Metso ANSI CLASS 125, ANSI CLASS 150, ANSI CLASS 250, ANSI CLASS 300, ANSI CLASS 600 Maintance Manual

neles
1 1/2"–6" SERIES G110
ANSI CLASS 125, 150, 250, 300, 600
CAGE TRIM GLOBE AND
ANGLE VALVES
Installation, Maintenance,
and Operating Instructions
IMO - 806
2
READ THESE INSTRUCTIONS FIRST!
These instructions provide information about safe handling and operation of the valve. If you require additional assistance,please contact your authorized Metso Automation representative.
SAVE THESE INSTRUCTIONS!
Subject to change without notice.
Table of Contents
1 GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.1 Warning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3 Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.4 Unpackaging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 Final Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3 MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.1 Disassembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.2 Removal from Pipeline . . . . . . . . . . . . . . . . . . . . . 4
3.3 Actuator Removal . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.4 Valve Body Disassembly . . . . . . . . . . . . . . . . . . . 4
3.5 Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.6 Lapping of Seats . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.7 Replacement of Soft Seat . . . . . . . . . . . . . . . . . . 5
3.8 Plug/Stem Disassembly . . . . . . . . . . . . . . . . . . . . 5
3.9 Packing Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.10 Bellows Sealed Valves . . . . . . . . . . . . . . . . . . . . . 6
4 VALVE BODY ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . . 6
4.1 Plug/Stem Assembly . . . . . . . . . . . . . . . . . . . . . . 6
4.2 Body Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
5 ACTUATOR MOUNTING AND ADJUSTMENT. . . . . 7
5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5.2 Actuator Mounting . . . . . . . . . . . . . . . . . . . . . . . . 7
5.3 Establishing Seat Load . . . . . . . . . . . . . . . . . . . . . 7
5.4 Valve/Actuator/Travel . . . . . . . . . . . . . . . . . . . . . . 7
5.5 Actuator Bench Set and Span . . . . . . . . . . . . . . . 7
3
1 GENERAL
1. These installation and maintenance instructions apply to all sizes and ratings of the G110 Series control valves regardless of the type of trim used.
1.1 Warning
FOR YOUR SAFETY AND PROTECTION, IT IS IMPORTANT THAT THE FOLLOWING PRECAUTIONS BE TAKEN PRIOR TO REMOVING THE VALVE FROM SERVICE OR BEFORE ANY DIS­ASSEMBLY OF THE VALVE:
1. AT ALL TIMES DURING THIS ENTIRE PROCEDURE, KEEP HANDS OUT OF THE VALVE. A REMOTELY ACTUATED VALVE COULD CLOSE AT ANY TIME AND RESULT IN SERIOUS INJURY.
2. KNOW WHAT MEDIA IS IN THE LINE. IF THERE IS ANY DOUBT, CHECK WITH THE PROPER AUTHORITY.
3. WEAR ANY PROTECTIVE CLOTHING OR EQUIPMENT NORMALLY REQUIRED WHEN WORKING WITH THE MEDIA INVOLVED.
4. DEPRESSURIZE THE LINE AND VALVE AS FOLLOWS: A.) OPEN THE VALVE AND DRAIN THE LINE. B.) CLOSE AND OPEN THE VALVE TO RELIEVE ANY
RESIDUAL PRESSURE THAT MAY BE IN THE VALVE PRIOR TO REMOVING THE VALVE FROM SERVICE.
C.) AFTER REMOVAL AND PRIOR TO ANY DISASSEMBLY,
DRAIN ANY REMAINING MEDIA BY PLACING THE VALVE IN THE VERTICAL POSITION AND CAREFULLY OPENING AND CLOSING THE VALVE SEVERAL TIMES.
5. TRIM AND BODY RATINGS — THE PRACTICAL AND SAFE USE OF THIS PRODUCT IS DETERMINED BY BOTH THE TRIM AND BODY RATINGS. READ THE NAME TAG AND CHECK BOTH RATINGS. THIS PRODUCT IS AVAIL­ABLE WITH A VARIETY OF TRIM MATERIALS. SOME OF THE TRIM MATERIALS HAVE PRESSURE RATINGS THAT ARE LESS THAN THE BODY RATINGS. ALL OF THE BODY AND TRIM RATINGS ARE DEPENDENT ON VALVE TYPE AND SIZE, TRIM MATERIAL, BOLTING MATERIAL, AND TEMPERATURE. DO NOT EXCEED THESE RATINGS.
1.2 Introduction
THE FOLLOWING INSTRUCTIONS SHOULD BE THOROUGH­LY REVIEWED AND UNDERSTOOD PRIOR TO INSTALLING, OPERATING OR PERFORMING MAINTENANCE ON THIS EQUIPMENT. THROUGHOUT THE TEXT, SAFETY AND/OR CAUTION NOTES WILL APPEAR AND MUST BE STRICTLY ADHERED TO, OTHERWISE, SERIOUS INJURY OR EQUIP­MENT MALFUNCTION COULD RESULT.
1. A regularly scheduled training program is conducted to train customer service and instrumentation person­nel in the operation, maintenance and application of control valves and instruments. Arrangements for these services can be made through your local repre­sentative. When performing maintenance, use only Metso Automation replacement parts.Parts are obtain­able through your local representative.When ordering parts, always include model and serial number of the unit being repaired.The model number, serial number, size and rating of the valve are shown on the identifi­cation tag located on the actuator.
1.3 Storage
1. When a valve is to be stored for an extended period, remove the line connection covers and spray a light coating of machine oil on the internals. Replace the covers to prevent foreign matter from entering the valve body. Exposed parts should also be sprayed with a protective film of oil.
2. A packing list, containing a complete description of the valve and accessories (such as a valve positioner, etc.), accompanies each valve when shipped.This list should be checked soon after the shipment has been received.
3. When hoisting the valve, make sure that ropes or cables are of sufficient strength and are positioned so that any tubing or accessories will not be damaged.
1.4 Unpackaging
1. Care must be exercised when unpacking the valve to prevent damage to the accessories and component parts. Should any problems arise, contact your local representative.
2 INSTALLATION
1. The best performance will be obtained if the valve is installed in a straight run of pipe away from elbows, restrictors or other areas where abnormal velocities may occur.The valve may be installed in any position, however, the vertical upright position is strongly rec­ommended.
2. There should be at least one foot of clearance above the actuator in order to perform in-line maintenance operations.
3. A conventional three valve bypass should be installed for systems which must continue in service during periods of control valve maintenance.
4. Care should be taken in rigging the valve for installa­tion to assure that instruments or instrument lines are not damaged.
5. Before installing the valve in the line, clean the piping and the valve of all foreign material such as welding chips, scale, oil, grease or dirt. Gasket surfaces should be thoroughly cleaned to insure leak-proof joints.
6. Pipe threads should be clean and sharp. Apply pipe compound or joint sealer to the male threads only. Be sure that the compound or sealer is compatible with the process fluid.
7. The valve must be installed so that the controlled sub­stance will flow through the valve in the direction indi­cated by the flow arrow located on the body.
8. Where insulation of the valve body is required,DO NOT INSULATE THE VALVE BONNET.
9. An air supply pressure regulator with filter should be installed in the air line ahead of any valve-mounted instruments. Factory mounted positioners are piped and adjusted at the factory.
4
2.1 Final Check
1. Turn on the instrument air supply and set pressure 5 psig greater than required by the bench set listed on the label plate.
2. Check the air lines to the actuator for leaks.
3. Vary the air supply to the actuator to ascertain that the actual valve travel (stroke) corresponds with the data in Table 2.
4. Check to be sure that the combined actions (direct and reverse) of the controller, positioner, etc., and valve,pro­duce desired direction of movement, and will ensure the required valve position in the event of air supply failure.
NOTE: Under actual operating conditions the pressure drop across the valve may differ from the calculated fig­ures. Some actuators may require readjustment of the spring preload in order to provide adequate shutoff force. In this situation check to ensure that the actuator is still capable of full valve travel with the available supply air pressure.
5. Tighten the packing flange stud nuts evenly to assure optimum sealing pressure on the stem and packing box walls. Slightly more than finger tight should be adequate to eliminate packing box leakage. Over tight­ening will restrict stem movement and adversely affect the process control.
3 MAINTENANCE
3.1 Disassembly
READ THESE INSTRUCTIONS COMPLETELY, FOR YOUR SAFE­TY IT IS IMPORTANT THAT THE FOLLOWING PRECAUTIONS BE TAKEN PRIOR TO REMOVAL OF THE UNIT FROM THE LINE OR BEFORE ANY DISASSEMBLY.
1. Wear any protective equipment normally required when working with the fluid involved during removal and disassembly.
2. Depressurize and drain the pipeline with the valve open prior to disconnecting service lines.
3. Before removing the instrument connections from the actuator, shut off the air pressure and bleed the air lines.
4. Have adequate rigging transport means available at the valve before attempting to remove it from the pipeline or before breaking the body/bonnet joint for in-line service.
3.2 Removal From Pipeline
NNOOTTEE::
Maintenance such as diaphragm, packing or trim replacement can be done without removing the valve from the line.
1. Disconnect all instrument air and electrical lines from
the actuator.
2. Remove all inlet and outlet line flange studs and nuts,
and lift the valve out of the pipeline.
3. Secure the valve and actuator assembly firmly on a
work bench in an upright position in a manner to pre­vent tipping or falling over.
3.3 Actuator Removal
1. Connect instrument air to the actuator and apply signal pressure sufficient to move the plug to a position only slightly off the seat. This will remove the spring force from the coupling before disassembly.
2. Disconnect the actuator coupling from the valve stem by disengaging the coupling screws (Figure 1). Disconnect air supply.
3. Unscrew the clamp nut from the bonnet by placing a metal rod or blunt nosed chisel on the clamp nut lugs and striking with a mallet.
4. Unscrew the clamp nut from the threads and lift the nut over the plug stem.
5. Lift or hoist the actuator unit off the valve, taking care to avoid damaging the plug stem, instruments or tub­ing.
NOTE: The actuator is removed from the body as a unit, without disturbing the packing box bolt-bolting. Clamp nut and actuator yoke will pass over the packing flange.
6. If maintenance is required on the actuator consult the appropriate actuator IMO.
3.4 Valve Body Disassembly
1. Unscrew the packing flange nuts, and remove packing flange and packing follower.
2. Remove the bonnet/body stud nuts.
3. Lift the bonnet while holding the plug stem (to prevent the plug from dropping out), and carefully lift off the valve body.Remove the cage and the seat ring from the body.
4. Withdraw the plug and stem downward out of the bonnet through the guide.
CAUTION: CARE MUST BE TAKEN TO AVOID DAMAGE TO THE PLUG AND PLUG GUIDE.
5. Using a narrow hook or bent wire, pull the packing rings and lantern spring out of the packing box.
CAUTION: WHEN REMOVING PACKING RINGS FROM THE PACKING BOX, USE A HOOK, BENT WIRE, OR TOOL MADE FROM A MATERIAL THAT IS SOFTER THAN THE BONNET MATERIAL. THIS WILL PREVENT SCRATCHING OR MARRING OF THE PACKING BOX SURFACES.
Figure 1 Actuator Removal
6. Clean the packing box thoroughly before replacing packing.
7. Bonnet, plug, bushing, cage and seat ring may now be inspected for wear and service damage. After deter­mining the maintenance required, proceed to the appropriate section of this IMO.
3.5 Repair
1. The purpose of this section is to assist maintenance personnel by suggesting methods of component maintenance which may be largely dependent on the tools and machine shop equipment available.Each sec­tion should be read and understood before proceed­ing.
3.6 Lapping of Seats
NOTE: Lapping is the process of working the valve plug
against the seat ring with an abrasive to produce a close fit. When valve leakage becomes excessive, lapping becomes necessary. The plug and seat ring seating surfaces should be free of large scratches or dents,and the contact surfaces of the seats should be as narrow as possible. Lapping can correct shallow scratches or slight roughness only. Excessive lapping produces a groove in the plug, therefore plugs or seats having relatively deep scratches must be re­machined.
1. Lapping compound should be grade “A” or finer. The compound should be mixed with a small quantity of lubricant such as graphite. This will slow the cutting rate and prevent tearing of the seat surfaces.
2. Apply lapping compound to the seating surface of the seat ring only.Compound on the characterized portion of the plug could increase the clearance between plug and seat, thus changing the flow characteristic and rangeability of the valve.
3. A film of light machine oil on the valve plug stem will facilitate stem movement during the lapping proce­dure.
4. Carefully insert the valve plug and stem assembly into the bonnet from the bottom.Avoid damaging the stem threads or the walls of the guide bushing.
5. Position the bonnet and the plug assembly on the body and install and tighten two or three body stud nuts to secure the bonnet during lapping.
6. Install temporary packing so that the valve plug stem will be aligned during the lapping operation. Any rope packing may be used for this purpose.
7. Screw a lock nut onto the valve plug stem, then screw the lapping tool onto the stem and lock it in position.
NOTE: A “T”handle for the valve plug stem can be made by welding a nut (with threading to match the plug stem threads) to the center of a rod. (See Figure 2.)
8. Lap with short, oscillating strokes. The weight of the plug, stem, and lapping tool provides ample pressure for lapping - do not bear down.
9. Raise the plug occasionally, lower it to another position and resume the oscillating strokes. This ensures an even lap over the entire seating surfaces of plug and seat.
10. Approximately 5 to 10 minutes lapping time, with grade A compound, is usually required to obtain a sat­isfactory fit between a new plug and seat.
11. Clean the plug and seat, then, holding the plug on the seat by hand, apply compressed air to the inlet side of the valve to check the tightness of the lapped parts. Repeat the lapping procedure if necessary.
12. Disassemble the valve and clean all parts thoroughly. Remove all traces of lapping compound. Remove the temporary packing and clean the packing box.
3.7 Replacement of Soft Seat
1. The soft seat insert is captured between the upper sur­face of the seat ring and the lower surface of the cage. No special parts or tools are required.
3.8 Plug/Stem Disassembly
1. Using a drift punch, drive out the pin, a drill bit some­what smaller than the pin should be used to remove the remainder of the pin.
2. Unscrew the plug from the stem.
3.9 Packing Box
Packing box maintenance is one of the principle chores of routine servicing. Tightness of the packing is maintained by packing compression. Compression is achieved by evenly tightening the packing flange nuts against the packing flange. Care must be taken not to over tighten as this could prevent smooth operation of the valve. If all compression is used up and the valve leaks,new packing is required.
Packing box maintenance may be performed as a part of major disassembly and repair or as a separate routine with the valve installed in the process line.In either case the fol­lowing steps should be closely adhered to, otherwise seri­ous injury or equipment damage could result.
CAUTION: Valve must be isolated and the pressure vent­ed before performing packing box maintenance.
1. Loosen and remove packing flange nuts.
2. Raise packing flange and packing follower up the valve stem.
NO
TE: If the new packing rings are solid endless rings (i.e.:
PTFE V-ring, grafoil, etc.), the actuator stem coupling will have to be disconnected. Refer to the actuator removal section of these instructions for details of coupling
5
Figure 2 Lapping Process
removal. If the coupling is to be removed, the packing box flange and follower can be removed completely.
3. Using a narrow hook or bent wire, pull the old packing rings and lantern ring or spring out of the packing box.
CAUTION: WHEN REMOVING PACKING RINGS FROM THE PACKING BOX, USE A HOOK, BENT WIRE, OR TOOL MADE FROM A MATERIAL THAT IS SOFTER THAN THE BONNET MATERIAL. THIS WILL PREVENT SCRATCHING OR MAR­RING OF THE PACKING BOX SURFACES.
4. Replace packing referring to Figures 4–8 for correct amount of packing and the correct sequence of instal­lation.
NOTE: A thin film of silicone lubricant will ease assembly. CAUTION: AVOID DAMAGE TO PACKING RING WHEN
SLIPPING THEM OVER THE STEM THREADS.
5. Slide the packing follower over the stem.
6. Place the packing flange, flat side up,over the stem and flange studs to rest on the packing follower.
7. Screw the packing flange nuts onto the studs and tighten them evenly to avoid cocking the flange.
NO
TE: Finger tightening of the packing flange nuts should
provide ample sealing pressure to the packing rings.When the valve is placed in service this adjustment should be checked, and the nuts tightened just enough to prevent any leakage. Excessive tightening will bind the valve stem and prevent sensitive response.
NOTE: For PTFE V-rings spring loaded, tighten the packing flange nuts evenly until the packing follower shoulder con­tacts the top of the bonnet, Figure 4. No further packing adjustment is required because packing spring compression maintains the proper sealing pressure on the chevron rings.
8. In some applications, packing boxes are designed for use with a lubricator.The lubricator is provided with a ball check valve to prevent back flow of the process fluid. On some valves, an isolating valve is added for positive protection against back flow. The lubricator should be kept filled with the specified lubricant and turned in firmly but not tightly.One or two turns of the lubricator once every two weeks should suffice to pro­vide the desired seal.
3.10 Bellows Sealed Valves
CAUTION: THE TOP OF THE BELLOWS IS WELDED TO THE STEM AND THE BOT TOM OF THE BELLOWS IS WELDED TO THE BELLOWS FLANGE. ANY TWISTING OF THESE TWO PARTS WILL RESULT IN DAMAGE TO THE BELLOWS.
1. Disassembly of a bellows sealed valve follows the same procedure as Valve Body Disassembly on page 2.
2. Damaged bellows assemblies are replaced as a com­plete unit.
3. If plug removal becomes necessary,carefully inspect the portion of the plug shank that can be seen below the guide bushing. If the pin can not be seen, the bellows assembly must be held in a vice and the stem moved downward slightly until the pinned connection is visible.
CAUTION: IN THE RELAXED CONDITION THE BELLOWS WILL BE AT MID TRAVEL.THE STEM MAY ONLY BE MOVED DOWNWARD 1/2 OF THE VALVE TRAVEL LISTED IN TABLE 2.
4. If lapping of the plug and seat ring is required, the seat ring must be removed from the body and hand lapped to the plug/bellows assembly.
5. Reassembly of a bellows sealed valve follows the same procedure as Valve Body Assembly.
4 VALVE BODY ASSEMBLY
After completion of the required maintenance the valve should be reassembled using the following procedures:
4.1 Plug/Stem Assembly
1. Screw the stem solidly into the plug.
2. Place the plug shank on a V-block and using a suitable size drill-bit, drill the stem using the hole in the plug as a guide.
3. Remove any burrs from the plug guide by making a slight counterbore.
4. Select the correct size pin, apply a small amount of grease on it and press into the hole.
NOTE: The pin must be recessed approximately 1/16" below the plug guide surface.
5. After the plug has been pinned, it should be placed in a lathe to insure it is running "true." If it is not, strike the plug with a soft-faced mallet to straighten.
4.2 Body Assembly
1. Clean gasket surfaces. Place gasket on gasket surface on body bridge. Insert seat ring and cage into body.
2. Lower the plug and stem assembly into the body.
3. Place new bonnet gaskets on the body, and lower the bonnet carefully over the plug stem and body studs to its place on the body.
NO
TE: The bonnet must be positioned so the packing
flange studs are at a right angle to the flow center line.
4. Install the stud nuts and tighten them evenly to finger tight only.
5. Insert packing.
NO
TE: Refer to Figures 4–8 to determine correct amount of
packing to install.
6. Slip the packing follower over the stem to rest on the packing and check to see that it enters the packing box at least 1/8".
7. Place the packing flange flat up over the stem and flange studs to rest on the packing follower.
8. Screw the packing flange nuts onto the studs and tighten them evenly to avoid cocking the flange.Finger tightening is sufficient.
9. Using the stem, move the valve plug up and down through the rated travel.
NOTE: If there is any evidence of binding, loosen the body stud nuts and reposition the bonnet until the binding dis­appears.
10. Tighten the body stud nuts to the proper torque listed in Table 2 using the tightening sequence in Figure 9.
NOTE: Tighten in 1/3 increments stopping after each
6
sequence to check for binding as described in step 9 above.
5 ACTUATOR MOUNTING AND
ADJUSTMENT
5.1 General
The following instructions are for the traditional D/R series spring /diaphragm actuator. Instructions for other actua­tors can be obtained from your local representative.
5.2 Actuator Mounting
1. Lower the actuator over the plug stem and packing flange to seat squarely on the bonnet shoulder.
2. Rotate the actuator to a convenient position, then screw the clamp nut onto the valve bonnet threads and tighten it securely.
3. Connect a regulated air supply to the actuator diaphragm connection. The supply should be at least 5 psig greater than the pressure needed to stroke the actuator.
4. The actuator must be in the down position on the down travel stop.
NO
TE: For "R" series actuators,the spring will maintain the
actuator on the down travel stop and no air pressure is required.For "D" series actuators,regulate the supply pres­sure to the actuator to move the actuator stem downward until the downward motion is the same as the travel listed in Table 2.
5. The valve plug must be on its seat while the actuator stem is being connected.
6. Press half of the actuator coupling against the actuator stem and valve plug stem so that each stem is engaged in the coupling half at least one stem diameter.
NO
TE: It may be necessary to move the valve plug off its
seat a slight distance in order to mesh the valve plug stem threads with the coupling threads.
7. Apply the other half of the coupling, carefully engaging threads,then insert the coupling cap screw and tighten it by hand (Refer to Figure 1).
5.3 Establishing Seat Load
1. Maintain the actuator stem at its lowest position of travel.
2. If the plug moved off the seat during the stem connec­tion procedure, prevent the stem coupling from rotat­ing, and unscrew the valve plug stem out of the cou­pling until the plug is seated.
CAUTION: UNSCREW THE PLUG STEM UNTIL THE SEAT IS CONTACTED. DO NOT CONTINUE TO UNSCREW. ROTAT­ING THE VALVE PLUG WHILE IN CONTACT WITH THE SEAT RING CAN CAUSE DISTRUCTION OF THE SEAT AND GALLING.
3. Move the plug off the seat by adding air supply to the "R" series actuator or decreasing air supply to the "D" series actuator. Unscrew the valve plug stem an addi­tional one-half turn out of the actuator coupling to ensure positive seating.
4. Tighten the connector cap screws securely.
5. Seat the valve plug firmly by means of the actuator.
IMPORTANT NOTICE
If these steps have been performed correctly the valve plug is on the seat ring, the actuator has been raised upward off its down travel stop, the actuator thrust is applied to the valve trim, and valve leakage will be within acceptable limits. If maintenance work has been per­formed and seat leakage is exceptionally high, these steps should be repeated in order to ensure that adequate seat load has been established.
5.4 Valve/Actuator/Travel
1. Adjust the travel indicator scale on the actuator yoke leg so that the "Shut" mark is opposite the travel indi­cator on the actuator stem coupling.
2. Stroke the valve/actuator combination by regulating the air supply to the diaphragm case.Note the travel on the indicator scale.
3. The actual travel should agree with the travels listed in Table 2.
NOTE: If the actual travel is less than the travel listed in Table 2,the actuator coupling should be removed and the steps in the previous sections repeated.
5.5 Actuator Bench Set and Span
1. The actuator bench set (spring preload) is stamped on the actuator identification tag located on the actuator leg.
2. Using a regulated air supply with a gage connected between the regulator and the diaphragm case, stroke the valve actuator combination.
3. Record the actuator air pressure at the actuator full up and full down position.This is the bench set and should agree with the bench set stamped on the identification tag.
4. If the actual bench set does not agree with the identifi­cation tag, the bench set can be adjusted by rotating the actuator spring adjuster.
5. The actuator spring span is the arithmetic difference between the bench set upper limit and lower limit.
7
8
Figure 3 Parts Identification
Soft Seat Construction
ITEM DESCRIPTION ITEM DESCRIPTION
Body
1
Bonnet
2
Gasket, Bonnet
4
Gasket, Lower Cage
4B*
Gasket, BNT, Backup
4G*
Gasket, Lower Cage
4J*
Ring, Seat
5*
Plug
6*
Stem
8*
Stud
9
Nut
10
Packing
12*
1-1/2”–6” Series G110
ANSI Class 125, 150, 250, 300, 600
Cage Trim Globe and Angle Valves
PA RT S L IS T
12D
Washer Ring, Lantern
13
Follower, Packing
14
Flange, Packing
15*
Pin
19
Felt Wiper
22
Stud
23
Nut
24
Nut, Clamp
25
Cage
32
Backup Ring
33
Omniseal
34
* Recommended Spare Parts
9
10
Figure 9 Bolt Tightening Sequence
11
Notes
12
Metso Automation, Field Systems Division
Europe, Levytie 6, P.O.Box 310, 00811 Helsinki,Finland. Tel. int +358 20 483 150. Fax int.+358 20 483 151
Europe (UK), 2 Lindenwood, Crockford Lane; Chineham Business Park, Chineham, Basingstoke,Hampshire RG24 8QY UK.
Tel.int +44 870 6061478. Fax int. +44 1256 707661
North America, Corporate Offices: 44 Bearfoot Road, Northborough,Massachusetts 01545-8044, USA. Operational Facilities: 44 Bowditch Drive,P.O.
Box 8044, Shrewsbury, Massachusetts, 01545-8044 USA. Tel. int. +1 508 852 0200. Fax int. +1 508 852 8172
North America, 3100 Medlock Bridge Road,Suite 250, Norcross, GA 30071, USA. Tel. int. +1 770 446 7818. Fax int. +1 770 242 8386
Latin America, Av. Central, 181- Cháracas Reunidas, 12238-430, São Jose dos Campos. Tel. int. +55 12 335 3500. Fax int. +55 12 335 3535
Asia Pacific, 501 Orchard Road, #05-09 Wheelock Place,238880 Singapore. Tel int. +65 735 5200. Fax int. +65 735 2955
www.jamesbury.com • www.metsoautomation.com