Xantrex Technology GT100E User Manual

0 (0)
Xantrex Technology GT100E User Manual

Owner’s Manual

GT100E MS Combiner Box for Master/Slave Configuration

GT100E MS Combiner Box for Master/Slave Configuration

Owner’s Manual

About Xantrex

Xantrex Technology Inc. is a world-leading supplier of advanced power electronics and controls with products from 50 watt mobile units to one MW utility-scale systems for wind, solar, batteries, fuel cells, microturbines, and backup power applications in both grid-connected and stand-alone systems. Xantrex products include inverters, battery chargers, programmable power supplies, and variable speed drives that convert, supply, control, clean, and distribute electrical power.

Trademarks

GT100E MS Combiner Box for Master/Slave Configuration is a trademark of Xantrex International. Xantrex is a registered trademark of Xantrex International.

Other trademarks, registered trademarks, and product names are the property of their respective owners and are used herein for identification purposes only.

Notice of Copyright

GT100E MS Combiner Box for Master/Slave Configuration Owner’s Manual© January 2005 Xantrex International. All rights reserved.

Disclaimer

UNLESS SPECIFICALLY AGREED TO IN WRITING, XANTREX TECHNOLOGY INC. (“XANTREX”)

(a)MAKES NO WARRANTY AS TO THE ACCURACY, SUFFICIENCY OR SUITABILITY OF ANY TECHNICAL OR OTHER INFORMATION PROVIDED IN ITS MANUALS OR OTHER DOCUMENTATION.

(b)ASSUMES NO RESPONSIBILITY OR LIABILITY FOR LOSS OR DAMAGE, WHETHER DIRECT, INDIRECT, CONSEQUENTIAL OR INCIDENTAL, WHICH MIGHT ARISE OUT OF THE USE OF SUCH INFORMATION. THE USE OF ANY SUCH INFORMATION WILL BE ENTIRELY AT THE USER’S RISK.

Date and Revision

January 2005 Revision A

Part Number

152602

Contact Information

Telephone:

1 800 670 0707

(toll free North America)

 

1 360 925 5097

(direct)

Fax:

1 800 994 7828

(toll free North America)

 

1 360 925 5143

(direct)

Email:

customerservice@xantrex.com

Web:

www.xantrex.com

About This Manual

Purpose

The purpose of this Owner’s Manual is to provide explanations and procedures for installing and configuring the GT100E MS Combiner Box for Master/Slave Configuration.

Scope

The Manual provides safety guidelines, procedures for installing the GT100E MS Combiner Box for Master/Slave Configuration, as well as information about configuring the combiner box. It does not provide details about the GT100E Grid Tie Inverter. You need to consult the GT100E Grid Tie Inverter Installation Manual (P/N 152364) and GT100E Grid Tie Inverter Operation, Maintenance and Troubleshooting Manual (P/N 152365) for this information.

Audience

The Manual is intended for anyone who needs to install and operate the GT100E MS Combiner Box for Master/Slave Configuration. Installers should be certified technicians or electricians.

Organization

This Manual is organized into three chapters:

Chapter 1, “Introduction”, Chapter 1 contains a description of the GT100E MS and lists the different operating states available with the GT100E MS Combiner Box.

Chapter 2, “Installation”, Chapter 2 contains procedures on how to mount the GT100E MS and make the cable connections.

Chapter 3, “Configuration”, Chapter 3 describes how to configure the GT100E MS for Master/Slave configuration.

iii

About This Manual

Conventions Used

The following conventions are used in this guide.

WARNING

Warnings identify conditions or practices that could result in personal injury or loss of life

CAUTION

Cautions identify conditions or practices that could result in damage to the unit or other equipment.

Important: These notes describe things which are important for you to know, but not as serious as a caution or warning.

Related Information

You can find more information about Xantrex Technology Inc. as well as its products and services at www.xantrex.com

iv

152602

Important Safety Instructions

WARNING

This chapter contains important safety and operating instructions. Read and keep this Owner’s Manual for future reference.

1.Before installing and using the GT100E MS Combiner Box for Master/Slave Configuration, read all instructions and cautionary markings on the GT100E MS Combiner Box for Master/Slave Configuration, GT100E Grid Tie Inverter, and all appropriate sections of this manual.

2.Use only attachments recommended or sold by the manufacturer. Doing otherwise may result in a risk of fire, electric shock, or injury to persons.

3.To avoid a risk of fire and electric shock, make sure that existing wiring is in good condition and that wire is not undersized. Do not operate the GT100E MS Combiner Box for Master/Slave Configuration with damaged or substandard wiring.

4.Do not operate the GT100E MS Combiner Box for Master/Slave Configuration if it has received a sharp blow, been dropped, or otherwise damaged in any way. If the GT100E MS Combiner Box for Master/Slave Configuration is damaged, see the Warranty section.

5.Do not disassemble the GT100E MS Combiner Box for Master/Slave Configuration. It contains no user-serviceable parts. See Warranty for instructions on obtaining service. Attempting to service the GT100E MS Combiner Box for Master/Slave Configuration yourself may result in a risk of electrical shock or fire. Internal capacitors remain charged after all power is disconnected.

6.To reduce the risk of electrical shock, disconnect both AC and DC power from the GT100E Grid Tie Inverter and the GT100E MS Combiner Box before attempting any maintenance or cleaning or working on any circuits connected to the GT100E MS Combiner Box for Master/Slave Configuration. Turning off controls will not reduce this risk.

v

vi

Contents

Important Safety Instructions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -v

1 Introduction

GT100E MS Combiner Box - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–2

Master/Slave Configuration - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–2

Master Unit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–3

Slave Unit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–3

Master/Slave Operation States - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–3

Fault Condition - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–4

Mis-configuration of Units - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–4

2 Installation

Equipment Required - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- 2–2

Unpacking the GT100E MS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- 2–2

Mounting Instructions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- 2–4

Cable Installation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–5

Wire Gauge and Torque Specifications - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–5

Wire Gauge Requirements for the GT100E MS Combiner Box - - - - - - - - -

2–5

Torque Specifications for the GT100E MS Combiner Box - - - - - - - - - - - -

2–5

MS100E Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–6

Input/Output Access Panels - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–6

PV Array and GT100E Connections - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–7

GT100E MS Control Power Cable - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–10

MS100E Interface Assembly Installation for GT100E #1 Mounting Instructions 2–11

GT100E Unit Installation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–14

3 Configuration

Master/Slave Configuration - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–2

Warranty and Product Information - - - - - - - - - - - - - - - - - - - - - - - - - - WA–1

152602

vii

viii

Figures

Figure 1-1

Configuration Diagram - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1–4

Figure 2-1

GT100E MS Componenets - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–3

Figure 2-2

Wall Mounting Bracket Locations - - - - - - - - - - - - - - - - - - - - - - - - - - -

2–4

Figure 2-3

Input/Output Access Panel Location- - - - - - - - - - - - - - - - - - - - - - - - - -

2–6

Figure 2-4

PV Array and GT100E Connections- - - - - - - - - - - - - - - - - - - - - - - - - -

2–7

Figure 2-5

PV Array #1 and GT100E #1 Connections - - - - - - - - - - - - - - - - - - - - -

2–8

Figure 2-6

PV Array #2 and GT100E #2 Connections - - - - - - - - - - - - - - - - - - - - -

2–9

Figure 2-7

GT100E MS Power Control Cable Connections - - - - - - - - - - - - - - - - - -

2–10

Figure 2-8

Location of GT100E MS in the GT100E - - - - - - - - - - - - - - - - - - - - - - -

2–11

Figure 2-9

GT100E MS Interface Assembly Installation - - - - - - - - - - - - - - - - - - - -

2–12

Figure 2-10

GT100E MS Interface Assembly Cable Connection - - - - - - - - - - - - - - -

2–13

Figure 2-11

GT100E MS Control Power and Interface Cable Connection - - - - - - - - -

2–14

152602

ix

x

Loading...
+ 28 hidden pages