ESAB Balanced Boom Installation Installation manual

Page 1
INSTRUCTIONS for
BALANCED BOOM INSTALLATION
F-15-639
September, 2000
Do not remove the spring rod shipping support until full assembly is completed and all components are installed on the boom. This support is p ainted “RED” and must stay in place to prevent the Boom Arm from flying upward and possibly causing personal injury .
5. Attach the spring rod clevis to the clevis plate on the bottom of the boom arm assembly. In­stall the clevis swivel pin. This consists of (1) 5/ 8-11 X 3.50 grade 8 bolt, (4) flat washers and (1) lock nut. Place (2) of the flat washers under the head of the bolt and (2) under the lock nut. Tighten the lock nut completely and then back the lock nut off 2 full turns.
1. Mount the pedestal assembly on a pallet base (optional) using the (4) ¾-10 X 1.50 grade 5 bolts, nuts and washers provided.
2. Install the boom mast & spring retainer housing assembly into the pedestal assembly. Coat the bottom pipe on the boom mast & spring retainer housing assembly with grease before placing into the pedestal assembly.
3. Remove the friction control knob.
4. Install the boom arm assembly . Place the swivel plate on the back of the boom arm assembly between the two mounting plates on the boom mast & spring retainer housing assembly. In­stall the main swivel pin. This consists of (1) ¾­10 X 3.50 grade 8 bolt, (3) flat washers and (1) lock nut. Place (2) of the flat washers under the head of the bolt and (1) under the lock nut. Tighten the lock nut completely and back the lock nut off 1 full turn.
6. Re-install the friction control knob. T ighten com­pletely.
7. Leave Spring Rod Shipping Support in place & refer to Instruction Literature with Wire Feeder, for feeder installation.
Spring Rod Shipping Support
Loading...