SLB40TBAL, SLR40TBAL & SLRB40TBAL
Aluminum Trailers
SLB40TBAL
Bundles Required for SLB40TBAL
69082 Literature Bag - Trailers - Brakes 1
6744300 Frame Bundle, SLB40TBAL 1
6704600 55” Tongue Assy w/2 Brakes 1
*ST175/80R 13C Tire / Galv. Dir Rim 4
*Check with your dealer/customer service representative for current tire/rim assembly
part number.
SLR40TBAL
Bundles Required for SLR40TBAL
69082 Literature Bag - Trailers - Brakes 1
6816000 Frame Bundle, SLR40TBAL 1
6704600 55” Tongue Assy w/2 Brakes 1
*ST175/80R 13C Tire / Galv. Dir Rim 4
*Check with your dealer/customer service representative for current tire/rim assembly
part number.
SLRB40TBAL
Bundles Required for SLRB40TBAL
69082 Literature Bag - Trailers - Brakes 1
6744700 Frame Bundle, SLRB40TBAL 1
6704600 55” Tongue Assy w/2 Brakes 1
*ST175/80R 13C Tire / Galv. Dir Rim 4
*Check with your dealer/customer service representative for current tire/rim assembly
part number.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003628
Page 1 3/08/06
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003628
Page 2 3/08/06
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003628
Page 3 3/08/06
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003628
Page 4 3/08/06
IMPORTANT:
All hardware for your trailer is stainless steel. It is important
that you use an anti-seize material on the bolt threads when
assembling to prevent gaulding.
TONGUE
The tongue comes shipped positioned backwards in the
frame.
Remove the nut and bolt that holds the tongue in place
and discard. Remove the tongue from its shipping position
and install correctly in the front tongue channel.
See pages 4 & 5.
Li ne th e holes in the tong ue wi th th e h ole s in the
tongue chann el. Install the 1/2” X 4” hex bolt in the
front cross hole and secure with a 1/2” lock nut.
Remove the wire harness from the rear of tongue. Place
the wire harness and the brake line through the hole provided in the tongue cover plate. (See Detail F).
Secure the tongue cover plate in position with the same 1/2”
x 1-1/2” hex bolt that secures the back on the tongue to the
tongue channel of the frame.Secure with a 1/2” lock nut.
Tighten both bolts just installed.
Plug the tongue wire harness ends into the frame harnesses
by matching colors and ends. Push the extra wire provided
either into the rear of the tongue or else remove the grommet
in the side frame and place the extra wire in the side frame.
Replace grommets just removed.
White Ground Wire Installation
Place the self-tapping screw provided through the round
metal ring on the white ground wire of the tongue harness
located at the rear of the tongue. Attach the ground wire
to the main frame by driving the screw in the hole provided next to the tongue channel of the frame. This will assure a positive ground for the lighting.
Locate the brass brake line coupling. Remove the plastic cap
and thread the brake line coming out the rear of the tongue
into one end of the coupling. Bend the line in a smooth
gradual radius being careful not to kink the line. Bend so it
can be mated to the brake line from the side frame. Once
aligned thread the side frame brake line into the other end
of the coupling. Tighten both lines into the coupling.
ROCKER ARMS
Locate the rocker arms (Ref. No. 5 of the chassis schematic,
Page 3). Note that the center bushing has a grease zerk in it.
Position the rocker arms up into the center channel welded
in the center of the tandem spring bracket so that the grease
zerk is pointing down. Align the holes in the channel with the
rocker arm. Secure in place with a 3/4” x 4-1/2” hex bolt and
lock nut. Tighten. Repeat this process on the other rocker
arm and spring bracket. Grease the rocker at this time by
applying grease through the zerk just discussed.
NOTE: THE GREASE ZERK IS POSITIONED DOWN
SO THAT IT IS ACCESIBLE FOR SERVICING WHEN
NEEDED.
SPRINGS
Position the axles so they are properly aligned with the trailer.
Position the brake axle so that the disc brake calipers are
on the back side of the axle. The brake axle must always
be mounted as the rear axle to give you the best braking
possible (See Page 6). There is no right and left to the axle
without brakes. It can be mounted either way.
Place the springs on the topside of the spring pads welded
to the axle. (See chassis diagram). Note that the hook
end of the spring must be to the rear of the trailer. Place
a spring clamp on the top center of the spring as shown.
Next place the 1/2” x 6-1/2” U-bolts down over the top
of the spring clamp, spring and axle as shown.
Place the spring and axle U-bolt plate onto the ends of
the two U-bolts just placed. Secure in place with 1/2” lock
nuts. Thread onto the U-bolts but do not tighten securely
until the complete unit is in position on the trailer. Repeat on
the other spring.
AXLE
Place one of the spring bracket bushings (Ref.#37) into the
rear of the spring bracket and secure with a 9/16” x 3-1/4”
hex bolt and hex lock nut. Repeat in other spring bracket.
Position the rear axle under the frame, then hook the hook
loop of the springs around the bushings just installed.
Note that if the axle is positioned too low when trying to
hook, the hooks will not hook around the bushings.
Raise the front of the springs up so they align with the rear
hole in the axle boogie just installed. Secure in place with
9/16” x 3-1/4” hex bolts and lock nuts.
SAFETY CHAINS
Slip the 1/2” x 5” hex bolt through a 1/2” flat washer, place
through the last link of one of the safety chains.
Place the bolt with chain attached through the hole in the
bottom front of the actuator mounted on the tongue. Position
the second chain on the portion of the bolt extending through
the other side of the tongue. Secure with 1/2” flat washer and
hex lock nut.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003628
Page 5 3/08/06
Install another spring bracket bushing in the front hole on
the rock arm assembly. Secure with a 9/16” x 3-1/4” hex
bolt and lock nut. Tighten.
Hook the hook end of the springs mounted to the front axle
over the bushing just installed in the rocker arm assembly.
Then swing the front of the spring up and attach the front
mounting hole in the spring bracket with another 9/16” x
3-1/4” hex bolt and lock nut.
Tighten all axle U-bolts and spring bolts.
SINGLE AXLE BRAKE ASSEMBLY
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003628
Page 6 3/08/06