ShoreLand'r SLR30BXLW User Manual V.1

®
SLR30BXLW
SLR30BXLW Bundles Required:
4300238 ST215/75R14C MR Tire/TS Dir Rim ...........2
(or)
4300239 ST215/75R14C MR Tire/Galv Dir Rim ........2
66520 Bag with Chains, No Coupler .....................1
62340 Literature Bag - Trailers .............................. 1
80285-- Frame Bundle - 2X4W R30BXLW ............. 1
66996-- Tongue Assembly 55”, W/UFP Actuator ..... 1
ShoreLand’r offers their product line in either galvanized or painted finish. When ordering parts it is important that you specify the finish or color you have on your product. The five (5) digit number along with a two (2) digit space _ _, note the parts which can be purchased with various finishes. When ordering these items use the five (5) digit number along with a two (2) digit suffix for the proper finish.
00 .........Galvanized
01 .........Arctic White
03 .........Black
33 .........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003438
Page 1
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Roller Assembly Instructions ........................................3
Tongue & Safety Chain Dwg/BOM. ..............................4
Safety Instructions ........................................................5
Tongue & Safety Chain Assy Instr. ............................... 5
White Ground Wire/Brakeline Assy Instr ...................... 5
Profile 2000 Winch Dwg/BOM/Assy Instr. ................... 6-7
Tire Size & Carrying Capacity Chart .............................8
Chassis Drawing & Bill of Materials .............................. 8-9
Spring Assembly Instructions ....................................... 9
Axle Assembly Instructions ...........................................9
One Axle Brake Installation Instr .................................. 9
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003438
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort by size.
R SERIES
The R-series roller rack is installed by placing the roller arm assembly mounting channel over the rear cross mem­ber and securing in place with a 1/2” x 4-1/2” hex bolt and lock nut. (See Diagram A). Note that it should be left loose until the boat is placed on the trailer. Once the proper positions is determined, it may be tight­ened. Repeat on the other roller arm assembly.
The short stabilizer bunk is installed to the adjustable bunk bracket on the front cross member with a 3/8” x 1” hex bolt and lock nut. (See Diagram A).
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003438
Page 3
Loading...
+ 7 hidden pages