Wolf ComfortLine CNK, FunctionLine Series, ComfortLine CNK-CB, ComfortLine CNU, ComfortLine CNU-CB Installation And Maintenance Instructions Manual

...
Installation and maintenance instructions
ComfortLine FunctionLine
Steel boilers up to 63 kW
Technology serving Mankind
Wolf GmbH · Postfach 1380 · 84048 Mainburg · Tel. +49 8751/74-0 · Fax +49 8751/741600 · Internet: www.wolf-heiztechnik.de
Part.-No. 30 60 917 Subject to modifications
2
Index
Index .............................................................................................................................. Page
Reference symbols / Safety instructions ............................................................................................3
Standards / Regulations ..................................................................................................................... 4-5
ComfortLine steel boilers ........................................................................................................................6
FunctionLine steel boilers ......................................................................................................................7
Installation ............................................................................................................................................ 8-9
Boiler installation on a plinth .............................................................................................................10
Boiler installation on a horizontal DHW cylinder...........................................................................11
Boiler assembly ...............................................................................................................................12-15
ComfortLine decorative panel installation................................................................................ 16-17
FunctionLine decorative panel installation.....................................................................................18
Flue pipe installation ............................................................................................................................19
Central heating boiler connections................................................................................................... 20
DHW cylinder to boiler pipework ....................................................................................................... 21
Filling the heating system............................................................................................................22-23
Draining the heating system .............................................................................................................. 24
Pressure jet oil burner installation / electrical supply .................................................................. 25
Initial start-up ........................................................................................................................................ 26
Commissioning report ..........................................................................................................................27
Maintenance ...................................................................................................................................28-29
Maintenance log............................................................................................................................. 30-31
Specification....................................................................................................................................32-33
Dimensions ......................................................................................................................................34-35
Troubleshooting .....................................................................................................................................36
3
Reference symbols / Safety instructions
The following symbols are used in conjunction with these important instructions concerning personal safety and technical reliability.
"Safety instructions" are instructions with which you must comply exactly, to prevent injury and material losses.
Danger through "live" electrical components. Please note: Switch OFF the ON/ OFF switch before removing the casing.
Never touch electrical components or contacts when the switch is in the ON position. This creates a risk of electrocution, which may cause injury or death.
The main supply terminals are "live" even when the ON/OFF switch is in the OFF position.
This indicates technical instructions which you must observe to prevent material losses and boiler malfunctions.
In addition to the installation instructions, operating instructions and adhesive labels are included or fitted to the boiler. These must also be observed.
Note
General
Authorised personnel should read these instructions before any installation, commissioning or maintenance work. Adhere to the instructions given in this document. Non-observance of these installation instructions voids any guarantee offered by WOLF.
Safety instructions
• Only use qualified and trained personnel for the installation, commissioning and maintenance of the boiler .
• In accordance with DIN EN 50110-1, work on electrical components (e.g. control units) may only be carried out by qualified electricians.
• The regulations of VDE/ÖVE and those of your local electricity supplier as well as all other local regulations are applicable to electrical installation work.
• Only operate the boiler within its output range which is stated in the specification supplied by WOLF .
• Appropriate use of the boiler refers to the exclusive use for hot water heating systems in accordance with DIN 4751.
• Never remove, bypass or otherwise disable any safety and monitoring equipment.
• The boiler may only be operated in perfect technical condition. Any faults and damage which may impact on safety which might limit the safe use of the equipment must be remedied immediately by a qualified contractor.
• Only replace faulty components or equipment with original WOLF spare parts.
4
Standards / Regulations
Standards and regulations
Observe all current Building Regulations and other local requirements.
Only recognised heating contractors may install WOLF boilers. This heating contractor will also be responsible for the proper installation and the commissioning of the heating system.
The boilers described in these installation instructions are low temperature boilers according to HeizAnlV and 92/42/EEC (Efficiency of Hot Water Boilers).
Locate the enclosed operating instructions in a clearly visible position in the boiler room.
Boilers may only be installed and operated in boiler rooms which are suitable according to the Landes-FeuVo [or local regulations].
The following regulations, rules and guidelines must be observed during installation:
• Boiler room guidelines or Building Regulations relating to the construction and installation of central boiler rooms and fuel storage facilities.
• Energy Savings Act (EnEG) and related directives (Heating Systems Order).
• DIN standards DIN 1988 Technical rules for DHW
installations
DIN 4701 Rules for calculating the heat
demand of buildings
DIN 4751 Part 3 - Safety Equipment
for heating systems with flow temperatures up to 95 °C
DIN 18160 Domestic chimneys
• VDE requirements: VDE 0100 General information
regarding the installation of HV systems with rated voltages up to 1000V
VDE 0105 Operation of HV systems,
general considerations
VDE 0722 Electrical equipment of
non-electrically heated heat generators
VDE 0470/ Protection through housings EN 60529
EN 60335-1 Safety of electrical
equipment for domestic use and similar purposes
Note: Please read these instructions
carefully before the installation and keep them in a safe place.
5
Steel boilers
according to DIN EN 303 as well as in accordance with EC Directive 90/396/EEC (gas consuming equipment), 73/23/EEC (Low Voltage Directive), 89/336/EEC (EMC Directive), 92/42/EEC (Efficiency of Hot Water Boilers) and 93/68/EEC (Identification Directive) for heating systems with heating circuit pumps and flow temperatures up to 110 °C and 3 bar permissible operating pressure in accordance with DIN 4751 and DHW cylinder pressure (max. 10 bar) in accordance with DIN 4753.
For the operation with pressure jet gas burners, the following gas device categories apply:
Standards / Regulations
Country abbreviation Country Gas device category
DE Germany II
2ELL3B/P
AT Austria II
2H3B/P
LU Luxembourg I2E or I
3+
The NOx limits required by the 1st BImSchV para. 7(2) are maintained.
6
ComfortLine steel boilers
Oil and gas-fired steel boiler, type CNK (boiler plinth, accessory)
Oil and gas-fired steel boiler, type CNK-CB incl. DHW cylinder
Oil and gas-fired steel boiler, type CNU incl. pressure jet oil burner (boiler plinth, accessory)
Oil-fired steel Unit boiler, type CNU-CB incl. DHW cylinder and pressure jet oil burner
7
Oil and gas-fired steel boilers, type FNK (boiler plinth, accessory)
Oil and gas-fired steel boiler, type FNK-FB/FE incl. DHW cylinder
Oil-fired steel Unit boiler, type FNU incl. pressure jet oil burner (boiler plinth, accessory)
Oil-fired steel Unit boiler, type FNU-FB/FE incl. DHW cylinder and pressure jet oil burner
FunctionLine steel boilers
8
Installation
The ventilation air supply must be ensured and comply with local regulations or those relating to gas installations. We recommend that you supply the boiler with fresh air directly from the outside. An insufficient fresh air supply can lead to fuel gas escaping,
which represents a risk to life (poisoning/suffocation).
Clearances towards walls and combustible materials must comply with local fire regulations, and should be at least 200mm, otherwise there is a high risk of
fire.
General tips regarding location
• Install the boiler with or without the DHW cylinder on a level surface which is substantial enough to carry its weight.
• Position the boiler and DHW cylinder (if installed) horizontally or slightly rising towards the back to ensure adequate venting of any trapped air (level with adjustable feet).
Only install the boiler and DHW cylinder (if installed) in a room safe from the risk of frost. Drain the boiler, the DHW cylinder and the entire heating system if there is a risk of frost, when the system has been shutdown, to prevent pipes from bursting.
Boilers should not be installed in areas subject to aggressive vapours, very dusty or highly humid conditions (workshops, washrooms, hobby rooms etc.). This prevents the optimum burner function from being achieved.
The combustion air supplied to the pressure jet oil burner must be free from halogenated hydrocarbons (e.g. as contained in sprays, solvents, cleaning fluids, paints and adhesives). Under the most unfavourable conditions, these may lead to pitting of the boiler and even the flue gas system.
Never store or use combustible material or liquids near the boiler.
Note
Note
9
1000
900
400
Installation
Transportation into the boiler room
To ease the transportation into the boiler room, lifting slings with lifting hooks are offered as accessories.
Only lift the boiler using all four lifting slings.
Lifting eyes for lifting slings
Recommended minimum wall clearance
Note
Boiler installation on adjustable feet
At the factory the boiler is equipped with four adjustable feet.
• Level the boiler with adjustable feet (accessory) horizontally or with a slight incline to the rear.
Adjustable
bolt
Feet
(accessory)
Adjustable bolt/ feet
Recommended minimum wall clearance
Maintain a minimum clearance between the boiler sides and walls of 400 mm to enable the boiler door with fitted burner to be opened. Ensure that sufficient space is available for cleaning and maintenance.
10
Boiler
Thermal insulation, boiler
Thermal insulation, boiler back
Thermal insulation, boiler front
Side casing
Control unit bracket
Boiler door
Back wall casing
Boiler installation on a plinth
2
3
4
5
Control unit housing
Casing cover
Spring shackles
Front casing
Type plate
Wolf logo
Plinth (accessory)
6
8
9
10
11
12
13
1
7
14
15
2
6
9
1
5 5
3
14
15
13
13
7
10
11 11
12
4
8
11
2
6
9
1
5 5
3
14
15
13
13
7
10
11 11
12
4
8
Boiler installation on a horizontal DHW cylinder
Boiler
Thermal insulation, boiler
Thermal insulation, boiler back
Thermal insulation, boiler front
Side casing
Control unit bracket
Boiler door
Back wall casing
2
3
4
5
Control unit housing
Casing cover
Spring shackles
Front casing
Type plate
Wolf logo
Horizontal DHW cylinder
6
8
9
10
11
12
13
1
7
14
15
Loading...
+ 25 hidden pages