. Touch-up paint is inside the toolbox. Use it as needed.
2. Remove control support, turn control to face front.
3. Put downfeed handwheel on downfeed system. Lock the tightening nut.
4. Turn vertical handwheel clockwise (spindle up) to take out spindle support block (See figure on left). Move machine to appropriate location. Put 3 leveling screw, nut and pad on machine (See figure on right).
5. Remove the two brackets.
1
Travel Control
8. When putting back the table; the table bracket should be inside the stopper.
6. Put rubber pad behind table. Raise wheel all the way up, and put the crossfeed all the way out. Slide the table travel control dog to the end of the travel (See figure on left). Have two people lift table and set it on the rubber pad (See figure on right). Be cau-
tious, do not let the table touch the table travel sensor (See figure below).
7. Replace PVC tube with ball rolling way. Place the longer rack with 21 steel balls in the rear, and shorter rack with 20 steel balls in the front (See figure on left). Put
back table, but be cautious, do not let the table touch the table travel sensor (See
figure on right).
10. Hook up two elec­tronic conduct connec­tors and wire, from hydraulic system, one from dust suction and coolant system.
9. Check input power that will be used for the machine. Power required for our machines are: 230V three phase (3Φ) or 460V three phase (3Φ). Power m ust be first specifie d upon o rde rin g. Please connect the power to R.S.T.G Ground terminal as follows with mini­mum current of 9 amps (230V).
11. Connect two corresponding hydraulic hoses: A-A, B-B as la­beled to the hy­draulic system.