American Standard 2900, 2800 User Manual

0 (0)
US60359E
2900.SERIES
2800.SERIES
Certified to comply with ANSI A112.18.1M
Required Tools
*Supplied with Fitting
*Hex key
RECESS
Turn off hot and cold water supplies before beginning.
1
2
Insert SPOUT SHANK (1) through center hole of MOUNTING LEDGE.
Make sure that the RUBBER RING (2) is properly seated in RECESS
at base of SPOUT (3).
Assemble RUBBER WASHER (4) and BRASS WASHER (5) onto
SHANK (1). From underside of ledge secure SPOUT (3) into position
with LOCKNUT (6).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
3
4
2
3
1
3
4
1
2
4
6
5
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
ADJ. 6-1/2 TO 12
5
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
MOUNTING
LEDGE.
VALVE inlet is 3/4-inch NPT male connector.
NOTE
1-1/4
MAX.
3
4
(H)
(C)
1-1/8 D.
3/4-14 MALE
N.P.T. INLETS
MOUNTING
SURFACE
ADJ. 6-1/2 TO 12
2-3/8D.
3 D.
1-1/16 D.
3-3/8
ROUGHING-IN DIMENSIONS
MOUNTING
SURFACE
2-3/8D.
3 D.
3-3/8
3-13/16
7-3/4
6-1/2
DECK-MOUNT BATH FILLER
Installation
Instructions
TM
Williamsburg
Thank you for selecting American-Standard...the benchmark of
fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
8-1/2
2-1/4
4-1/4
RECESS
Loading...
+ 2 hidden pages