C H I M N E Y C O V E R E X T E N S I O N S
Model Number: |
CHMEX8836 |
CHMEX8036 |
CHMEX8136 |
INSTALLATION
G U I D E
TABLE OF CONTENTS
Installation............................................................... |
1-2 |
Part No. 8110P265-60 ©2006 Maytag Appliances Sales Co. Litho U.S.A. Rev. 09/06
INSTALLATION |
1 |
INSTALLATION
CHMEX8836 Chimney Cover Extension for JXT8836 Hood
1.Mount wall bracket (supplied with rangehood).
2.Screw lower portion of extension onto rangehood and screw upper portion onto wall bracket.
108” min - 148” max
35 7/8"–70 1/4"
35 3/8"
Package contains:
2 - Duct covers
1 - Bag of mounting screws
CHMEX8036 Chimney Cover Extension for JXT8030, JXT8036, JXT8042 Hoods
1.Mount wall bracket (supplied with rangehood).
2.Screw lower portion of extension onto rangehood and screw upper portion onto wall bracket.
108” min - 147” max, 9’ - 12’
37 7/8"–74 1/4"
37 3/8"
Package contains:
2 - Duct covers
1 - Bag of mounting screws
CHMEX8136 Chimney Cover Extension for JXT8136, JXT8142 Hood
1.Mount ceiling plate (supplied with rangehood).
2.Replace support arms (supplied with rangehood) with new extension support arms and install as shown in hood installation instructions.
116” min - 132” max, 9.5’ - 11’
47" – 59”
46"
Package contains:
2 - Duct covers
4 - Support arms
2 - “U” brackets
1 - Bag of mounting screws
INSTALLATION |
2 |
EXTENSION KIT INSTALLATION FOR CHMEX8136
Add Blockings
Front
Support U Bracket
Rear
Front
Dimensions of
Extension Arms 46”
rear
front
Extension Arms with
Tabs position
Fasten Ceiling Plate
Fasten Support Fram
Mounting the Range Hood
1.Add and secure blockings (minimum 2x4 studs) onto ceiling joist.
2.Center, mark and fasten Ceiling Plate onto ceiling where hood is to be hung. Make sure front of bracket is facing as shown on diagram.
3.Determine height of hood, measure and attach four extension arms onto blower unit with screws provided; use predrilled holes on blower unit and support arms. Make sure tabs on top of the arms are facing out for the front, and sideways for the rear, as shown on diagram. Attach support “U” bracket.
4.Slide telescopic duct covers onto the top of the blower unit.
5.Attach duct work to the ceiling and position the electrical.
6.Lift blower unit and fasten to Ceiling Plate (lock tabs on support frame into slots on CeilingPlate); secure support frame to Ceiling Plate with screws provided.
7.Connect duct work and electrical to the blower unit. (slide duct covers up to gain access to the top of the blower unit).