Plastic Lockers – 93000 Series
Models 93168 & 93368 Triple Tier
Assembly Instructions
Thank you for selecting Salsbury 93000 Series Plastic Lockers. We are confident that the quality and construction of the lockers will prove to be a
good investment. These instructions are intended to assist you in the assembly of the lockers. Individual job conditions will dictate whether the
lockers must be anchored to the wall, the floor, or both. Please read the entire assembly instruction document before beginning assembly.
Step 1. Insert the back panel tabs into the pockets along the rear
edge of the side panel. Tap with soft mallet to engage two (2) latch
points.
Step 4. Install a thinner top horizontal panel on top of the unit.
TOP PANEL
THINNER
SIDE
PANEL
Step 2. Press another side panel onto the tabs on the other side of
the back panel. Tap to engage as above.
Step 3. Join and press down the sides-and-back-panel assembly
from step 2 above into the base panel as shown below. The base
panel is the thicker of the four (4) horizontal panels provided. Then
thread four (4) leveling feet provided into the bottom of the base
panel.
BACK
PANEL
OTHER
SIDE PANEL
LOWER
(FIRST)
UNI
LOWER
Step 5. Assemble two (2) identical units the same as Steps 1
through 4, except installing the thinner top panel on each instead of
the thicker base panel. These units will not have leveling feet.
TOP
PANEL
SIDE
PANELS
Step 6. If no optional sloping hood is ordered, install the three (3)
filler strips into the recesses in the top panel of the upper unit.
FILLER
STRIPS
FILLER STRIPS
INSTALLED
(FIRST)
UPPER
nd
and 3
(2
UNITS
UNI
BACK
PANEL
rd)
BASE PANEL
THICKER)
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
LEVELING FEET
(NOT SHOWN)
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering
Copyright © 2012 Salsbury Industries. All rights reserved. 1/3/12 Page 1 of 3
@lockers.com
Plastic Lockers – 93000 Series
Models 93168 & 93368 Triple Tier
Assembly Instructions
Step 7. Stack the two (2) upper units onto the lower unit. Press all
units firmly together. Use a mallet if necessary.
PANEL WITH
FILLER STRIPS
(IF NO OPTIONAL
SLOPING HOOD)
ALL
UNITS
STACKE
Step 8. Install screws and hole covers where side panels join to top
panels and base panel. There are 14 screws and hole covers on
each of the two sides of the assembly (28 in total).
BASE PANEL
(THICKER)
Step 9. Attach the plastic oval lock plate to the front of the three (3)
doors with two (2) screws from the rear of the door. Insert the
stainless steel hasp through hole in front of doors making sure cutout
is facing downward. Secure by threading nut provided onto it from
rear. Insert lock knob through hasp from front of door making sure
hole in lock knob is facing downward. Attach cam to rear of lock
knob shaft with screw provided. Be sure the cam is pointing toward
the outside of the door and is properly engaged with the square shaft
end of the lock knob.
SCREW
CAM
NUT
SCREWS
LOCK
PLATE
Step 10. Fasten the six (6) hinges (two (2) for each of the three (3)
doors) provided in the hardware package securely to each hinge
position with the screws provided as shown below. Fasten each of
the four (4) doors to the appropriate pair of hinges.
LOCK
KNOB
NAMEPLATE
OPTIONAL
HASP
HOLES
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
SCREWS
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering
Copyright © 2012 Salsbury Industries. All rights reserved. 1/3/12 Page 2 of 3
@lockers.com
HINGE
DOOR