Empire Industries FRSQ1015 Installation & Assembly

Page 1
EMPIRE INDUSTRIES
BEFORE
Read all
local
the
plumbing
INSTALLING
installation
and
building
INSTRUCTIONS
Due
to
the
will
vary
slightly
may
require consulting assistance. the
actual
custom
fit.
Please
use
order
to
avoid
We
recommend
you
are
unfamiliar
fixtures
and
accepts
no
floor,
walls,
during
installation
manufacturing
custom
an
Providing
sink
assistance
plumbing. liability plumbing
process,
dimensionally. Farmhouse
cabinetry. We
experienced
cabinet
the
cabinet
to
be
installed
when
personal
injury
consulting a professional
with
installing Signature
for
any
damages
or
personal
.
COPPER
below.
Observe
codes.
each
sink
sinks recommend maker
for
maker
with
will
ensure
a
lifting
the
sink
kijchen
Hardware
to
the
injury
in
n
.
KITCHEN
TOOLS
SINK
AND
Gu
Safety
Glasses
(QL
Tape
Measure
~
Thread
Sealant
~
Drill
MATERIAL
Copper
sinks Created
copper
apron
both
sinks
sought-after
the
surface
as
Table
your
aging
not
use
pans,
as
temperature
are
farmhouse
the
front
aesthetic
will
cleaning
of
Top
copper
process.
with
copper
on
your
this
beauty. our strengthening The ensuring
Copper much composition, rid such keep natural occasionally
Do chemicals or melting
MATERIALS:
r
Framing
Square
l•m • m•I
Level
~
Wood
Shims
••sealant.
Because
to
some
we
recommend
cure
silicone
designed
sheet
have
with
solid
appeal
and
with
time
finish.
Because
easy.
Simply
or
dirt
at
least
once
its
original and a sponge. cleaners,
sink.
Avoid
distortion
normal
metals,
caulk.
for
of
no
internal
and
copper quality.
and
rinse
and
wipe every
condition
thorough
or
contact
due
corrosive
copper,
neutral
DESCRIPTION
specially
with a single
sinks
sink's
is
welded
patina
living
is
any
soap
Wax,
sink
in For a more
dish
soap
or
silver
copper
may
cause
.
I
Pencil
Cll
Hacksaw
L=,
Basin
Wrench
silioone
particularly
the
use
of
a
AND
both
durability
heavy
gauge welds,
preventing
by
skilled
normal
use
of
copper's
after
dry.
Apply
15-20
and
cleaning,
any
abrasive
with
to
coppers
is
CARE
and
copper,
leakage.
artisans
creating
natural
each
use wax,
days
to
prevent
wash
or
hot
pots
low
,
a
to
the
harsh
Page 2
EMPIRE INDUSTRIES
INSTALLATION
We
reoommend
and
built-up
Ensure
there
installations
.
DRAIN
INSTALLATION
Apply a bead
strainer
flange
opening
in
the sink.
If
your
drain
supplied
with
disposer
and
with
strainer
friction
washer
of
the
sink.
Thread
the
lock Hand-tighten properly
aligned.
basin
wrench
to
the
strainer
nut
and
fenrule
under-mount
installation
are
is
adequate
of
silioone
sealant
and
place
has a disposer
the
garbage
oomplete
your
baskets, slide
up
the
strainer
nut
onto the
and
make
sure
When
ready, finish
to
secure
the
flange
with
.
OPTIONS
the
sink
installation.
not
reoommended
room
for
the
to
the
flange
in
flange, use
disposer
to
installation. For
the
rubber
flange
drain
assembly.
that
the
tightening
drain.
Secure
the
provided
Flush-mount
.
faucet
and
base
of
the
the
drain
the
directions
attach
the
drains
gasket
and
to
the
bottom
drain
is
with
the
P-trap
oompression
backsplash
a
Page 3
EMPIRE INDUSTRIES
PREPARE
Fannhouse We cabinet maker ensure a custom
Allow and a garbage support to
back frame all
attachments.
The when top
TEMPLATE
No
template dimensionally. After outline use clearance the
FINAL
Test previous be
supported sink shims, ~ needed,
Set below counter-top. Hold the sealant
THE
sinks
maker
with
clearance
frame
along
must
support
installed,
the
cabinet.
the
the
support
frame
may
consulting
for
assistance.
actual
fit.
for
disposal, ~ applicable.
or
install
inner
the
recommend
of
AND
is
provided
of
the
sink
for
any
on
for
the
faucets
accordingly
as a guide
counter-top
PLACEMENT
fit
the
sink
in
the
steps.
The
by
the
is
in
line
and
level
to
the
sink
and
apply
the
sink
front,
from
onto
all
surfaces
the
counter-top
CABINET
require
an
sink
that
the
water support
sides
the
weight
should
be
sink
is
in
line
CUTOUT
since
centering
the
counter-top
cutout.
and,br
.
opening
entire
weight
support
frame. Verify
with
the
level
the
your
sealant
and
between
sink
in
place
the
sink
and
.
custom
cabinetry.
experienced
Providing
the
is
to
be
installed
supply
lines,
Build
bars
from
of
the
cabinet.
of
the
sink
positioned
and
level
each
sink
the
sink,
trace
with a pencil
Remember
backsplashes.
that
was
created
of
the
top
of
the
sink
.
to
fill
the
sink
to
secure. Place
remove
cabinet
drains
a
front
The
and
so
that
with
will
vary
the
to
allow
sink
should
that
cabinet.
in
any
and
any
will
the
to
Cut
in
the
the
Use
gaps
excess
; '
' '
·~ ·
'
'
'
;
'
'
Loading...