Elkay 4400, 4410, 4420, 4430 User Manual

0 (0)
4"
5 1/4"
10" O
10 1/4"
7 1/2"
6 1/4"
FOUNTAIN BODY
FINISHED GRADE
1
4, 5, 6
CONCRETE
2222 Camden Court, Oak Brook, IL 60523
SPEC00447 06/2016
Direct Bury Fountain Adaptor
for 4400 Series Tubular Fountains
GENERAL
Makes rough-in and installation easier for all models of non-freeze
resistant Endura II™ tubular fountains. Opening in adaptor allows for
simplified routing of water supply and drain into the fountain body. 3/4”
rods provide added stability. Steel adaptor features textured powder-
coat finish, and E-coat immersion which coats the outside and inside of
the adaptor for the ultimate in corrosion protection.
KIT CONSISTS OF:
Adapter Panel
(3) 3/4” Rods
Assorted hardware (nuts, bolts and washers) needed for installation
Installation instructions
Shipping Weight: 36 lbs.
Use part #97890C when ordering
PARTS LIST
ITEM NO. PART NO. DESCRIPTION
1 45835C Adapter - Direct Bury Fountain
2 75617C Rod - 3/4” Dia.
3 75616C Nut - 3/4” 10UNC - 2B Hex.
4 70204C Bolt - 3/8” 16UNC-2A Hex. Hd.
5 75611C Washer - 3/8” Lock
6 70421C Washer - 3/8” Plain
Fountain Adaptor Kit
SPECIFICATIONS
Note: Continued product improvement makes
specification subject to change without notice.
Elkay - www.elkay.com
Halsey Taylor - www. halseytaylor.com
Direct Bury
INSTALLATION INSTRUCTIONS
1. Thread nuts (Item 3) onto rods (Item 2) (one nut per rod).
2. Thread rods into adapter cylinder (Item 1) and tighten nuts
against cylinder securely.
3. Place washers (Item 6) on bolts (Item 4) (one washer per
bolt.) Assemble bolts into adapter ange.
NOTE: Thread bolts all the way in.
4. Secure adapter into concrete forms as per Standard Practice
and as shown below. Be sure to align adapter for proper
location of water inlet line, drain line, and required
fountain alignment.
5. After sufficient cure of concrete, remove ange bolts and
washers.
6. Mount fountain assembly per instructions supplied with
fountain and items 4,5 & 6.
Job Name: ________________________________
_______________________________ Qty. ______
Engineer/Contractor Name:
_________________________________________
Approval: _________________________________
Date: ____________________________________
Loading...