Wolf CSW 120, TSW 120 Installation Instructions Manual

Installation instructions
CSW/TSW DHW cylinder connection set for installation on finished walls
Wolf GmbH · D-84048 Mainburg · Postfach 1380 · Tel. +49-8751/74-0 · Fax +49-8751/741600
Part no. 30 48 457
11/05 GB
CSW / TSW connection set for installation on finished walls
Gas fired boiler and DHW cylinder positioning
Connection set ...SW-120 for surface installation
Connection panel
TSW without decorative panel
480
344 400
270-420790
1800-1950
CSW
270-420
1800-1950
790
DHW cylinder cutout for supply lines
810
TSW with decorative panel
480
344 400
Connection panel
1835 ± 10
Connection panel
Connection panel
Gas fired boiler and DHW cylinder pipework
Three-way changeover valve installation
DHW cylinder cutout for supply lines
780-800 300
DHW cylinder cutout for supply lines
Install the gas fired boiler in accordance with installation instructions.
Locate the DHW cylinder below and in alignment with the boiler.
Three-way changeover valve
Gas fired boiler
Primary flow DHW flow
P+T-Valve Domestic hot water
Domestic hot water cylinder
Gas supply pipe
P+T-pipe
DHW return vent valve
DHW flow vent valve
Evacuation Primary return
DHW return
Cold water
Tundish
Gas fired boiler and DHW cylinder are installed in the following steps as shown:
Dummy plug Primary
- Remove the dummy plug from the heating return.
return Elbow
Primary flow
- Remove the bend from the heating flow.
- Install the three-way changeover valve from the connection set with the enclosed gaskets to the heating flow.
Three-way changeover valve
2
Loading...
+ 2 hidden pages