Bunn Smart Wave Silver Series, Smart Wave Series User Manual

5.39 Mb

®

Series

Smart Wave Series

Smart Wave Silver Series

INSTALLATION & OPERATING GUIDE

BUNN-O-MATIC CORPORATION

POST OFFICE BOX 3227

SPRINGFIELD, ILLINOIS 62708-3227

PHONE: (217) 529-6601 FAX: (217) 529-6644

To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and

manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.

40410.0000C 04/08 ©2007 Bunn-O-Matic Corporation

BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY

Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:

1)All equipment other than as specified below: 2 years parts and 1 year labor.

2)Electronic circuit and/or control boards: parts and labor for 3 years.

3)Compressors on refrigeration equipment: 5 years parts and 1 year labor.

4)Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis: parts and labor for 3 years or 30,000 pounds of coffee, whichever comes first.

These warranty periods run from the date of installation BUNN warrants that the equipment manufactured by it will be commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the applicable warranty period. This warranty does not apply to any equipment, component or part that was not manufactured by BUNN or that, in BUNN’s judgment, has been affected by misuse, neglect, alteration, improper installation or operation, improper maintenance or repair, damage or casualty. This warranty is conditioned on the Buyer 1) giving BUNN prompt notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Office Box 3227, Springfield, Illinois 62708-3227; 2) if requested by BUNN, shipping the defective equipment prepaid to an authorized BUNN service location; and 3) receiving prior authorization from BUNN that the defective equipment is under warranty.

THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of BUNN are not authorized to make modifications to this warranty or to make additional warranties that are binding on BUNN. Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not be relied upon.

If BUNN determines in its sole discretion that the equipment does not conform to the warranty, BUNN, at its exclusive option while the equipment is under warranty, shall either 1) provide at no charge replacement parts and/or labor (during the applicable parts and labor warranty periods specified above) to repair the defective components, provided that this repair is done by a BUNN Authorized Service Representative; or 2) shall replace the equipment or refund the purchase price for the equipment.

THE BUYER’S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AT BUNN’S SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND.

In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.

BrewWISE, BUNN Gourmet Ice, BUNN Pour-O-Matic, BUNN, Bunn-OMatic, Bunn-O-Matic, BUNNlink, BUNNserve, BUNN Espress, DBC, Dr. Brew, Dual, EasyClear, EasyGard, Easy Pour, FlavorGard, Gourmet Ice, Gourmet Juice, High Intensity, IMIX, Infusion Series, Legendary for Quality, The Mark of Quality in Beverage Equipment Worldwide, My Café, PowerLogic, Safety-Fresh, Scale-Pro, Single, Smart Funnel, Smart Hopper, SmartWAVE, Soft Heat, SplashGard, System III, ThermoFresh, 392, AXIOM, Beverage Profit Calculator, Beverage Bar Creator, BrewLOGIC, BrewMETER, BrewWIZARD, BUNNSERVE, BUNNsource, Coffee At Its Best, Cool Froth, Digital Brewer Control, Intellisteam, Nothing Brews Like a BUNN, Pouring Profits, Pulse Wave, Quality Beverage Equipment Worldwide, , Signature Series, Silver Series, Smart Heat, Tea At Its Best, The Horizontal Red Line, Titan, Ultra, are either trademarks or registered trademarks of Bunn-O-Matic Corporation.

Page 2

40410

041108

 

CONTENTS

 

Warranty..............................................................................................................

2

Introduction.........................................................................................................

3

User Notices........................................................................................................

3

Electrical Requirements.......................................................................................

4

Plumbing Requirements......................................................................................

5

Initial Setup.........................................................................................................

6

Brewing...............................................................................................................

7

Operating Controls/ Programming.......................................................................

8

Deliming............................................................................................................

12

Cleaning.............................................................................................................

13

Cover Removal..................................................................................................

14

Draining Tank.....................................................................................................

15

Switch Settings..................................................................................................

16

Troubleshooting.................................................................................................

17

Schematic Wiring Diagrams..............................................................................

18

INTRODUCTION

This equipment is factory set to brew approximately 64 ounces of coffee into an awaiting dispenser. It is only for indoor use on a sturdy counter or shelf.

WARNING

DO NOT OVERLOAD CIRCUIT.

ALWAYS ELECTRICALLY GROUND

THE CHASSIS.

DO NOT DEFORM PLUG OR CORD.

FOLLOW NATIONAL AND LOCAL

ELECTRICAL CODES.

KEEP COMBUSTIBLES AWAY.

FAILURE TO COMPLY RISKS EQUIPMENT

DAMAGE, FIRE OR SHOCK HAZARD.

READ THE ENTIRE

OPERATING MANUAL BEFORE

USING THIS PRODUCT

00986 0000F 10/07 ©1994 Bunn O Matic Corporation

#00986.0000

This equipment must be installed to comply with the International Plumbing Code o the International Code Council and the Food Code Manual o the Food and Drug Administration (FDA). For models installed outside the U.S.A., comply with the applicable Plumbing /SanitationCode.

#00656.0000

 

 

 

To reduce the risk of electric shock,

Authorized service personnel only.

do not remove or open cover.

Disconnect power before servicing.

No user-serviceable parts inside.

 

 

#37881.0002

USER NOTICES

#00824.0000

#00882.0000

To reduce the risk o electric shock, do not remove or open cover.

No user-serviceable parts inside. Authorized service personnel only. Disconnect power be ore servicing.

#37881.0000

PN: 00658 0000G 02/08 © 1985 BUNN O MATIC CORPORATION

#00658.0000

#03409.0002

#03408.0002

Page 3

40410

092407

 

ELECTRICAL REQUIREMENTS

CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.

Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.

WHITE

NEUTRAL GREEN

RED

 

 

 

BLACK

 

 

L2

 

 

 

L1

120 120 VAC VAC

208 or 240 VAC

CHASSIS GROUND

120 VOLT Model

230 VOLT CE Model

120/240 VOLT Model

120 & 230 volt ac models

120/208 & 120/240 volt ac models

Note: This electrical service consists of 2 current carrying conductors (L1 and Neutral) and a separate conductor for chassis ground.

Note: This electrical service consists of 3 current carrying conductors (Neutral, L1 and L2) and a separate conductor for chassis ground.

Electrical Hook-Up

CAUTION – Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial Set-Up.

CE REQUIREMENTS

This appliance must be installed in locations where it can be overseen by trained personnel.

For proper operation, this appliance must be installed where the temperature is between 0°C to 35°C.

Appliance shall not be tilted more than 10° for safe operation.

An electrician must provide electrical service as specified in conformance with all local and national codes

This appliance must not be cleaned by water jet.

This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given instructions concern-

ing use of this appliance by a person responsible for its safety.

If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personel with a special cord available from the manufacturer or its authorized service personel in order to avoid a hazard.

Page 4

40410

022908

 

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a 12" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 14" flare. Bunn-O-Matic does not recommend the use of a reverse-osmosis or deionized water supply to this equipment.

NOTE - Bunn-O-Matic recommends 14" copper tubing for installations of less than 25 feet and 38" for more than 25 feet from the 12" water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Adminis-tration (FDA). For models installed outside the U.S.A., comply with the applicable Plumbing /SanitationCode.

Plumbing Hook-Up

1.Flush the water line.

2.Securely attach the Strainer/Flow Control and tube assembly to the water supply line.

3.Securely attach tube assembly to the flare fitting at the rear of the brewer.

4.Turn on the water supply.

FIG 3

Page 5

40410

022908

 

INITIAL SET UP

CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions.

1.Insert an empty funnel into the funnel rails. (FIG 4)

2.Place an empty server under the funnel. For taller servers, lift up on the front of the booster plate, and slide it back into the trunk housing.

NOTE: If more height is need, the legs may be extended to a maximum of 1¾˝. (FIG 5)

3.Connect the brewer to the power source.

4.Press and release the "ENABLE BREW ON/OFF" switch. (Indicator/Display must be lit!). Water will flow into the tank and stop when the tank is filled to its capacity.

5.Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will show "READY" (green light on Silver Series) when tank is at operating temperature. Some water will drip from the funnel during this time; this is due to expansion and is normal part of setup.

6.Water volumes and flow settings have been preset at the factory. Refer to Adjustments Section of this manual to set brew volumes should the volume need to be increased or decreased.

7.The brewer is now ready for use in accordance with the instructions for Coffee Brewing.

FIG 4

1¾˝ Max.

FIG 5

Page 6

40410

092407

 

COFFEE BREWING

1.Begin each brew cycle with a clean empty brew funnel.

2.Insert a BUNN filter into the funnel. (FIG 6)

3.Pour (or grind) fresh coffee into the filter and level the bed of grounds by gently shaking.

4.Slide the funnel into the funnel rails until it stops.

5.Place an empty server under the funnel.

6.Verify that the "ENABLE BREW ON/OFF" switch is on.

7.Momentarily press and release the desired "BREW" switch. The display will read "BREWING" (flashing red light on Silver Series).

8.After the coffee finishes dripping from the funnel tip, carefully remove the brew funnel and discard the grounds and filter. Rinse funnel.

DO NOT USE FAUCET DURING BREW CYCLE!

FIG 6

FIG 6A

Page 7

40410

092407

 

OPERATING CONTROLS - SILVER SERIES

A D B C

TM

FIG 7

Smart Wave Silver Series

(A) ENABLE BREW ON/OFF SWITCH

Pressing the "ENABLE BREW ON/OFF" switch (indicator on) enables the brew circuit, and energizes the tank refill circuit. Pressing the switch again (indicator off) stops tank refilling and brewing. Stopping a brew cycle after it has been started will not stop the flow of water into the server until the funnel is empty.

NOTE 1: – Stopping a brew cycle by pressing the "ENABLE BREW ON/OFF" switch to the "OFF" position, will disable the tank refill circuit. If the level is low enough, tank heating may be disabled as well. Simply pressing the "ENABLE BREW ON/OFF" switch to the "ON" position will allow the tank to replenish. Allow a few minutes for the tank to heat back up to it's ready temperature.

NOTE 2: – Hot water will be available at the faucet in a limited amount when the "ENABLE BREW ON/OFF" switch is in the "OFF" position because the tank will not refill. Refer to NOTE 1 regarding low level.

(B) SMALL BREW SWITCH

Momentarily pressing and releasing the switch starts the selected "SMALL" brew cycle when the "ENABLE BREW ON/OFF" indicator is on. (Factory set for approx. 64 ounces)

(C) LARGE BREW SWITCH

Momentarily pressing and releasing the switch starts the selected "LARGE" brew cycle when the "ENABLE BREW ON/OFF" indicator is on. (Factory set for approx. 64 ounces)

(D) STATUS INDICATOR

Steady green - ready to brew. Steady red - tank is heating up. Flashing red - brew cycle in process.

Page 8

40410

092407

 

PROGRAMMING - SILVER SERIES

BREW VOLUME SET-UP:

NOTE: Set small and large batches separately. Maximum water on time is 5 minutes. Use the following steps when the setting is unknown.

1.Place an empty funnel in the funnel rails and an empty server beneath the funnel.

2.Press the "ENABLE BREW ON/OFF" switch ("ON").

3.Press and hold the small brew start switch until the LED indicator alternately flashes red/green (approximately 15 seconds). Release the switch.

4.Allow the cycle to continue until the desired amount of water is dispensed and then press the "ENABLE BREW ON/OFF" to turn "OFF" the brewer.

The brewer is now set to dispense this amount of water for each subsequent small brew cycle.

To increase the amount of water for each brew cycle place an empty funnel in the funnel rails and an empty server beneath the funnel. Press the "ENABLE BREW ON/OFF" switch (ON). Press and hold the small "BREW" switch until you hear the solenoid click on-and-off three times (approximately 10 seconds), then release the small "BREW" switch. Momentarily press and release the small "BREW" switch once for each ounce (approximate) of water to be added to the prior setting and allow the brew cycle to finish.

To decrease the amount of water for each brew cycle place an empty funnel in the funnel rails and an empty server beneath the funnel. Press the "ON/OFF" switch (ON). Momentarily press and release the small "BREW" switch once for each ounce (approximate) of water to be removed from the existing setting. Press and hold the small "BREW" switch until you hear the solenoid click on-and-off three times (approximately 10 seconds), then release the small "BREW" switch and allow the cycle to finish.

NOTE: Repeat the steps above to set the large batch by using the large brew switch as desired.

OPTIONAL PULSE BREW SET-UP:

NOTE: Set small and large batches separately. Brewer has 4 preset pulse brew routines to choose from. Factory default is 1. With 4 being the maximum time.

With the machine off, press the small or large switch for 10 seconds. Red LED will flash to indicate current setting ( 1 – 4 ). Press same switch the number of times ( 1 – 4 ) for the desired setting. If the switch is pressed more than 4 times, the setting will remain at 4. After 5 seconds the red Led will resume flashing the selected number. When no switches are pressed for 30 seconds, the mode will exit. Or the mode may be exited by pressing the "ENABLE BREW ON/OFF" switch. Repeat above procedure with the other brew switch.

Restore Factory Defaults:

Press the "ENABLE BREW ON/OFF" switch while applying AC power. Continue pressing the "ENABLE BREW ON/ OFF" switch for 10 seconds. During that 10 seconds, the red LED will be on steady. After 10 seconds the green LED will begin flashing rapidly for 5 seconds. During that 5 seconds, release and again momentarily press the "ENABLE BREW ON/OFF" switch again to restore default settings. The Led will alternate rapidly Red and Green for a few seconds indicating the restore has been accomplished.

Note: The Restore process cannot be done when Dip Switch # 1 is On (Program Lockout)

Page 9

40410

092407

 

OPERATING CONTROLS - SMART WAVE WITH DISPLAY

D E A B C

TM

Smart Wave Series

FIG 8

F

(A) ENABLE BREW ON/OFF SWITCH

Pressing the "ENABLE BREW ON/OFF" switch (indicator/display on) enables the brew circuit, and the tank refill circuit. Pressing the switch again (indicator/display off) stops tank refilling and brewing. Stopping a brew cycle after it has been started will not stop the flow of water into the server until the funnel is empty.

NOTE 1: – Stopping a brew cycle by pressing the "ENABLE BREW ON/OFF" switch to the "OFF" position, will disable the tank refill circuit. If the level is low enough, tank heating may be disabled as well. Simply pressing the "ENABLE BREW ON/OFF" switch to the "ON" position will allow the tank to replenish. Allow a few minutes for the tank to heat back up to it's ready temperature.

NOTE 2: – Hot water will be available at the faucet in a limited amount when the "ENABLE BREW ON/OFF" switch is in the "OFF" position because the tank will not refill. Refer to NOTE 1 regarding low level.

(B) BREW A SWITCH (-)

Momentarily pressing and releasing the switch starts the selected "A" brew cycle when the "ENABLE BREW ON/ OFF" indicator is on. (Factory set for approx. 64 ounces)

(C) BREW B SWITCH (+)

Momentarily pressing and releasing the switch starts the selected "B" brew cycle when the "ENABLE BREW ON/ OFF" indicator is on. (Factory set for approx. 64 ounces)

(D)HIDDEN PROGRAM SWITCH (Enter)

(E)STATUS DISPLAY

Indicates tank ready, brew cycle, and drip out cycle.

(F) BATCH SIZE/FLAVOR LABELS

Included

Page 10

40410

092407

 

PROGRAMMING - SMART WAVE WITH DISPLAY

BREW VOLUME SET-UP:

NOTE: Maximum water on time is 5 minutes.

1.Press the "HIDDEN" switch until display reads A1. This represents the adjust mode "Brew Time" for the "A" brew switch. The display will then change to (minutes-seconds). Press "BREW A" to decrease time (-) or "BREW B" to increase time (+).

2.Press and release "HIDDEN" switch until display reads A2. This represents the adjust mode "Brew Meter" (Pulse Brew) for the "A" brew switch. The display will then change to (1-14). Brewer has 14 preset pulse brew routines to choose from. Factory default is 1. With 14 being the maximum time. Press "BREW A" to decrease (-) or "BREW B" to increase (+).

3.Press and release "HIDDEN" switch until display reads A3. This represents the adjust mode "Drip Out Time" for the "A" brew switch. The display will then change to (minutes-seconds). Press "BREW A" to decrease time (-) or "BREW B" to increase time (+).

4.Repeat steps 1 -3 for setting the "B" brew switch.

A1 = Brew switch "A" Brew time

A2 = Brew switch "A" Brew meter

A3 = Brew switch "A" Drip out time

B1 = Brew switch "B" Brew time

B2 = Brew switch "B" Brew meter

B3 = Brew switch "B" Drip out time

Restore Factory Defaults:

Press the "ENABLE BREW ON/OFF" switch while applying AC power. Continue pressing the "ENABLE BREW ON/ OFF" switch for 10 seconds. During that 10 seconds the middle bars on the display will be on. After 10 Seconds the the 3 upper, middle and lower bars on the display will be lit for 5 seconds. During that 5 seconds, release and again press the "ENABLE BREW ON/OFF" switch to restore default settings – the display will show “DONE”.

Note: The Restore process cannot be done when Dip Switch # 1 is On (Program Lockout)

Page 11

40410

092407

 

DELIMING

Bunn-O-Matic recommends deliming your coffee brewer periodically. The actual frequency of deliming depends on the mineral content of the water you use. NOTE: In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer and takes less than a minute.

Follow these simple steps:

1.Unplug the brewer and let it cool down before proceeding.

2.Remove the brew funnel.

3.Remove the sprayhead by turning it to the left with your fingertips and set it aside.

4.With the sprayhead removed, insert the deliming spring (provided) all the way into the sprayhead tube. When inserted properly, no more than two inches of spring should be visible. Saw back and forth five or six times. Remove the spring.

5.Check the holes in the sprayhead. If plugged by lime, they may be cleared using a toothpick. Rinse the sprayhead with water before reinstalling it.

6.Reinstall the sprayhead by turning it to the right.

7.Plug in the brewer and allow the water to reheat before using.

Remove sprayhead by turning counterclockwise

FIG 9

 

 

 

 

 

 

 

 

 

Keep vent hole

 

 

 

 

 

 

clear of debris

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

deliming spring

 

 

 

FIG

10

 

 

 

 

 

while pushing in

 

 

 

 

 

 

Page 12

 

 

 

 

 

 

 

 

40410

092407

CLEANING

The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment.

CLEANING OPTIONAL LARGE SPRAYHEAD

1.Remove the brew funnel.

2.Remove the sprayhead by turning it counterclockwise with your fingertips.

3.Disassemble sprayhead by removing rubber gasket.

4.Check the holes in the sprayhead. If plugged by lime, they may be cleared using a toothpick. Rinse the sprayhead with water.

5.Reassemble the sprayhead according to FIG 11. NOTE: Verify the indents are aligned. (ARROWS)

6.Reinstall the sprayhead by turning it clockwise. Hand tighten only!

FIG 12

FIG 11

Page 13

40410

092407

 

COVER REMOVAL

Unplug the brewer and let it cool down before proceeding.

Front Wrap:

1.Remove the brew funnel.

2.Remove upper and lower screws on either side of front cover.

3.Loosen middle screw on either side of front cover.

4.Pull front cover towards front of brewer.

Top Cover:

1. Remove both screws. REMOVE

2. Lift top cover to clear front tabs.

REMOVE

REMOVE

LOOSEN

REMOVE

FIG 13

Page 14

40410

092407

 

DRAINING TANK

1.Unplug the brewer and let it cool down before proceeding.

2.Remove the brew funnel.

3.Remove the front cover.

4.Pinch fill hose.

5.Loosen clamp from fill solenoid..

6.Remove hose from solenoid and drain into sink as shown (or 2 gallon bucket).

7.After draining, reinstall hose and clamp. (Hand tighten only).

FIG 14

Page 15

40410

092407

 

SWITCH SETTINGS

Program Switches:

1. Unplug the brewer and let it cool down before proceeding.

3.Remove the left rear cover.

4.Flip the dip switches as needed.

NOTE: All switches are turned OFF from factory.

 

KEY #

FUNCTION - OFF

FUNCTION - ON

4.

High altitude

Set temp 200°F (93°C)

Set temp 190°F (87.8°C)

3.

Energy Save

No energy save mode

Drops to 140°F (60°C) @ 6 hours/OFF @ 26h

2.

Brew lockout

Brew @ any temp

Only brews when it indicates ready

1.

Program lockout

Programming allowed

All programming locked out

 

 

 

 

FIG 15

FIG 16

ON

1 2 3 4

OFF

Page 16

40410

092407

 

TROUBLESHOOTING

RED LED FLASHES

DISPLAY

DESCRIPTION

ACTION

1.

ER 1

TEMP SENSOR SHORTED

CALL SERVICE

2.

ER 2

TEMP SENSOR OPEN

CALL SERVICE

3.

ER 3

HEATING TOO LONG

CALL SERVICE

4.

ER 4

REFILL TOO LONG

CHECK WATER SUPPLY

5.

ER 5

HIGH TANK LEVEL-DURING BREW

DELIME

6.

ER 6

CHECK "ENABLE BREW ON/OFF" SWITCH

CHECK SWITCH

7.

ER 7

CHECK "BREW A"/"LARGE" SWITCH

CHECK SWITCH

8.

ER 8

CHECK "BREW B"/"LARGE" SWITCH

CHECK SWITCH

Not Applicable

ER 9

CHECK "HIDDEN" SWITCH

CHECK SWITCH

Page 17

40410

092407

 

L1 N

BLK

 

WHI

 

 

 

 

GRN/YEL

WHI

SCHEMATIC WIRING DIAGRAM WAVE 15 APS, 15 S APS

Earth Ground

Chassis Ground

 

 

L1

NT

 

 

LIMIT

 

 

 

 

 

 

 

 

THERMOSTAT

 

 

 

 

 

 

 

BLK

 

BLK-14

TANK HEATER

WHI

 

 

 

HEATER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WATER

RED/BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHI/ORN +12

 

 

 

 

WATER INLET SOLENOID

RELAY

 

 

 

 

 

1 ORN

J2-1

ORN

+12

 

 

 

 

 

 

 

BRN

- ON/0 OFF

 

 

 

BRN

 

 

 

 

 

 

 

 

 

#

 

RED/BLK - ON/0 OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

PNK

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

AIR PUMP MOTOR

 

 

 

GRN

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

VENT VALVE SOLENOID

12VDC

 

 

/

 

BLK

+ .5V HOT 4.5V COLD

 

 

12VDC

 

 

 

,J3-1

 

 

 

 

 

WHI

-

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

LEVEL PROBE

 

 

J5-1

#

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

 

 

 

 

 

 

 

 

 

!

 

 

 

tο

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

$

 

 

 

GRN

 

 

 

 

 

 

 

J1-1

 

J1-1

 

 

 

 

 

J4

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAN

 

 

 

 

10

 

5

 

 

 

 

 

 

 

 

 

 

 

BLU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J1-5

 

 

YEL

 

 

 

 

 

 

 

 

 

WHI/RED

-12V

 

 

 

6

 

1

 

 

 

 

 

 

 

 

 

 

ORN

+12V

 

 

 

WAVE 15 APS

DISPLAY BOARD

120V AC

2 WIRE + GND SINGLE PHASE

J1-1

RED

1

RED

BREW START SWITCH

 

 

 

 

BLK

 

BLK

 

 

 

 

 

 

 

 

 

WHI/BLK

 

 

 

 

 

 

BLU

 

 

3

2

1

 

YEL

 

 

 

 

 

 

 

 

 

ORN

 

 

 

 

 

 

 

 

ENABLE BREW

 

 

 

 

 

1

2

 

 

WAVE 15 S APS

40405.0000B 09/07 ©2007 BUNN-O-MATIC CORPORATION

Page 18

40410

092407

 

 

 

 

 

SCHEMATIC WIRING DIAGRAM

 

 

L1

N

GRN/YEL

WAVE 15 APS, 15 S APS

 

 

 

 

 

 

 

 

 

 

 

 

 

Earth Ground

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BRN

BLU

 

Chassis Ground

 

 

 

 

 

WHI

 

 

 

 

 

 

 

 

 

 

 

 

LIMIT

 

 

LIMIT

WHI

 

 

L1

NT

 

 

 

 

 

 

 

 

 

THERMOSTAT

 

THERMOSTAT

 

 

 

 

 

 

TANK HEATER

 

 

 

HEATER

BLU/BLK

 

BLK-14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WATER

RED/BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHI/ORN +12

 

 

 

1

WATER INLET SOLENOID

RELAY

 

 

 

 

ORN

J2-1

ORN

+12

 

 

 

 

 

 

BRN

- ON/0 OFF

 

 

 

BRN

 

 

 

 

 

 

 

 

 

#

 

RED/BLK - ON/0 OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

PNK

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

AIR PUMP MOTOR

 

 

 

GRN

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

2

 

 

 

 

 

VENT VALVE SOLENOID

12VDC

 

 

/

 

BLK

+ .5V HOT 4.5V COLD

 

12VDC

 

 

 

 

,J3-1

 

 

 

 

 

WHI -

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

LEVEL PROBE

 

 

 

J5-1

#

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

 

 

 

 

 

 

 

 

 

!

 

 

 

tο

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

$

 

 

 

GRN

 

 

 

 

 

 

 

J1-1

 

J1-1

 

 

 

 

 

J4

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAN

 

 

 

 

10

 

5

 

 

 

 

 

 

 

 

 

 

 

BLU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J1-5

 

 

YEL

 

 

 

 

 

 

 

 

 

WHI/RED

-12V

 

 

 

6

 

1

 

 

 

 

 

 

 

 

 

 

ORN

+12V

 

 

 

WAVE 15 APS

DISPLAY BOARD

230V AC

2 WIRE + GND SINGLE PHASE

J1-1

RED

1

RED

BREW START SWITCH

 

 

 

 

BLK

 

BLK

 

 

 

 

 

 

 

 

 

WHI/BLK

 

 

 

 

 

 

BLU

 

 

3

2

1

 

YEL

 

 

 

 

 

 

 

 

 

ORN

 

 

 

 

 

 

 

 

ENABLE BREW

 

 

 

 

 

1

2

 

 

 

WAVE 15 S APS

 

 

 

 

 

40405.0001A 02/08 ©2008 BUNN-O-MATIC CORPORATION

Page 19

40410

022808

 

MAIN ON/OFF

SWITCH

TERMINAL BLOCK

L1 L2 N

BLK

RED

WHI

GRN/YEL

BLK

WHI

SCHEMATIC WIRING DIAGRAM WAVE 120/240V APS SERIES

Earth Ground

Chassis Ground

WHI

RED

 

 

L1

NT

 

 

LIMIT

 

 

 

 

 

 

 

 

THERMOSTAT

 

 

 

 

 

 

 

BLK

 

BLK-14

TANK HEATER

 

 

 

 

HEATER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WATER

RED/BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHI/ORN +12

 

 

 

1

WATER INLET SOLENOID

RELAY

 

 

 

 

ORN

J2-1

ORN

+12

 

 

 

 

 

 

BRN

- ON/0 OFF

 

 

 

BRN

 

 

 

 

 

 

 

 

 

#

 

RED/BLK - ON/0 OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

PNK

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

AIR PUMP MOTOR

 

 

 

GRN

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

VENT VALVE SOLENOID

12VDC

 

 

/

 

BLK

+ .5V HOT 4.5V COLD

 

 

12VDC

 

 

 

,J3-1

 

 

 

 

 

WHI

-

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

LEVEL PROBE

 

 

J5-1

#

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

 

 

 

 

 

 

 

 

 

!

 

 

 

tο

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

$

 

 

 

GRN

 

 

 

 

 

 

 

J1-1

 

J1-1

 

 

 

 

 

J4

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAN

 

 

 

 

10

 

5

 

 

 

 

 

 

 

 

 

 

 

BLU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J1-5

 

 

YEL

 

 

 

 

 

 

 

 

 

WHI/RED

-12V

 

 

 

6

 

1

 

 

 

 

 

 

 

 

 

 

ORN

+12V

 

 

 

WAVE APS

DISPLAY BOARD

120/240V AC 3 WIRE + GND SINGLE PHASE

J1-1

RED

1

RED

BREW START SWITCH

 

 

 

 

BLK

 

BLK

 

 

 

 

 

 

 

 

 

WHI/BLK

 

 

 

 

 

 

BLU

 

 

3

2

1

 

YEL

 

 

 

 

 

 

 

 

 

ORN

 

 

 

 

 

 

 

 

ENABLE BREW

 

 

 

 

 

1

2

 

 

WAVE SILVER APS

40405.0002A 02/08 ©2008 BUNN-O-MATIC CORPORATION

Page 20

40410

022808