Xylem IM197 User Manual

ADDENDUM
Subject:
Revision to Impeller Assembly Process Effective August, 2006
INSTRUCTION MANUAL
IM197
To Be Used With Model and IOM Form Number:
NPE – IM013 MCC – IM060 MCS – IM052
DISASSEMBLY: To remove impeller, apply localized heat to the impeller hub to a tem­perature between 150oC - 250oC if needed. Heat Impeller hub for 1-3 minutes. This will decrease the breakloose strength of the Loctite 243 and allow for easy removal.
ASSEMBLY: To install impeller clean shaft thoroughly with denatured alcohol let dry. Apply Loctite 7649 primer to shaft, impeller threads and allow 3-5 minutes to dry. Ap­ply 3 drops of Loctite 243 medium strength threadlocker to shaft threads and 2 drops to the impeller threads. Tighten impeller to 144 lb-in or 12 lb-ft. No Jam nut needed. Allow impeller to cure for 30 minutes before testing or running.
Xylem Inc.
2881 East Bayard Street Ext., Suite A, Seneca Falls, NY 13148 Phone: (800) 453-6777 Fax: (888) 322-5877 www.xyleminc.com/brands/gouldswatertechnology
Goulds is a registered trademark of Goulds Pumps, Inc. and is used under license.
© 2012 Xylem Inc. IM197 Revision Number 1 July 2012
Loading...