Beisler 739-23-1 Installation Manual

Content Page:
Part 2: Installation Instructions
1.Delivery ....................................................... 3
2.Introduction .................................................... 3
3.Installation of sewing machine ........................................ 3
3.1 Removing of transport packaging ..................................... 3
3.2 Transport ................................................... 4
3.3 Adjustment of working height ....................................... 5
3.4 Installation of yarn stand .......................................... 6
3.5 Installation of suction unit ......................................... 7
3.6 Power connection .............................................. 8
3.6.1 Checking of power supply voltage .................................... 8
3.6.2 Connection to power supply ........................................ 8
3.6.3 Direction of motor rotation ......................................... 8
3.7.1 Connection to compressed air mainenance unit ............................ 9
3.7.2 Adjustment of operating pressure..................................... 10
3.8 Lubrication .................................................. 11
3.9. Sewing test run ............................................... 12
2
1
3
4
575
6
8
1. Delivery
2. Introduction
The scope of delivery depends on your order. Prior to installation, please check whether all required parts have been
supplied.
Equipment: –
1 yarn stand
2 sewing machine head
3 operating panel
4 sewing lamp (optional)
5 material clamp support
6 material clamp (optional)
7 waste bin with suction control
8 drawer
CAUTION!
The sewing machine must be installed by suitably trained specialised personnel.
Work at electrical components must be carried out by electricians or other suitably trained staff. Prior to such work, always discconect unit from the power supply.
Always comply with the instructions given by the manufacturer of the step motors in the enclosed operating manual.
Separately packed small components
3. Installation of sewing machine
3.1 Removing of transport packaging
Remove transport packaging and securing devices at the sewing machine head.
2-3
3.2 Transport
21
The unit is equipped with four castors for easy mobility within your premises.
Caution!
Prior to the commissioning of the sewing unit, slide the rubber caps 1 over the feet of the frame.
For the operation of the sewing machine, the castors 2 must be lifted so that the unit is standing on its feet.
Lower the castors to transport the unit within your premises by turing the set screws 3 anticlockwise.
For transport, ensure that the frame feet 1 are sufficiently lifted
from the ground.
After transport, lower the sewing machine until it stands firmly on its feet by turning the set screws 3 in clockwise direction.
32 1
2-4