Heat & Glo LifeStyle PIER-HV-IPI User Manual

Size:
3.29 Mb
Download

Owner’s Manual

Installation and Operation

Models:

Pier-HV-IPI

ST-HV-IPI

LCOR-HV-IPI

RCOR-HV-IPI

READ THIS MANUAL BEFORE INSTALLING OR OPERATING THIS APPLIANCE. THIS INSTALLERS GUIDE MUST BE LEFT WITH APPLIANCE FOR FUTURE REFERENCE.

WARNING: IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY, OR DEATH.

-Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

-What to do if you smell gas

Do not try to light any appliance.

Do not touch any electrical switch.

Do not use any phone in your building.

Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions.

If you cannot reach your gas supplier, call the fire department.

-Installation and service must be performed by a qualified installer, service agency, or the gas supplier.

Printed in U.S.A. Copyright 2006

Heat & Glo, a brand of Hearth & Home Technologies Inc. 20802 Kensington Boulevard, Lakeville, MN 55044

WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE INJURY OR PROPERTY DAMAGE. REFER TO THIS MANUAL. FOR ASSISTANCE OR ADDITIONAL INFORMATION CONSULT A QUALIFIED INSTALLER, SERVICE AGENCY, OR THE GAS SUPPLIER.

1.This appliance may be installed in an aftermarket, permanently located, manufactured (mobile) home, where not prohibited by local codes.

2.This appliance is only for use with the type of gas indicated on the rating plate. This appliance is not convertible for use with other gases, unless a certified kit is used.

In the Commonwealth of Massachusetts:

• installation must be performed by a licensed plumber or gas fitter;

See Table of Contents for location of additional Commonwealth of Massachusetts requirements.

Please contact your Heat & Glo dealer with any questions or concerns. For the location of your nearest Heat & Glo dealer, please visit www.heatnglo.com.

This product may be covered by one or more of the following patents: (United States) 4593510, 4686807, 4766876, 4793322, 4811534, 5000162, 5016609, 5076254, 5113843, 5191877, 5218953, 5263471, 5328356, 5341794, 5347983, 5429495, 5452708, 5542407, 5601073, 5613487, 5647340, 5688568, 5762062, 5775408, 5890485, 5931661, 5941237, 5947112, 5996575, 6006743, 6019099, 6048195, 6053165, 6145502, 6170481, 6237588, 6296474, 6374822, 6413079, 6439226, 6484712, 6543698, 6550687, 6601579, 6672860, 6688302B2, 6715724B2, 6729551, 6736133, 6748940, 6748942, 6769426, 6774802, 6796302, 6840261, 6848441, 6863064, 6866205, 6869278, 6875012, 6880275, 6908039, 6919884, D320652, D445174, D462436; (Canada) 1297749, 2195264, 2225408, 2313972; (Australia) 780250, 780403, 1418504 or other U.S. and foreign patents pending.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

1

Safety and Warning Information

!before starting the installation. FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty.

!Prior to the first firing of the fireplace, READ the Using Your Fireplace section of theOwners Guide.

DO NOT USE this appliance if any part has been

!under water. Immediately CALL a qualified service technician to inspect the unit and to replace any part of the control system and any gas control which has been under water.

!THIS UNIT IS NOT FOR USE WITH SOLID FUEL.

Installation and repair should be PERFORMED by a

!qualified service person. The appliance and venting system should be INSPECTED before initial use and at least annually by a professional service person. More frequent cleaning may be required due to excessive lint from carpeting, bedding material, etc. It isIMPERATIVE that the unit’s control compartment, burners, and circulating air passagewaysBE KEPT CLEAN to provide for adequate combustion and ventilation air.

Always KEEP the appliance clear and free from

!combustible materials, gasoline, and other flammable vapors and liquids.

!NEVER OBSTRUCT the flow of combustion and ventilation air. Keep the front of the applianceCLEAR of all obstacles and materials for servicing and proper operations.

Due to the high temperature, the appliance should

!be LOCATED out of traffic areas and away from furniture and draperies. Clothing or flammable materialSHOULD NOT BE PLACED on or near the appliance.

!Children and adults should be ALERTED to the hazards of high surface temperature and shouldSTAY AWAY to avoid burns or clothing ignition.

Young children should be CAREFULLY SUPERVISED when they are in the same room as the appliance.READ andUNDERSTAND all instructions carefully

These units MUST use one of the vent systems

!described in the Installing the Fireplace section of the Installers Guide.NO OTHER vent systems or componentsMAY BE USED.

This gas fireplace and vent assembly MUST be

!vented directly to the outside and MUST NEVER be attached to a chimney serving a separate solid fuel burning appliance. Each gas applianceMUST USE a separate vent system. Common vent systems are

PROHIBITED.

INSPECT the external vent cap on a regular basis to

!make sure that no debris is interfering with the air flow.

!The glass door assembly MUST be in place and sealed, and the trim door assemblyMUST be in place on the fireplace before the unit can be placed into safe operation.

DO NOT OPERATE this appliance with the glass

!door removed, cracked, or broken. Replacement of the glass door should be performed by a licensed or qualified service person. DO NOT strike or slam the glass door.

!The glass door assembly SHALL ONLY be replaced as a complete unit, as supplied by the gas fireplace manufacturer.NO SUBSTITUTE material may be used.

!DO NOT USE abrasive cleaners on the glass door assembly.DO NOT ATTEMPT to clean the glass door when it is hot.

Turn off the gas before servicing this appliance. It is

!recommended that a qualified service technician perform an appliance check-upat the beginning of each heating season.

!Any safety screen or guard removed for servicing must be replaced before operating this appliance.

!DO NOT place furniture or any other combustible household objects within 36 inches of the fireplace front.

2

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Table of Contents

Í

Safety and Warning Information

.................................................. 2

Service Parts List .........................................................................

4

Approvals and Codes ................................................................

13

Í

Appliance Certification .................................................................................

13

Installation Codes ........................................................................................

13

High Altitude Installations .............................................................................

13

Requirements for the Commonwealth of Massachusetts ..............................

14

Getting Started ............................................................................

15

Introducing the Heat & Glo Gas Fireplaces ..................................................

15

Pre-installPreparation .................................................................................

15

Installing the Fireplace ...............................................................

19

Step 1. Locating the Fireplace ....................................................................

19

Step 2. Framing the Fireplace .....................................................................

20

Step 3. Installing the Vent System ..............................................................

23

A. Vent System Approvals .........................................................

23

B. Installing Vent Components ...................................................

30

Î C. Vent Termination ....................................................................

32

Step 4. Positioning, Leveling, and Securing the Fireplace ...........................

35

Step 5. The Gas Control System ................................................................

35

Step 6. The Gas Supply Line ......................................................................

36

Step 7. Gas Pressure Requirements ...........................................................

36

ÎStep 8. Wiring the Fireplace........................................................................

37

Step 9. Finishing .........................................................................................

40

Step 10. Installing Trim, Logs & Ember Material ..........................................

41

Installing the Trim ..........................................................................

41

Positioning the Logs ......................................................................

41

Shutter Settings ............................................................................

41

Glass Specifications ......................................................................

41

Preparing Electric Ember Bed and Lava Rock ...............................

41

Placing the Ember Material ...........................................................

43

Ember Light Bulb Replacement .....................................................

43

Step 11. Before Lighting the Fireplace ........................................................

44

Step 12. Lighting the Fireplace ...................................................................

44

After the Installation .....................................................................................

44

Maintaining and Servicing Your Fireplace ................................

45

Î= Contains updated information.

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

3

Service Parts

Pier-HV-IPI

 

 

(NG, LP) Exploded Parts Diagram

Beginning Manufacturing Date: 6-03

 

Ending Manufacturing Date: ______

 

 

3

 

 

 

 

1

 

 

4

5

 

 

 

 

2

 

6 Log Assembly

 

 

 

 

 

 

Grate

 

 

 

Bar

4

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Service Parts List (NG, LP)

PIER-HV-IPI

IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts.

 

 

 

 

AVAILABLE

 

 

 

 

TO SHIP IN 24

 

 

 

 

HOURS

ITEM

DESCRIPTION

SERIAL #

PART NUMBER

Î

 

Burner Orifice NG (#33DMS)

 

582-833

Y

 

 

 

 

 

 

Burner Orifice LP (#50DMS)

 

582-850

Y

 

 

 

 

 

1

End Glass Assembly

 

GLA-MS

Y

 

 

 

 

 

2

Glass Door Assembly

 

GLA-6TROC

Y

 

 

 

 

 

3

Burner Assembly

 

2005-006

Y

 

 

 

 

 

4

Log Grate

 

2005-012

 

5

Side Refractory

 

SRV2005-730

 

6

Log Set Assembly

 

LOGS-MSR

Y

7

Log 1

 

SRV2005-701

 

8

Log 2

 

SRV2005-700

 

 

 

 

 

 

9

Log 3

 

SRV2005-702

 

10

Log 4

 

SRV2005-703

 

 

 

 

 

 

11

Log 5

 

SRV2005-704

 

 

 

 

 

 

12

Log 6

 

SRV2005-705

 

 

 

 

 

 

13

Log 7

 

SRV703-703

 

 

Lava Rock Bag

 

2005-790

 

 

 

 

 

 

 

Flue Restrictor

 

385-128

 

 

 

 

 

 

 

Teco-Sil,5 lb. bag

 

700-790

 

 

 

 

 

 

 

Ember Mesh Assembly

 

2006-008

Y

 

Junction Box

 

4021-013

Y

 

 

 

 

 

 

Non-CombustibleBoard (side)

 

2006-136

 

 

 

 

 

 

 

Non-CombustibleBoard (end)

 

2006-137

 

 

3V Adaptor Plug

 

593-593A

Y

 

 

 

 

 

 

Battery Pack

 

593-594A

Y

 

 

 

 

 

 

Fiberglass Rope

 

060-455

 

 

 

 

 

 

 

Glass Latch Support Assembly

 

386-122A

Y

 

 

 

 

 

 

Mineral Wool

 

050-721

 

 

Conversion Kit NG

 

NGK-MS

Y

 

Conversion Kit LP

 

LPK-MS

Y

 

ACCESSORIES

 

 

 

 

Fan Kit

 

GFK-160A

 

 

Remote Control Kit

 

RC-SMART-HNG

 

 

Remote Control Kit

 

SMART-STAT-HNG

 

 

Remote Control - Multi-functional

 

RCT-MLT-HNG

 

 

Wall Switch, Multi-functional

 

WSK-MLT

 

 

Plug Adapator Kit (for WSK-MLT)

 

PLUG-ADP

 

 

Louvers with Mesh

 

MS-LOUVERS

 

 

Louvers with Mesh - End Panel

 

MS-LOUVERS-EP

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

5

Service Parts

ST-HV-IPI

(NG, LP) Exploded Parts Diagram

Beginning Manufacturing Date: 6-03

 

Ending Manufacturing Date: ______

 

 

4

 

2

 

 

1

3

5

Log Assembly

 

 

 

Grate

 

 

Bar

6

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

AVAILABLE TO
SHIP IN 24
HOURS

Service Parts List (NG, LP)

ST-HV-IPI

IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts.

ITEM

 

DESCRIPTION

SERIAL #

PART NUMBER

Î

 

 

Burner Orifice NG (#32DMS)

 

582-832

Y

 

 

 

 

 

 

 

 

Burner Orifice LP (#50DMS)

 

582-850

Y

 

 

 

 

 

 

1

 

Glass Door Assembly

 

GLA-6TROC

Y

 

 

 

 

 

 

2

 

Burner Assembly

 

2005-006

Y

 

 

 

 

 

 

3

 

Log Grate

 

2005-012

 

 

 

 

 

 

 

4

 

Side Refractory

 

SRV2005-730

 

 

 

 

 

 

 

5

 

Log Set Assembly

 

LOGS-MSR

Y

 

 

 

 

 

 

6

 

Log 1

 

SRV2005-701

 

 

 

 

 

 

 

7

 

Log 2

 

SRV2005-700

 

 

 

 

 

 

 

8

 

Log 3

 

SRV2005-702

 

 

 

 

 

 

 

9

 

Log 4

 

SRV2005-703

 

 

 

 

 

 

 

10

 

Log 5

 

SRV2005-704

 

 

 

 

 

 

 

11

 

Log 6

 

SRV2005-705

 

 

 

 

 

 

 

12

 

Log 7

 

SRV703-703

 

 

 

 

 

 

 

 

 

Lava Rock Bag

 

2005-790

 

 

 

 

 

 

 

 

 

Flue Restrictor

 

385-128

 

 

 

 

 

 

 

 

 

Teco-Sil,5 lb. bag

 

700-790

 

 

 

 

 

 

 

 

 

Hood, black

 

SRV60-143-BK

 

 

 

 

 

 

 

 

 

Ember Mesh Assembly

 

2005-008

Y

 

 

 

 

 

 

 

 

Non-CombustibleBoard

 

2005-172

 

 

 

 

 

 

 

 

 

Junction Box

 

4021-013

Y

 

 

 

 

 

 

 

 

Fiberglass Rope

 

060-455

 

 

 

 

 

 

 

 

 

Glass Latch Support Assembly

 

386-122A

Y

 

 

 

 

 

 

 

 

Mineral Wool

 

050-721

 

 

 

 

 

 

 

 

 

3V Adaptor Plug

 

593-593A

Y

 

 

 

 

 

 

 

 

Battery Pack

 

593-594A

Y

 

 

 

 

 

 

 

 

Conversion Kit NG

 

NGK-MS

Y

 

 

Conversion Kit LP

 

LPK-MS

Y

 

ACCESSORIES

 

 

 

 

 

Fan Kit

 

GFK-160A

 

 

 

Remote Control Kit

 

RC-SMART-HNG

 

 

 

Remote Control Kit

 

SMART-STAT-HNG

 

 

 

Remote Control - Multi-functional

 

RCT-MLT-HNG

 

 

 

Wall Switch, Multi-functional

 

WSK-MLT

 

 

 

Plug Adapator Kit (for WSK-MLT)

 

PLUG-ADP

 

 

 

Louvers with Mesh

 

MS-LOUVERS

 

 

 

Louvers with Mesh - End Panel

 

MS-LOUVERS-EP

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

7

Service Parts

LCOR-HV-IPI

 

 

(NG, LP) Exploded Parts Diagram

Beginning Manufacturing Date: 6-03

 

Ending Manufacturing Date: ______

1

6

2

3

15

4

5

 

7 Log Assembly

15

Part number list on following page.

8

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Service Parts List (NG, LP)

LCOR-HV-IPI

IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts.

 

 

 

 

 

AVAILABLE TO

 

 

 

 

 

SHIP IN 24

 

 

 

 

 

HOURS

ITEM

 

COMMON PARTS

SERIAL #

PART NUMBER

Î

 

 

 

 

 

 

 

 

Burner Orifice NG (#32DMS)

 

582-832

Y

 

 

 

 

 

 

 

 

Burner Orifice LP (#50DMS)

 

582-850

Y

 

 

 

 

 

 

1

 

End Glass Assembly

 

GLA-MS

Y

 

 

 

 

 

 

2

 

Glass Door Assembly

 

GLA-6TROC

Y

 

 

 

 

 

 

3

 

Burner Assembly

 

2005-006

Y

 

 

 

 

 

 

4

 

Log Grate

 

2005-012

 

 

 

 

 

 

 

5

 

Side Refractory

 

SRV2005-730

 

 

 

 

 

 

 

6

 

Refractory, Back

 

SRV2005-731

 

7

 

Log Set Assembly

 

LOGS-MSR

Y

 

 

 

 

 

 

8

 

Log 1

 

SRV2005-701

 

 

 

 

 

 

 

9

 

Log 2

 

SRV2005-700

 

 

 

 

 

 

 

10

 

Log 3

 

SRV2005-702

 

 

 

 

 

 

 

11

 

Log 4

 

SRV2005-703

 

 

 

 

 

 

 

12

 

Log 5

 

SRV2005-704

 

 

 

 

 

 

 

13

 

Log 6

 

SRV2005-705

 

 

 

 

 

 

 

14

 

Log 7

 

SRV703-703

 

 

 

 

 

 

 

 

 

Lava Rock Bag

 

2005-790

 

 

 

 

 

 

 

 

 

Flue Restrictor

 

385-128

 

 

 

 

 

 

 

 

 

Teco-Sil,5 lb. bag

 

700-790

 

 

 

 

 

 

 

 

 

Ember Mesh Assembly

 

2006-008

 

 

 

 

 

 

 

 

 

Non-CombustibleBoard (side)

 

2006-136

 

 

 

 

 

 

 

 

 

Non-CombustibleBoard (end)

 

2008-114

 

 

 

 

 

 

 

 

 

Junction Box

 

4021-013

 

 

 

 

 

 

 

 

 

Fiberglass Rope

 

060-455

 

 

 

 

 

 

 

 

 

Glass Latch Support Assembly

 

386-122A

Y

 

 

 

 

 

 

 

 

Mineral Wool

 

050-721

 

 

 

 

 

 

 

 

 

3V Adaptor Plug

 

593-593A

Y

 

 

 

 

 

 

 

 

Battery Pack

 

593-594A

Y

 

 

 

 

 

 

 

 

Conversion Kit NG

 

NGK-MS

Y

 

 

Conversion Kit LP

 

LPK-MS

Y

 

ACCESSORIES

 

 

 

 

 

Fan Kit

 

GFK-160A

 

 

 

Remote Control Kit

 

RC-SMART-HNG

 

 

 

Remote Control Kit

 

SMART-STAT-HNG

 

 

 

Remote Control - Multi-functional

 

RCT-MLT-HNG

 

 

 

Wall Switch, Multi-functional

 

WSK-MLT

 

 

 

Plug Adapator Kit (for WSK-MLT)

 

PLUG-ADP

 

 

 

Louvers with Mesh

 

MS-LOUVERS

 

 

 

Louvers with Mesh - End Panel

 

MS-LOUVERS-EP

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

9

Service Parts

RCOR-HV-IPI

 

 

(NG, LP) Exploded Parts Diagram

Beginning Manufacturing Date: 6-03

 

Ending Manufacturing Date: ______

6

5

15

1

4 3

2

7 Log Assembly

 

Part number list on following page.

Grate

Bar

 

 

10

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Service Parts List (NG, LP)

RCOR-HV-IPI

IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts.

 

 

 

 

 

AVAILABLE

 

 

 

 

 

TO SHIP IN 24

 

 

 

 

 

HOURS

ITEM

 

COMMON PARTS

SERIAL #

PART NUMBER

Î

 

 

 

 

 

 

 

 

Burner Orifice NG (#32DMS)

 

582-832

Y

 

 

 

 

 

 

 

 

Burner Orifice LP (#50DMS)

 

582-850

Y

 

 

 

 

 

 

1

 

End Glass Assembly

 

GLA-MS

Y

 

 

 

 

 

 

2

 

Glass Door Assembly

 

GLA-6TROC

Y

 

 

 

 

 

 

3

 

Burner Assembly

 

2005-006

Y

 

 

 

 

 

 

4

 

Log Grate

 

2005-012

 

 

 

 

 

 

 

5

 

Side Refractory

 

SRV2005-730

 

 

 

 

 

 

 

6

 

Refractory, Back

 

SRV2005-731

 

 

 

 

 

 

 

7

 

Log Set Assembly

 

LOGS-MSR

Y

 

 

 

 

 

 

8

 

Log 1

 

SRV2005-701

 

 

 

 

 

 

 

9

 

Log 2

 

SRV2005-700

 

 

 

 

 

 

 

10

 

Log 3

 

SRV2005-702

 

 

 

 

 

 

 

11

 

Log 4

 

SRV2005-703

 

 

 

 

 

 

 

12

 

Log 5

 

SRV2005-704

 

 

 

 

 

 

 

13

 

Log 6

 

SRV2005-705

 

 

 

 

 

 

 

14

 

Log 7

 

SRV703-703

 

 

 

 

 

 

 

 

 

Lava Rock Bag

 

2005-790

 

 

 

 

 

 

 

 

 

Flue Restrictor

 

385-128

 

 

 

 

 

 

 

 

 

Teco-Sil,5 lb. bag

 

700-790

 

 

 

 

 

 

 

 

 

Ember Mesh Assembly

 

2006-008

Y

 

 

 

 

 

 

 

 

Non-CombustibleBoard (side)

 

2006-136

 

 

 

 

 

 

 

 

 

Non-CombustibleBoard (end)

 

2008-114

 

 

 

 

 

 

 

 

 

Junction Box

 

4021-013

Y

 

 

 

 

 

 

 

 

3V Adaptor Plug

 

593-593A

Y

 

 

 

 

 

 

 

 

Battery Pack

 

593-594A

Y

 

 

 

 

 

 

 

 

Fiberglass Rope

 

060-455

 

 

 

 

 

 

 

 

 

Glass Latch Support Assembly

 

386-122A

Y

 

 

 

 

 

 

 

 

Mineral Wool

 

050-721

 

 

 

 

 

 

 

 

 

Conversion Kit NG

 

NGK-MS

Y

 

 

Conversion Kit LP

 

LPK-MS

Y

 

ACCESSORIES

 

 

 

 

 

Fan Kit

 

GFK-160A

 

 

 

Remote Control Kit

 

RC-SMART-HNG

 

 

 

Remote Control Kit

 

SMART-STAT-HNG

 

 

 

Remote Control - Multi-functional

 

RCT-MLT-HNG

 

 

 

Wall Switch, Multi-functional

 

WSK-MLT

 

 

 

Plug Adapator Kit (for WSK-MLT)

 

PLUG-ADP

 

 

 

Louvers with Mesh

 

MS-LOUVERS

 

 

 

Louvers with Mesh - End Panel

 

MS-LOUVERS-EP

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

11

Service Parts

PIER-HV-IPI,ST-HV-IPIL&RCOR-HV-IPI

(NG, LP) Exploded Parts Diagram

Beginning Manufacturing Date: 6-03

 

Ending Manufacturing Date: ______

13

14

9

8

7

10

11

12

 

1

 

 

6

 

 

 

 

 

 

 

 

 

2

3

4

5

 

 

 

 

 

 

 

 

AVAILABLE TO

 

 

 

 

 

 

SHIP IN 24

 

 

 

 

 

 

HOURS

ITEM

DESCRIPTION

 

SERIAL #

PART NUMBER

 

1

ON/OFF Rocker Switch

 

 

 

060-511

Y

2

ON/OFF Wire Assembly

 

 

 

060-521A

Y

3

Valve NG

 

 

 

750-500

Y

3

Valve LP

 

 

 

750-501

Y

4

Flexible Gas Connector

 

 

 

2005-009

Y

5

Module

 

 

 

593-592

Y

6

Wire Assembly

 

 

 

593-590A

Y

7

Ember Box Assembly

 

 

 

2005-114

Y

8

Pilot Assembly NG

 

 

 

385-510A

Y

8

Pilot Assembly LP

 

 

 

385-511A

Y

9

Pilot Bracket

 

 

 

2005-118

 

10

Gasket Orifice

 

 

 

2005-166

 

11

Valve Bracket

 

 

 

2005-120

 

12

Flex Ball Valve Assembly

 

 

 

302-320A

Y

13

Pilot Assembly Support

 

 

 

385-120

 

14

Ground Strap

 

 

 

385-512

 

 

Regulator, NG

 

 

 

NGK-DXV

Y

 

Regulator, LP

 

 

 

LPK-DXV

Y

 

Pilot Tube

 

 

 

446-301

Y

 

Orifice Spud NG

 

 

 

446-505

Y

 

Orifice Spud LP

 

 

 

446-517

Y

NOTE: Replacement bulbs to be supplied by homeowner. Recommended replacements: Sylvania Mini Candelabra 75 watts.

12

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

1Approvals and Codes

Appliance Certification

The Heat & Glo fireplace models discussed in this Installers Guide have been tested to certification standards and listed by the applicable laboratories.

Certification

MODELS: PIER-HV-IPI,ST-HV-IPI,LCOR-HV-IPI,RCOR-HV-IPI

LABORATORY: Underwriters LaboratoriesTYPE: Direct Vent Gas Fireplace HeaterSTANDARD: ANSI Z21.88•CGA2.22•UL307B

Installation Codes

The fireplace installation must conform to local codes. Before installing the fireplace, consult the local building code agency to ensure that you are in compliance with all applicable codes, including permits and inspections.

In the absence of local codes, the fireplace installation must conform to the National Fuel Gas Code ANSI Z223.1 (in the United States) or the CAN/CGA-B149Installation Codes (in Canada). The appliance must be electrically grounded in accordance with local codes or, in the absence of local codes with the National Electric Code ANSI/NFPA No. 70 (in the United States), or to the CSAC22.1 Canadian Electric Code (in Canada).

These models may be installed in a bedroom or bed-sittingroom in the U.S.A. and Canada.

High Altitude Installations

U.L. Listed gas appliances are tested and approved without requiring changes for elevations from 0 to 2,000 feet in the U. S. A. and in Canada.

When installing this appliance at an elevation above 2,000 feet, it may be necessary to decrease the input rating by changing the existing burner orifice to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a 2000 foot elevation in the U.S.A. or 10% for elevations between 2000 and 4500 feet in Canada. If the heating value of the gas has been reduced, these rules do not apply. To identify the proper orifice size, check with the local gas utility.

If installing this appliance at an elevation above 4,500 feet (in Canada), check with local authorities.

Heat & Glo Quality Systems registered by SGS ICS

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

13

NOTE: The following requirements reference various Massachusetts and national codes not contained in this document.

G.Requirements for the Commonwealth of Massachusetts

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-upis installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-upmay be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

Signage

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half(1/2) inch in size,“GAS

VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

Inspection

The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

Exemptions

The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

Detailed instructions for the installation of the venting system design or the venting system components; and

A complete parts list for the venting system design or venting system.

Gas Equipment Venting System NOT Provided

When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the manufacturer:

The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

The “special venting systems” shall be ProductApproved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

See Gas Connection section for additional Commonwealth of Massachusetts requirements.

14

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

2Getting Started

Introducing the Heat & Glo Gas Fireplaces

Heat & Glo direct vent gas fireplaces are designed to operate with all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside.

The information contained in this Installers Guide, unless noted otherwise, applies to all models and gas control systems. Gas fireplace diagrams, including the dimensions, are shown in this section.

Pre-installPreparation

This gas fireplace and its components are tested and safe when installed in accordance with this Installers Guide. Report to your dealer any parts damaged in shipment, particularly the condition of the glass.Do not install any unit with damaged, incomplete, or substitute parts.

The vent system components are shipped in separate packages. The gas logs are packaged separately and must be field installed.

Read all of the instructions before starting the installation. Follow these instructions carefully during the installation to ensure maximum safety and benefit. Failure to follow these instructions will void the owner’s warranty and may present a fire hazard.

The Heat & Glo Warranty will be voided by, and Heat & Glo disclaims any responsibility for, the following actions:

Installation of any damaged fireplace or vent system component.

Modification of the fireplace or direct vent system.

Installation other than as instructed by Heat & Glo.

Improper positioning of the gas logs or the glass door.

Installation and/or use of any component part not manufactured and approved by Heat & Glo, not withstanding any independent testing laboratory or other party approval of such component part or accessory.

ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZARD.

When planning a fireplace installation, it’s necessary to determine:

Where the unit is to be installed.

The vent system configuration to be used.

Gas supply piping.

Electrical wiring.

Framing and finishing details.

Whether optional accessories—devicessuch as a fan, wall switch, or remotecontrol—aredesired.

If the fireplace is to be installed on carpeting or tile, or on any combustible material other than wood flooring, the fireplace should be installed on a metal or wood panel that extends the full width and depth of the fireplace.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

15

 

5-1/4

 

 

 

 

(133mm)

 

 

 

 

 

1/2

 

 

 

 

 

(13mm)

 

 

 

 

 

12

 

 

 

 

(306mm)

 

 

 

 

 

Ø8

 

 

 

 

 

(205mm)

 

 

 

12

Ø8

 

42-5/8

 

 

(305mm)

 

(1082mm)

 

 

 

(205mm)

 

 

 

 

 

ELECTRICAL

 

 

 

 

 

ACCESS

 

 

 

 

 

 

 

32-5/16

 

 

 

 

42

(820mm)

 

21-9/16

34-3/4

GAS LINE

(1067mm)

21-9/16

 

(547mm)

ACCESS

 

 

 

(883mm)

 

(547mm)

 

 

 

 

 

 

4-1/16

2-5/16

 

 

17-15/16

 

(58mm)

 

 

 

(102mm)

 

37-7/16

(455mm)

 

 

 

 

 

 

 

 

 

 

 

 

(950mm)

24

 

4-1/2

4-3/4

 

 

 

 

 

(610mm)

 

(114mm)

(121mm)

 

 

 

 

 

 

 

TOP VENT

 

 

 

 

 

COLLARS

 

TOP STANDOFFS

 

 

 

 

 

 

 

 

 

 

 

 

REAR VENT

 

 

 

 

 

COLLARS

 

 

 

 

SIDE GLASS

 

 

GAS CONTROLS

 

DOOR

 

 

 

& LABELS

 

 

GAS LINE

 

 

 

 

 

 

 

 

 

 

ACCESS

 

 

 

 

 

ELECTRICAL

 

 

 

 

 

ACCESS

 

Figure 1. Diagram of the PIER-HV-IPI

 

 

 

16

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

 

 

 

 

5-14

 

 

 

 

 

(133mm)

 

 

 

 

 

1/2

 

 

 

 

 

(13mm)

 

 

 

 

 

(4)

 

 

 

 

12

 

 

 

 

 

(306mm)

 

 

 

 

 

Ø8

 

 

 

 

 

(205mm)

 

 

 

 

 

12

 

 

 

 

 

(305mm)

 

 

 

 

 

Ø8

46-5/8

 

 

 

 

(205mm)

(1183mm)

 

 

 

 

ELECTRICAL

 

 

 

 

 

ACCESS

 

 

 

 

 

 

32-5/16

 

 

34-3/4

 

42

(821mm)

4-1/2

 

 

 

(114mm)

 

(882mm)

 

(1067mm)

21-9/16

 

 

 

 

GAS LINE

(548mm)

 

 

 

 

ACCESS

 

 

 

 

 

 

 

 

 

 

8-1/2

 

 

 

 

 

(216mm)

 

 

4-1/16

 

2-5/16

36-3/16

24

 

 

(58mm)

(919mm)

(610mm)

2-9/16

(102mm)

 

 

 

 

(64mm)

4-1/2

 

4-3/4

 

 

 

(114mm)

 

(121mm)

 

 

 

 

TOP VENT

 

 

 

 

COLLARS

 

 

 

 

 

TOP STANDOFFS

 

REAR VENT

 

 

 

 

 

 

 

 

 

 

COLLARS

 

 

 

GAS CONTROLS

SIDE GLASS

 

 

 

 

& LABELS

DOOR

 

 

 

 

 

 

GAS LINE

 

 

 

 

 

ACCESS

 

 

 

 

 

ELECTRICAL

 

 

 

 

 

ACCESS

 

Figure 2.

Diagram of the ST-HV-IPI

 

 

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

 

17

 

 

1/2

 

 

 

5-1/4

(13mm)

 

 

 

(4)

 

 

 

(133mm)

 

 

 

 

Ø8

 

 

 

 

(205mm)

 

 

 

 

12-1/16

 

 

 

 

(306mm)

 

 

 

 

12

 

 

 

Ø8

(305mm)

42-5/8

 

17-15/16

 

 

(205mm)

 

 

 

(1083mm

 

(455mm)

 

 

 

 

ELECTRICAL

 

 

 

 

ACCESS

 

 

 

 

GAS LINE

 

 

 

 

ACCESS

 

 

 

34-3/4

 

 

21-9/16

 

(882mm)

 

 

21-9/16

2-9/16

 

(548mm)

 

 

(547mm)

 

(64mm)

 

42

 

 

 

 

2-5/16

 

(1067mm)

 

 

 

 

 

 

(58mm)

 

 

 

10

 

32-5/16

 

 

(254mm)

 

 

24-1/8

 

(821mm)

 

 

 

 

(612mm)

 

 

 

 

7-1/4

 

37-7/16

 

 

(184mm)

 

 

29-1/4

 

(950mm)

 

4-3/4

 

 

 

(743mm)

 

 

 

 

(121mm)

 

 

 

TOP VENT

 

TOP STANDOFFS

 

 

COLLARS

 

 

 

 

 

 

 

 

REAR VENT

 

 

 

 

COLLARS

SIDE GLASS

 

 

 

 

DOOR

 

 

 

 

 

 

END GLASS

 

GAS LINE

 

 

DOOR

 

 

 

 

ACCESS

 

GAS CONTROLS

 

 

 

 

 

 

 

& LABELS

 

 

ELECTRICAL

 

 

 

 

ACCESS

Figure 3. Diagram of the LCOR-HV-IPIandRCOR-HV-IPI

 

 

18

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

 

3Installing the Fireplace

Step 1. Locating the Fireplace

The diagram below shows space and clearance requirements for locating a fireplace within a room.

Note: Refer to Figure 4B for dimensions and appliance locations if installing a Pier-HV unit with a Catalina shelf and/or marble package.

GLASS

GLASS

 

PIER-HV-IPI

GLASS

RCOR-HV-IPI

TOP VIEW

TOP VIEW

36"

 

 

GLASS

 

GLASS

 

36"

36"

 

36"

 

GLASS

 

36"

ST-HV-IPI

 

GLASS

 

 

TOP VIEW

 

 

GLASS

36"

LCOR-HV-IPI

 

TOP VIEW

36"

GLASS

 

 

 

Figure 4A. Fireplace Dimensions and Locations

Note: Refer to the Catalina installation instruction included with kit for assembly and installation.

Note: This location diagram MUST be followed when installing aPier-HVwith a Catalina shelf/marble package since the fireplace is installed further from finished wall.

FINISHED

WALL

45 -1/4in. (1149mm)

50-1/2in.34-1/2 in.

7 in.

47-1/2in.

13/16 in.45-1/4in.

Marble sizes (inches):

Header ..................................

26 x 8

Side headers ..................

45-1/2x 8

Legs ................................

33-1/2x 7

Figure 4B.

Fireplace Locations/Dimensions with

 

Catalina Shelf/Marble Package ONLY

Clearance Requirements

The top, back, and sides of the fireplace are defined by stand-offs.The minimum clearance to a perpendicular wall extending past the face of the fireplace is one inch (25 mm). The metal ends of the fireplace mayNOT be recessed into combustible construction.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

19

Minimum Clearances

from the Fireplace to Combustible Materials

 

Inches

mm

Glass Sides or Ends

.......... 36 ....................

914

Floor ...................................

0 .......................

0

Rear Vent ...........................

1/2 .....................

13

Metal Sides or Ends ..........

1/2 .....................

13

Top ...................................

2 1/2 ...................

64

Ceiling* ..............................

31 ....................

787

*The clearance to the ceiling is measured from the top of the unit, excluding the standoffs (see Figures 37 & 38).

The distance from the unit to combustible construction is to be measured from the unit outer wrap surface to the combustible construction, NOT from the screw heads that secure the unit together.

Minimum Clearances

from the Vent Pipe to Combustible Materials

 

Inches

mm

Vertical Sections. .............

1 ................

25

Horizontal Sections

 

 

Top .....................................

3 ................

75

Bottom ...............................

1 ................

25

Sides .................................

1 ................

25

At Wall Firestops

 

 

Top ..................................

2 1/2 ............

63.7

Bottom ..............................

1/2 ...............

13

Sides .................................

1 ................

25

For minimum clearances, see the direct vent termination clearance diagrams on pages 31 and 32 in this manual.

Step 2. Framing the Fireplace

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommodate wall coverings and fireplace facing material. The diagram below shows framing reference dimensions.

CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS BEFORE FRAMING.

!WARNING: FRAMING DIMENSIONS ASSUME USE OF 1/2 INCH THICK WALL COVERING

MATERIALS ON EXTERIOR OF FRAMING ONLY AND NO SHEETROCK ON INTERIOR OF FRAMING.

20

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Shows center of 10” x 12” vent framing holes for top and rear venting. The center of the hole is one inch (25.4mm) above the center of the horizontal vent pipe.

E

D

Framing should be constructed of 2 X 4 lumber or heavier.

ST-HV-IPI

PIER-HV-IPI

L & R-COR-HV-IPI

B

B

 

 

B

C

 

 

 

A

 

 

A

 

A

 

 

C

C

 

 

 

 

 

 

Model

A

B

C

D

E

 

PIER-HV-IPI

42-1/8

42-1/2

23

35-3/4

48

 

ST-HV-IPI

47-5/8

42-1/2

23

35-3/4

48

 

L&RCOR-HV-IPI

42-1/8

42-1/2

28-3/4

35-3/4

48

 

 

NOTE: DIMENSIONS SHOWN IN INCHES

 

 

 

 

 

 

 

 

 

Figure 5. Framing Dimensions

 

 

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

21

4

6

12

DVP4

DVP6

DVP12

14-1/4

12-3/16

2

MAX.

MIN.

 

 

24

DVP12A

36

48

9-7/8

DVP24

 

 

45.0O

10-1/4DVP45

DVP36

11-1/4

7-1/4

1-1/4TYP

DVP48

8-9/16

1/2 TYP

12-9/16

DVP90ST

NOTE: PIPES OVERLAP 1-1/4INCHES

AT EACH JOINT.

Figure 6. DVP-SeriesDirect Vent Component Specifications(5-inchinner pipe /8-inchouter pipe)

22

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Step 3. Installing the Vent System

A. Vent System Approvals

These models are approved to use DVP series direct vent pipe components and terminations (see Figures 6 and 7). Approved vent system components are labeled for identification. This pipe is tested and listed as an approved component of the fireplace. The pipe is tested to be run inside an enclosed wall. There is no requirement for inspection openings at each joint within the wall. There is no required pitch for horizontal vent runs. NO OTHER VENTING SYSTEMS OR COMPONENTS MAY BE USED.

Detailed installation instructions are included with each vent termination kit and should be used in conjunction with this

Installers Guide.

The flame and ember appearance may vary based on the type of fuel burned and the venting configuration used.

Identifying Vent Components

The vent systems installed on this gas fireplace may include one, two, or three 90° elbow assemblies. The relationships of vertical rise to horizontal run in vent configurations using 90° elbows MUST BE strictly adhered to. The rise to run relationships are shown in the venting drawings and tables. Refer to the diagrams on the next several pages.

NOTE: Two 45° elbows may be used in place of one 90° elbow. Rise to run ratios in the vent system must be followed if 45° elbows are used.

This model has a 450 elbow built into it. It may be positioned to vent either horizontal or vertical. Depending on the installation, decide which direction the elbow should be facing. Remove the 8 screws from the corner cover plate. Position the 450 elbow as desired and replace the corner cover plate with the 8 screws.

VERTICAL

STORM COLLAR

TERMINATION

 

 

ROOF FLASHING

HORIZONTAL

TERMINATION

WALL FIRESTOP

PIPE LENGTH

Terminations Kits

90 DEGREE ELBOW

CEILING

FIRESTOP

PVK-80DVP-TV

DVP-TRAP

DVP-TVHW

DVP-TB1

 

 

(Required to have a minimum of 3

 

 

feet of vertical in the vent system)

Figure 7. Vent System Components and Termination Kits

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

23

STRAIGHT UP

 

VERTICAL VENTING

 

V (FT.)

 

50' MAX. (15.2 M)

CAP

V

NOTE: On vertical venting configurations you may want to install the flue restrictor(385-128).See flue restrictor installation instructions.

Figure 8

Flue Restrictor Instructions

1.Locate the Flue Restrictor which is in the manual bag.

FLUE

RESTRICTOR

Figure 9

2.Break the Flue Restrictor into two pieces. Do this by bending the part back and forth until it breaks (see Figure 10).

BREAK

HERE

Figure 10. Flue Restrictor

4. Match the amount of vertical in the system with the chart to find the appropriate position to set the Flue Restrictor.

- CHART -

Vertical

Settings

4'

1-1

8'

1-2

15'

2-2

20'

2-3

25'

3-3

30'

4-3

35'

4-4

40'

4-4

50'

4-5

5. Center the Flue Restrictor on vent and secure in place using twoself-tappingscrews (see Figure 11).

 

1

2

3

4

5

 

 

 

 

 

SETTINGS

Figure 11

1

2

3

4

5

 

 

 

 

 

STRAIGHT OUT

 

 

 

 

 

HORIZONTAL VENTING

 

 

 

 

 

H

 

 

 

 

 

Max. Run

 

 

 

 

 

24" (610 mm)

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

Figure 12.

24

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

NATURAL GAS - VENTING WITH ONE 90° ELBOW

 

V (FT.)

H (FT.)

 

1' MIN. (305mm)

3' MAX. (914mm)

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

V + H = 50’ MAX. (15.2m)(11.3m)

 

PROPANE - VENTING WITH ONE 90° ELBOW

 

V (FT.)

H (FT.)

 

1' MIN. (305mm)

2' MAX. (610mm)

V

2' MIN. (610mm)

4' MAX.

(1.22m)

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

V + H = 50’ MAX. (15.2m)

 

H

Figure 13. Venting with One 90° Elbow

 

 

 

 

 

H

 

 

 

 

 

 

 

 

V

NATURAL GAS

 

 

PROPANE

 

 

VENTING WITH ONE 90° ELBOW

VENTING WITH ONE 90° ELBOW

 

V (FT.)

H (FT.)

V (FT.)

H (FT.)

 

900 Elbow on top

2.5’ MAX. (64mm)

900 Elbow on top

2’ MAX. (610mm)

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

 

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

6’ MAX. (1.83m)

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

V + H = 50’ MAX. (15.2m)

V + H = 50’ MAX. (15.2m)

 

Figure 14. Venting with One 90° Elbow

 

 

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

25

NATURAL GAS

 

H1

V

VENTING WITH TWO 90° ELBOWS

H

 

V (FT.)

H + H1 (FT.)

 

 

 

900 Elbow on top

2.5’ MAX. (64mm)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

 

V + H + H1 = 50’ MAX. (15.2m)

 

 

H + H1 = 18’ MAX. (5.5m)

 

 

 

PROPANE

 

 

 

VENTING WITH TWO 90° ELBOWS

 

 

V (FT.)

H + H1 (FT.)

 

 

900 Elbow on top

2’ MAX. (610mm)

 

 

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

 

V + H + H1 = 50’ MAX. (15.2m)

 

 

H + H1 = 12’ MAX. (3.6m)

 

 

NATURAL GAS

 

 

 

VENTING WITH TWO 90° ELBOWS

 

 

V + V1 (FT.)

H (FT.)

 

 

900 Elbow on top

2.5’ MAX. (64mm)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

V1

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

V

V + V1 + H = 50’ MAX. (15.2m)

 

 

 

 

H

 

 

PROPANE

 

 

 

VENTING WITH TWO 90° ELBOWS

 

 

V + V1 (FT.)

H (FT.)

 

 

900 Elbow on top

2’ MAX. (610mm)

 

 

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

 

V + V1 + H = 50’ MAX. (15.2m)

 

 

Figure 15. Venting with Two 90° Elbows

 

 

26

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

 

NATURAL GAS

 

 

PROPANE

 

VENTING WITH TWO 90° ELBOWS

VENTING WITH TWO 90° ELBOWS

V (FT.)

H + H1 (FT.)

V (FT.)

H + H1 (FT.)

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

6’ MAX. (1.83m)

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

8' MAX.

(2.4m)

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

10' MAX.

(3.0m)

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

6’ MIN. (1.83m)

12' MAX.

(3.6m)

V + H + H1 = 50’ MAX. (15.2m)

V + H + H1 = 50’ MAX. (15.2m)

H + H1 = 18’ MAX. (5.5m)

H + H1 = 12’ MAX. (3.6m)

H1

 

 

 

 

 

 

 

 

V

 

 

 

 

 

H

 

 

Figure 16.

 

 

 

 

 

Venting with Two 90° Elbows

 

 

 

 

 

 

NATURAL GAS

 

PROPANE

 

 

VENTING WITH TWO 90° ELBOWS

VENTING WITH TWO 90° ELBOWS

 

V (FT.)

H + H1 (FT.)

V (FT.)

H + H1 (FT.)

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

 

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

6’ MAX. (1.83m)

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

6’ MIN. (1.83m)

12' MAX.

(3.6m)

V

V + H + H1 = 50’ MAX. (15.2m)

V + H + H1 = 50’ MAX. (15.2m)

 

H + H1 = 18’ MAX. (5.5m)

H + H1 = 12’ MAX. (3.6m)

 

H1

 

 

 

 

 

 

 

H

 

 

 

 

Figure 17. Venting with Two 90° Elbows

 

 

 

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

 

27

 

 

NATURAL GAS

 

 

PROPANE

 

 

 

VENTING WITH THREE 90° ELBOWS

 

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

V + V1 (FT.)

 

H + H1 (FT.)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

 

2' MAX. (610mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

 

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

3' MIN. (914mm)

 

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

4' MIN. (1.22m)

 

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

5’ MIN. (1.5m)

 

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

6’ MIN. (1.83m)

 

12' MAX.

(3.6m)

 

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

 

V+ V1 + H + H

1

= 50’ MAX. (15.2m)

 

 

H + H1 = 18’ MAX. (5.5m)

 

H + H1 = 12’ MAX. (3.6m)

V1

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

H1

 

 

 

 

 

 

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

H2

 

 

 

 

 

 

 

 

 

 

 

 

H1

 

 

 

 

 

 

 

 

 

 

H

 

 

 

NATURAL GAS

 

 

PROPANE

 

 

 

 

VENTING WITH THREE 90° ELBOWS

VENTING WITH THREE 90° ELBOWS

 

 

 

V + V1 (FT.)

H + H1 + H2 (FT.)

V + V1 (FT.)

 

H + H1 + H2 (FT.)

 

 

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

 

2' MAX. (610mm)

 

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

 

4' MAX.

(1.22m)

 

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

 

6’ MAX. (1.83m)

 

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

 

8' MAX.

(2.4m)

 

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

 

10' MAX.

(3.0m)

 

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

6’ MIN. (1.83m)

 

12' MAX.

(3.6m)

 

 

 

V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)

V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)

 

 

 

H + H1 + H2 = 18’ MAX. (5.5m)

H + H1 + H2 = 12’ MAX. (3.6m)

 

 

 

Figure 18. Venting with three 90° elbows

 

 

 

 

 

 

 

28

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

 

 

 

 

H1

 

 

 

 

 

V1

 

 

 

 

 

 

V

 

 

H

 

 

NATURAL GAS

 

 

 

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

 

900 Elbow on top

2.5’ MAX. (64mm)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

 

 

H + H1 = 18’ MAX. (5.5m)

PROPANE

 

 

 

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

 

900 Elbow on top

2’ MAX. (610mm)

 

 

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

V1

 

H + H1 = 12’ MAX. (3.6m)

H1

 

 

V

 

 

 

H

 

 

 

 

 

Figure 19. Venting with three 90° elbows

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

29

B. Installing Vent Components

After determining which direction the 45O elbow will be used follow venting instructions accordingly.

This fireplace comes ready to vent vertically.

To vent off the unit horizontally, the elbow cover plate must first be removed from the unit (see Figure 20).

The elbow can be removed from the unit by aligning the seams of the elbow to the arrows on the surrounding heat shield (see Figure 21).

Position the elbow in the vertical position. Snap in place with the starting collar.

Replace the elbow cover plate aligning it with the elbow and secure in place with the 8 screws.

Place the rope ring around the first section of pipe and slide it up against the cover plate.

NOTE: The rope ring is needed for heat management and to prevent cold air infiltration.

ELBOW COVER PLATE

Figure 20

 

HEAT

ARROWS

SHIELD

ELBOW

ELBOW SEAM

FRONT VIEW

Figure 21

TOP VIEW

Venting Out Vertically

If the vertical vent component is over 4 feet, you may want to install the flue restrictor (located in the bag containing the install manual) to improve flame appearance. Center the flue restrictor on the 5” flue being used, and with self tapping screws secure the restrictor to the inside of the firebox as shown in Figure 22.

FLUE

RESTRICTOR

Figure 22

1. Attach the First Vent Component to the Starting Collars

To attach the first vent component to the starting collars of the fireplace:

Slide the first vent section onto the unit and push in until they snap lock in position.

Rotate this section to the desired position.

Using the two tabs provided on the elbow cover plate, secure the first section of venting to the fireplace with two screws.

Refer to Cinch Pipe and Termination Cap installation instructions.

If the installation is for a termination cap attached directly to the fireplace, skip to the sections, Install Firestops and

Vent Termination.

30

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

2. Continue Adding Vent Components

Refer to Cinch Pipe and Termination Cap installation instructions.

Continue adding vent components, locking each succeeding component into place.

Ensure that each succeeding vent component is securely fitted and locked into the preceding component in the vent system. Securing pipe sections with a maximum of two screws is recommended.

90° elbows may be installed and rotated to any point around the preceding component’s vertical axis. If an elbow does not end up in a locked position with the preceding component, attach with a minimum of two (2) sheet metal screws.

3.Install Support Brackets

Refer to Cinch Pipe and Termination Cap installation instructions.

4. Install Firestops

For Horizontal Runs - Firestops are REQUIREDon both sides of a combustible wall through which the vent passes.

NOTE: Model DVP-TRAPdoes not need an exterior firestop on an exterior combustible wall. The firestop is built into the cap.

To install firestops for horizontal runs that pass through either interior or exterior walls:

• Cut a 10” x 12” (254mm X 305mm) hole through the wall.

NOTE: The center of the hole is one (1) inch (25.4mm) above the center of the horizontal vent pipe.

Position the firestops on both sides of the hole previously cut and secure the firestops with nails or screws.

The heat shields of the firestops MUST BE placed towards the top of the hole.

Continue the vent run through the firestops.

NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.

10"

INTERIOR

WALL SHIELD

12"

Figure 23. 10" x 12" Hole and Vent Pipe

HEAT SHIELD

TRIM HEAT SHIELD IF TOO LONG, ADD TO SHIELD IF TOO SHORT

EXTERIOR

FIRESTOP

INTERIOR

FIRESTOP

Figure 24. Heat Shield, Interior & Exterior Firestops

For Vertical Runs - One ceiling firestop is REQUIREDat the hole in each ceiling through which the vent passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the vertical vent component.

Mark the ceiling to establish the centerpoint of the vent.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wiring or plumbing runs.

Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut an 10-inchX10-inch(254mm x 254mm) hole through the ceiling, using the centerpoint previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

10" (254mm)

10" (254mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

 

MEMBERS

 

CEILING

 

Figure 25 Hole & New Framing Members

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

31

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 26. Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).

NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.

 

NAILS (4 REQUIRED)

 

RAFTER

CEILING

 

 

CEILING FIRESTOP

Figure 27.

Attic Firestop

C. Vent Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal vent refer to the Cinch Pipe and Termination Cap installation instructions.

Push on and snap lock as described at the beginning of the Installing Vent Components section.

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior position on the building and interlock the flue sections.

WARNING: THE TERMINATION CAP MUST BE

!POSITIONED SO THAT THE ARROW IS POINTING UP.

For trapezoidal cap termination kits:

Using screws secure the cap to the exterior wall through the flanges in the cap.

!WARNING: VENTING TERMINALS SHALL NOT BE RECESSED INTO A WALL OR SID-

ING. VENT TERMINATION CLEARANCES MUST BE FOLLOWED TO AVOID FIRE DANGER. SEE VENT TERMINATION MINIMUM CLEARANCES DIAGRAM ON FOLLOWING PAGE.

7 1/4" (184mm)

Figure 28. Trapezoid Termination Cap

32

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

M

N

P

G R

v

D AH Q

E

(See Note 2)

v

L

B

 

 

 

 

 

 

 

 

V

 

 

 

 

 

U.S.

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

v

 

 

 

 

 

T

 

 

 

v

B

(3 FT)

 

 

 

 

 

 

v

 

 

S

 

S

 

 

 

 

 

 

V

Electrical

V

 

 

 

 

 

 

 

 

 

F

 

 

v

 

M

 

 

Service

 

 

v

 

 

 

 

 

 

 

 

 

I

v

X

 

D*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

J or K

 

V

 

 

 

 

 

V

= VENT TERMINAL

X = AIR SUPPLY INLET

 

 

 

= AREA WHERE TERMINAL IS NOT PERMITTED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

=

12" .......................

clearances above grade, veran-

 

 

 

 

6 ft. (Canada) .........

clearance to a mechanical

 

 

 

 

 

 

(See Note 1)

da, porch, deck or balcony

 

 

 

 

 

 

 

air supply inlet

 

 

 

B

=

12" .......................

clearances to window or door

 

L**

=

7 ft. .........................

 

clearance above paved

 

 

 

 

 

 

 

that may be opened, or to per-

 

 

 

 

 

 

 

sidewalk or a paved driveway

 

 

 

 

 

 

 

manently closed window.

 

 

 

 

(See Note 1)

located on public property

 

 

 

D*

=

18" .......................

vertical clearance to unventilat-

 

M*** =

18" .........................

 

 

clearance under veranda,

 

 

 

 

 

 

 

ed soffit or to ventilated soffit lo-

 

 

 

 

 

 

 

porch, deck, balcony or over-

 

 

 

 

 

 

 

cated above the terminal

 

 

 

 

 

 

 

hang.

 

 

 

 

 

 

 

 

 

 

 

 

 

36”

 

vinyl

 

 

 

 

 

 

 

 

*36”

for vinyl clad soffits and below

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

=

6”

 

non-vinylsidewalls

 

 

 

 

 

 

 

electrical service

 

 

 

 

 

F

=

9"

clearance to outside corner

 

 

 

 

12” .........................

 

vinyl sidewalls

 

 

 

 

P

=

8 ft.

 

 

 

 

 

 

 

G

=

6"

clearance to inside corner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

H

=

3 ft. (Canada) ......

not to be installed above a gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

RMAX

 

 

 

 

 

 

 

 

meter/regulator assembly within

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 cap

 

 

3 feet

2 x Q ACTUAL

 

 

 

 

 

 

 

 

3 feet (90cm) horizontally from the

 

 

 

 

 

 

 

 

 

 

 

 

 

center-lineof the regulator

 

 

 

2 caps

 

 

6 feet

1 x Q ACTUAL

 

 

Î

I

=

3 ft. .......................

clearance to gas service regu-

 

 

 

3 caps

 

 

9 feet

2/3 x Q ACTUAL

 

 

 

 

J

=

9" (U.S.A.)

lator vent outlet

 

 

 

4 caps

 

12 feet

1/2 x Q ACTUAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

 

 

 

 

 

 

 

12" (Canada) ........

clearance to non-mechanicalair

 

 

 

 

 

 

 

 

 

supply inlet to building or the

 

S

=

6" ..........................

 

 

clearance from sides of elec-

 

 

 

 

 

 

 

combustion air inlet to any other

 

 

 

 

(See Note 5)

 

trical service

 

 

 

 

 

 

 

appliance

 

 

 

 

 

 

 

 

K

=

3 ft. (U.S.A.)

 

T

= 12"

 

 

clearance above electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(See Note 5)

 

service

 

 

 

 

 

** a vent shall not terminate directly above a sidewalk or paved

 

NOTE 3: Local codes or regulations may require different

 

 

 

driveway which is located between two single family dwellings

 

clearances.

 

 

 

 

 

 

 

 

and serves both dwellings.

 

NOTE 4: Termination caps may be hot. Consider their proximity to

 

 

 

 

 

 

 

 

 

 

*** only permitted if veranda, porch, deck or balcony is fully open on

 

doors or other traffic areas.

 

 

 

 

 

 

a minimum of 2 sides beneath the floor, or meets Note 2.

 

NOTE 5: Location of the vent termination must not interfere with

 

 

 

 

 

 

 

 

 

 

NOTE 1: On private property where termination is less than 7 feet

 

access to the electrical service.

 

 

 

 

 

above a sidewalk, driveway, deck, porch, veranda or balcony, use of

 

WARNING: In the U.S: Vent system termination isNOT permitted

 

 

a listed cap shield is suggested.

 

 

 

 

in screened porches. You must follow side wall, overhang and

 

 

 

 

 

 

 

 

 

 

NOTE 2: Termination in an alcove space (spaces open only on one side

 

ground clearances as stated in the instructions.

 

 

and with an overhang) are permitted with the dimensions specified for

 

In Canada: Vent system termination isNOT permitted in screened

 

 

vinyl or non-vinylsiding and soffits.1. There must be 3 feet minimum

 

 

 

 

porches. Vent system termination is permitted in porch areas

 

 

between termination caps. 2.

All mechanical air intakes within 10 feet

 

with two or more sides open. You must follow all side walls,

 

 

of a termination cap must be a minimum of 3 feet below the termination

 

overhang and ground clearances as stated in the instructions.

 

 

cap. 3. All gravity air intakes within 3 feet of a termination cap must be

 

Heat & Glo assumes no responsibility for the improper perfor-

 

 

a minimum of 1 foot below the termination cap.

 

 

 

 

mance of the fireplace when the venting system does not meet

 

 

 

 

 

 

 

 

 

 

Figure 29. Vent Termination Minimum Clearances

 

these requirements.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE

INSTALLED.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

33

For Vertical Terminations - To locate the vent and install the vent sections:

Locate and mark the vent centerpoint on the underside of the roof, and drive a nail through the centerpoint.

Make the outline of the roof hole around the centerpoint nail.

The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a1-inch(25.4mm) clearance from the vertical vent pipe to combustible materials.

Mark the roof hole accordingly.

Cover the opening of the installed vent pipes.

Cut and frame the roof hole.

Use framing lumber the same size as the roof rafters and install the frame securely. Flashing anchored to the frame must withstand heavy winds.

Continue to install concentric vent sections up through the roof hole (for inside vent installations) or up past the roof line until you reach the appropriate distance above the roof (for outside terminations).

!WARNING: MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR

VENT HEIGHT ABOVE THE ROOF TOP. THESE MINIMUM HEIGHTS ARE NECESSARY IN THE INTEREST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMINATION CAP IS AT LEAST 20 INCHES FROM AVERTICAL WALL AND 2-FEETBELOW A HORIZONTAL OVERHANG.

NOTE: This also pertains to vertical vent systems installed on the outside of the building.

To seal the roof hole, and to divert rain and snow from the vent system:

Attach a flashing to the roof using nails, and use a nonhardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tightseal. Placenon-hardeningmastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the vent pipe and snap into place.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCH MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

TERMINATION

OPENING

 

 

 

CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 30. Minimum Height from Roof to Lowest Discharge Opening

34

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Step 4. Positioning, Leveling, and Securing the Fireplace

The diagram below shows how to properly position, level, and secure the fireplace.

NAILING

TABS

(BOTH SIDES)

Figure 31. Proper Positioning, Leveling, and

Securing of a Fireplace

Place the fireplace into position.

Level the fireplace from side to side and from front to back.

Shim the fireplace with non-combustiblematerial, such as sheet metal, as necessary.

Secure the fireplace to the framing by nailing or screwing.

Holes are provided in the base pan for securing the unit to the floor.

Step 5. The Gas Control System

!WARNING: THIS UNIT IS NOT FOR USE WITH SOLID FUEL.

IPI PILOT

FLAME

 

SENSOR

 

ROD

Figure 32. Gas Control System

Intermittent Pilot Ignition (IPI) System

This system includes a 3V control valve, electronic module and intermittent pilot.

!WARNING: CONTINUOUS 110-120VAC SERVICE MUST BE WIRED DIRECTLY TO

THE FIREPLACE JUNCTION BOX IN A IPI SYSTEM.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

35

Step 6. The Gas Supply Line

NOTE: Have the gas supply line installed in accordance with local building codes by a qualified installer approved and/or licensed as required by the locality. (In the state of Massachusetts installation must be performed by a licensed plumber or gas fitter).

NOTE: Before the first firing of the fireplace, the gas supply line should be purged of any trapped air.

NOTE: Consult local building codes to properly size the gas supply line leading to the 1/2 inch (13 mm) hook-upat the unit.

This gas fireplace is designed to accept a 1/2 inch (13 mm) gas supply line.

To install the gas supply line:

A listed (and State of Massachusetts approved) 1/2 inch (13mm) tee-handlemanualshut-offvalve and a listed flexible gas connector are connected to the 1/2 inch (13mm) inlet of the control valve.NOTE: If substituting for these components, please consult local codes for compliance.

Locate the gas line access hole in the outer casing of the fireplace.

The gas line may be run from either side of the fireplace provided the hole in the outer wrap does not exceed 2” in diameter and it does not penetrate the actual firebox.

Open the fireplace lower grille, insert the gas supply line through the gas line hole, and connect it to the shut-offvalve.

When attaching the pipe, support the control so that the lines are not bent or torn.

After the gas line installation is complete, all connections must be tightened and checked for leaks with a commercially-available,non-corrosiveleak check solution. Be sure to rinse off all leak check solution following testing.

!WARNING: DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS.

Insert insulation from the outside of the fireplace and pack the insulation tightly to totally seal between the pipe and the outer casing.

At the gas line access hole the gap between the supply piping and gas access hole can be plugged with noncombustible insulation to prevent cold air infiltration.

USE A WRENCH ON

SHUT-OFFVALVE

WHEN TIGHTENING

GAS LINE.

MANUAL

SHUT-OFF

VALVE

FLEX CONNECTOR

GAS VALVE

GAS LINE

CONTROL VALVE

ACCESS

Figure 33. Gas Supply Line

Step 7. Gas Pressure Requirements

Pressure requirements for Heat & Glo gas fireplaces are shown in the table below.

Pressure

Natural Gas

Propane

Minimum

5.0 inches

11.0 inches

Inlet Pressure

w.c.

w.c.

Maximum Inlet

14.0 inches

14.0 inches

Gas Pressure

w.c.

w.c.

Manifold

3.5 inches

10.0 inches

Pressure

w.c.

w.c.

 

 

 

A one-eighth(1/8) inch (3 mm) N.P.T. plugged tapping is provided on the inlet and outlet side of the gas control for a test gauge connection to measure the manifold pressure.

The fireplace and its individual shut-offvalve must be disconnected from the gas supply piping system during any pressure testing of the system at test pressures in excess ofone-half(1/2) psig (3.5 kPa).

The fireplace must be isolated from the gas supply piping system by closing its individual shut-offvalve during any pressure testing of the gas supply piping system at test pressures equal to or less thanone-half(1/2) psig (3.5 kPa).

36

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

BULB SOCKET

ASSEMBLY (3)

PLUG-IN

3V TRANSFORMER

ON/OFF

WALL SWITCH

FLAME SPARKER/

SENSOR

IGNITION

WHT

MODULE

 

(3V)

 

 

 

 

BLK

VALVE

LOW VOLTAGE

 

 

SEE NOTE 1

WHT

 

 

NEUTRAL

GROUND REMOTE

 

 

CONTROL HOT

 

ELECTRONICELECTRIC EMBERSEMBERS

Note: An alternate electric ember

 

switch can be installed on the wall

 

by connecting a minimum 14 gage

 

Romexto the leads supplied on

BLK

the back of the electric ember

switch.

 

BLACK WIRE CAN BE

 

PLUGGED INTO ANY OF

 

#1 - #5 LOCATIONS

 

ON THE HOT SIDE

 

Figure 34. Intermittent Pilot Ignition

(IPI) Wiring Diagram

IGNITION MODULE 3 VAC

BLK

WHT

BLK

SCALE 1/1

TERMINAL BLOCK

TRANSFORMER 3 VAC

WHT

WHITE WIRE

CAN BE

PLUGGED

INTO ANY

OF #1 - #5

LOCATIONS

ON THE

NEUTRAL

SIDE

PLUG IN

I

INTERMITTENT

PILOT IGNITOR

S

WHT

ORG

GROUND TO

FIREPLACE

CHASSIS

BRN

BRN

ORG

GRN

FLAME ON/OFF

VALVE

LCOR & RCOR JUNCTION BOX

Step 8. Wiring the Fireplace

NOTE: Electrical wiring must be installed by a licensed electrician.

CAUTION: DISCONNECT REMOTE CONTROLS IF ABSENT FOR EXTENDED TIME PERIODS. THIS WILL PREVENT ACCIDENTAL FIREPLACE OPERATION.

For Intermittent Pilot Ignition Wiring

Appliance Requirements

This appliance requires that 110-120VAC be wired to the junction box. Maintain correct polarity when wiring the junction box.

WARNING

Wire 110V to electrical junction box.

Do NOT wire 110V to valve.

Do NOT wire 110V to wall switch.

Incorrect wiring will damage millivolt valves.

Uninterrupted or continuous power is required at all times in IPI system EXCEPT when using batteryback-up.

Incorrect wiring will override IPI safety lockout and may cause explosion.

WARNING

Shock Hazard

Disconnect 110V before servicing.

• Electric ember lighting uses 110V.

Operation using Battery Power

This fireplace has an optional battery operation. The system is fully functional with the use of two “D” size batteries without ordinary 110-120VAC power.

Wiring to the battery pack should be left disconnected in order to conserve battery life. In the case of a loss of power, simply connect red and black wire leads to activate battery power (connect red to red, black to black). The fireplace can be used as necessary. Once power (110 VAC) is restored, disconnect red and black wire leads to extend battery life.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

37

NOTE: If any of the original wire as supplied with the appliance must be replaced, it must be replaced with the type 105oC rated wire.

TEMPERATURE

 

SENSOR SWITCH

 

FAN

JUNCTION

 

BOX

SPEED CONTROL (RHEOSTAT)

 

DETAIL A

SEE DETAIL A

SCALE 1/1

 

Figure 35. Fan Wiring Diagram

Optional Accessories

Optional fan and remote control kits require that 110-120VAC be wired to the factory installed junction box before the fireplace is permanently installed.

Fan Installation

Recommended fan locations for the type of fireplace you have (see Figures 36 and 37).

Wall Switch

Position the wall switch in the desired position on a wall. Run a maximum of 25 feet (7.8 m) or less length of 18 A.W.G. minimum wire and connect it to the fireplace ON/OFF switch pigtails.

CAUTION: LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPERAND DANGEROUS OPERATION. VERIFY PROPER OPERATION AFTER SERVICING.

FAN

Figure 36. Corner fan location

Corner fan location

It is recommended to position the fan in this location as shown. This will provide the best air flow (see Figure 36).

FAN

Figure 37. ST & PIER fan location

ST & Pier fan location

It is recommended to position the fan on the same side of the fireplace as the vent collars are on. This will provide the best air flow (see Figure 37).

38

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Wall Switch Installation for Fan (Optional)

If the box is being wired to a wall mounted switch for use with a fan (See Figure 38):

The power supply for the appliance must be brought into a switch box.

The power can then be supplied from the switch box to the appliance using a minimum of 14-3with ground wire.

At the switch box connect the black (hot) wire and red (switch leg) wire to the wall switch as shown.

At the appliance connect the black (hot), white (neutral) and green (ground) wires to the junction box as shown.

Add a 1/4 inch insulated female connector to the red (switch leg) wire, route it through the knockout in the face of the junction box, and connect to the top fan switch connector (1/4 inch male) as shown.

SWITCH

MINIMUM 14-3AWG

WITH GROUND

Red

 

 

 

Black

 

 

 

Black

 

 

 

White

 

 

White

Green

 

 

Green

JUNCTION BOX

Green

White

Black

Red

POWER

SUPPLY WIRES

SWITCH BOX

Red

Figure 38. Junction Box Wired to Wall Switch

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

39

Step 9. Finishing

Figures 39 and 40 show the minimum vertical and corresponding maximum horizontal dimensions of fireplace mantels or other combustible projections above the top front edge of the fireplace. See Figures 4 and 5 for other fireplace clearances. Only non-combustible

materials may be used to cover the black fireplace front.

WARNING: WHEN FINISHING THE FIREPLACE, NEVER ! OBSTRUCT OR MODIFY THE AIR INLET/OUTLET GRILLES

IN ANY MANNER.

CAUTION: IF JOINTS BETWEEN THE FINISHED WALLS AND THE FIREPLACE SURROUND (TOP AND SIDES) ARE SEALED, A 300° F. MINIMUM SEALANT MATERIAL MUST BE USED. THESE JOINTS ARE NOT REQUIRED TO BE SEALED. ONLY NONCOMBUSTIBLE MATERIAL (USING 300° F. MINIMUM ADHESIVE, IF NEEDED) CAN BE APPLIED AS FACING TO THE FIREPLACE SURROUND. SEE THE DIAGRAM BELOW.

 

 

 

 

 

 

 

NOTE: Sheetrock or other combustible mate-

 

 

 

 

 

 

 

rial such as wood can be placed on the top

 

 

MANTEL

12”

 

 

edge and sides of the fireplace.

 

 

 

 

 

 

 

 

 

 

11”

 

 

 

 

 

 

 

 

10”

 

 

 

 

 

 

 

 

9”

 

 

 

 

 

 

 

8”

 

 

 

ST-HV-IPI

 

 

 

7”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6”

 

 

 

 

TOP EDGE

 

 

5”

 

 

 

Mantel dimensions shown are

 

 

 

 

4”

 

 

 

 

 

 

 

 

 

 

16” *for standard hood on models:

 

 

 

3”

 

 

 

 

 

SIDE EDGE

 

 

 

13” 14”

15”

PIER-HV-IPI,LCOR-HV-IPI,

 

 

2”

 

 

 

and RCOR-HV-IPI.

 

 

1”

 

 

10”

11” 12”

 

 

 

 

 

 

8”

9”

 

 

 

 

 

 

6”

7”

 

 

 

To use mantel dimensions

 

 

 

5”

 

 

 

 

*shown the fireplace must have

 

 

 

 

 

 

 

 

the standard hood replaced

 

 

 

 

 

 

 

 

with a larger hood (060-143)

 

0” GAP

 

 

 

 

 

 

on model: ST-HV-IPI.

 

 

HOOD *

NOTE: 12” mantel

PIER-HV-IPIandL&RCOR-HV-IPI

 

 

 

 

 

TOP EDGE

 

 

 

 

at 16” above hood.

 

Figure 39.

Minimum Vertical and Maximum Horizontal

 

SIDE EDGE

Dimensions of Combustibles above Fireplace

 

 

 

 

 

MANTEL

12”

 

 

 

 

 

 

 

 

11”

 

 

 

 

 

 

 

 

10”

 

 

 

 

 

 

 

 

9”

 

Mantel dimensions shown are

 

 

 

 

 

 

8”

 

 

 

 

 

 

7”

 

 

*for standard hood on model:

 

0” GAP

 

 

 

6”

 

 

ST-HV-IPI

Figure 41.

Sealant Material

 

 

 

5”

 

 

 

 

 

 

 

 

 

 

 

 

 

4”

 

 

 

 

 

 

 

 

3”

 

 

 

 

 

 

 

 

2”

 

 

 

 

Hearth Extensions

 

1”

 

 

21” 22”

 

 

 

 

 

 

A hearth extension may be desirable for

 

 

 

 

 

23”

 

 

 

 

 

 

 

19” 20”

 

 

aesthetic reasons. However,ANSI or CAN/CGA

 

 

 

17” 18”

 

 

testing standards do not require hearth

 

 

 

16”

 

 

 

 

12” 13” 14” 15”

 

 

 

extensions for gas fireplace appliances.

 

 

HOOD *

 

NOTE: 12” mantel at

 

 

 

 

 

 

 

23” above hood.

 

 

Figure 40.

 

Minimum Vertical and Maximum Horizontal

 

 

 

Dimensions of Combustibles above Fireplace

 

 

40

 

 

 

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Step 10. Installing Trim, Logs & Ember Material

Installing the Trim

Combustible materials may be brought up to the specified clearances on the side and top front edges of the fireplace, but MUST NEVER overlap onto the front face. The joints between the finished wall and the fireplace top and sides can only be sealed with a 300° F. (149° C) minimum sealant.

WARNING: WHEN FINISHING THE FIREPLACE,

!NEVER OBSTRUCT OR MODIFY THE AIR INLET/ OUTLET GRILLES IN ANY MANNER.

Install optional marble and brass trim surround kits as desired. Marble, brass, brick, tile, or other non-combustiblematerials can be used to cover up the gap between combustible material (sheetrock or wood) and the fireplace.

Do not obstruct or modify the air inlet/outlet grilles. When overlapping on both sides, leave enough space so that the bottom grille can be lowered and the trim door removed.

Positioning the Logs

If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the instructions that accompany the logs. Save the log instructions with this manual.

If sooting occurs, the logs might need to be repositioned slightly to avoid excessive flame impingement.

Shutter Settings

 

 

NG

LP

___________________________________________

PIER-HV-IPI

 

3/8”

FULL OPEN

___________________________________________

ST-HV-IPI

 

3/8”

FULL OPEN

___________________________________________

L&RCOR-HV-IPI

3/8”

FULL OPEN

Glass Specifications

 

 

Model

Type

 

 

PIER-HV-IPI

TEMPERED

 

 

ST-HV-IPI

TEMPERED

 

 

L&RCOR-HV-IPI

TEMPERED

 

 

Heat & Glo fireplaces manufactured with tempered glass may be installed in hazardous locations such as bathtub enclosures as defined by the CPSC. The tempered glass has been tested and certified to the requirements of ANSI Z97.1-1984and CPSC 16 CFR 1202. (Safety Glazing Certification Council SGCC # 1595 and 1597. Architectural Testing, Inc. Reports02-31919.01and02-31917.01.)

This statement is in compliance with CPSC 16 CFR Section 1201.5 “Certification and labeling requirements” which refers to 15 USC 2063 stating “…Such certificate shall accompany the product or shall otherwise be furnished to any distributor or retailer to whom the product is delivered.”

Some local building codes require the use of tempered glass with permanent marking in such locations. Glass meeting this requirement is available from the factory. Please contact your dealer or distributor to order.

Preparing Electric Ember Bed and Lava Rock

The electric ember bed must be prepared before the logs are set up (see Figure 42).

Figure 42

Start by applying the teco-sil(granulated glass) to the base pan (see Figure 43).

Figure 43.

Pile a thin layer and follow the pattern on the base pan (see Figure 44).

Figure 44.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

41

Now the Lava rock can be applied (see Figure 45).

Make sure to paint the glass from both sides (see Figure 48).

Figure 45.

The lava rock should cover the remaining base pan area (see Figure 46). Do not put lava rock on top of the glass (teco-sil).

Figure 46.

Turn on the electric ember lights and paint the glass to a darkness as desired (see Figure 47).

Figure 47.

Figure 48.

The ember bed is now complete (see Figure 49.)

Figure 49.

42

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

Placing the Ember Material

Ember material is shipped with this gas fireplace. The bag labeled Glowing Ember (050-721)is standard glowing ember material.

To place the ember material:

Remove the glass door from the unit.

Place dime size pieces of ember material about 1/2 inch apart near port holes in burner top. Do NOT press embers into burner ports. Cover the top of the burner with a single layer of ember material.

Save the remaining ember materials for use during fireplace servicing. The bag of embers provided is sufficient for 3 to 5 applications.

Replace the glass door and a front trim door on the unit.

Figure 50. Placement of the Ember Material

Ember Light Bulb Replacement

In the lower gas valve compartment you will find three access panels for the three light bulbs (see Figure 51).

ACCESS PANEL

Figure 51.

Using a 5/16” nut driver remove the two bolts (see Figure 52).

ACCESS PANEL

Figure 52.

Pull the access panel to expose the light bulb. Wearing clean cotton gloves replace the bulb. Any skin oils which get on a new bulb will greatly shorten the life of the bulb. The bulb can be cleaned with isopropyl alcohol (see Figure 53).

Figure 53

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

43

Step 11. Before Lighting the Fireplace

Before lighting the fireplace, be sure to do the following:

Remove all paperwork from underneath the fireplace. Review safety warnings and cautions

Read the Safety and Warning Informationsection at the beginning of this Installers Guide.

Double-checkfor gas leaks

Before lighting the fireplace, double-checkthe unit for possible gas leaks.

Double-checkvent terminations and front grilles for obstructions.

Before lighting the fireplace, double-checkthe unit for possible obstructions that could be blocking the vent terminations or the front grilles.

Double-checkfor faulty components

Any component that is found to be faulty MUST BE replaced with an approved component. Tampering with the fireplace components isDANGEROUS and voids all warranties.

A small amount of air will be in the gas supply lines. When first lighting the fireplace, it will take a few minutes for the lines to purge themselves of this air. Once the purging is complete, the fireplace will light and will operate normally.

Subsequent lightings of the fireplace will not require this purging of air from the gas supply lines, unless the gas valve has been turned to the OFF position, in which case the air would have to be purged.

NOTE: The fireplace should be run 3 to 4 hours on the initialstart-up.Turn it off and let it cool completely. Remove and clean the glass. Replace the glass and run the fireplace for an additional 8 hours. This will help to cure the products used in the paint and logs.

During this break-inperiod it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the fireplace’s initial burning.

Step 12. Lighting the Fireplace

You’ve reviewed all safety warnings, you’ve checked the fireplace for gas leaks, you know the vent system is unobstructed, and you’ve checked for faulty components. Now you’re ready to light the fireplace.

WARNING: PLEASE REFER TO THE USER’S ! MANUAL FOR ALL CAUTIONS, SAFETY, AND WARNING INFORMATION PERTAINING TO THE LIGHTING AND OPERATION OF THE FIREPLACE.

After the Installation

LEAVE THIS INSTALLATION MANUAL WITH

!THE APPLIANCE FOR FUTURE REFERENCE.

44

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

4Maintaining and Servicing Your Fireplace

Fireplace Maintenance

Although the frequency of your fireplace servicing and maintenance will depend on use and the type of installation, you should have a qualified service technician perform an appliance check-upat the beginning of each heating season. See the table below for specific guidelines regarding each fireplace maintenance task.

IMPORTANT: TURN OFF THE GAS BEFORE SERVICING YOUR FIREPLACE.

Replacing old ember material

Frequency: Once annually, during the checkup.By: Qualified service technician.

Task: Brush away loose ember material near the burner. Replace old ember material with newdime-sizeand shape pieces of Golden Ember(GE-93)and Glowing Ember (050721). New ember material should be placed alternately on top of the burner - a layer of Golden Ember, a layer of Glowing Ember, and so on. Save the remaining ember material and repeat this procedure at your next servicing. For more information, seePlacing Ember Material.

Cleaning Burner and Controls Frequency:Once annually. By:Qualified service technician.

Task: Brush or vacuum the control compartment, fireplace logs and burner areas surrounding the logs.

Cleaning Flame Sensor Rod (IPI Systems) Frequency:Periodically.

By: Qualified service technician.

Task: Make a visual check of the straight flame sensor rod. Use emery cloth to carefully remove any existing white film or deposits.

Checking Flame Patterns, Flame Height

Frequency: Periodically.

By: Qualified service technician/Home owner.

Task: Make a visual check of your fireplace’s flame patterns. Make sure the flames are steady - not lifting or floating. See Figure 54. The flame sensor (IPI) tip should be covered with flame. See Figure 32.

MAKE SURE THE FLAMES

ARE STEADY—NOT

LIFTING OR FLOATING.

Figure 54. Burner Flame Patterns

Checking Vent System

Frequency: Before initial use and at least annually thereafter, more frequently if possible.

By: Qualified service technician/Home owner.

Task: Inspect the external vent cap on a regular basis to ensure that no debris is interfering with the flow of air. Inspect entire vent system for proper function.

Cleaning Glass Door

Frequency: After the first 3 to 4 hours of use. As necessary after initial cleaning.

By: Home owner.

Task: Remove and clean glass after the first 3 to 4 hours of use. After the initial cleaning, clean as necessary, particularly after adding new ember (flame colorant) material. Film deposits on the inside of the glass door should be cleaned off using a household glass cleaner.NOTE: DO NOT handle or attempt to clean the door when it is hot and DO NOT use abrasive cleaners.

Heat & Glo • PIER-HV-IPI,ST-HV-IPI,L&R-COR-HV-IPI2005-900Rev. K • 11/06

45