Nortel Communication Server 1000
Nortel Communication Server 1000 Release 5.5
Communication Server 1000M and
Meridian 1
Large System Installation and Commissioning
Document Number: NN43021-310
Document Release: Standard 02.01
Date: December 2007
Copyright © 2007, Nortel Networks. All rights reserved.
Sourced in Canada
LEGAL NOTICE While the information in this document is believed to be accurate and reliable, except as otherwise expressly agreed to in writing. NORTEL PROVIDES THIS DOCUMENT "AS IS" WITHOUT WARRANTY OR CONDITION OF ANY KIND, EITHER EXPRESS OR IMPLIED. The information and/or products described in this document are subject to change without notice.
Nortel, Nortel (Logo), the Globemark, SL-1, Meridian 1, and Succession are trademarks of Nortel Networks. All other trademarks are the property of their respective owners.
10
Page 3 of 456
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
3 |
New in this release . . . . . . . . . . . . . . . . . . . . . . . . . |
11 |
Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
11 |
Other . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
11 |
List of Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . |
13 |
How to get help . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
19 |
Getting help from the Nortel Web site . . . . . . . . . . . . . . . . . . . . . . . . . |
19 |
Getting help over the telephone from a Nortel Solutions Center . . . . . |
19 |
Getting help from a specialist by using an Express Routing Code . . . . |
20 |
Getting help through a Nortel distributor or reseller .. . . . . . . . . . . . . . |
20 |
Finding the latest updates |
|
on the Nortel web site . . . . . . . . . . . . . . . . . . . . . . . |
21 |
System information . . . . . . . . . . . . . . . . . . . . . . . . . |
23 |
Subject .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
23 |
Applicable systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
24 |
Intended audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
25 |
Conventions .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
26 |
NTP feedback . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
26 |
Related information .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
27 |
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 4 of 456 Contents |
|
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
31 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
31 |
Overview .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
31 |
Summary of procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
33 |
Preparing for installation . . . . . . . . . . . . . . . . . . . . |
37 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
37 |
Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
37 |
System equipment – UEMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
38 |
System options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
45 |
Cable routing guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
54 |
Equipment handling precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
58 |
Preparing the equipment for installation .. . . . . . . . . . . . . . . . . . . . . . . |
62 |
Placing the fourth module on a column . . . . . . . . |
65 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
65 |
Overview .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
65 |
Placing the fourth module on a column . . . . . . . . . . . . . . . . . . . . . . . . |
65 |
Positioning and leveling equipment . . . . . . . . . . . |
71 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
71 |
Positioning and leveling the equipment . . . . . . . . . . . . . . . . . . . . . . . . |
71 |
Installing AC power . . . . . . . . . . . . . . . . . . . . . . . . |
77 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
77 |
AC-powered systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
77 |
Safety ground/protective earth and logic return wiring . . . . . . . . . . . . |
78 |
Installing safety ground/protective earth and logic return wiring .. . . . |
82 |
Installing UPS ground cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
85 |
Installing overhead cable tray kits . . . . . . . . . . . . |
89 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
89 |
NN43021-310 Standard 02.01 December 2007
|
Contents Page 5 of 456 |
Installing overhead cable tray kits .. . . . . . . . . . . |
. . . . . . . . . . . . . . . . . 89 |
Installing DC power . . . . . . . . . . . . |
. . . . . . . . . . . . . 93 |
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
. . . . . . . . . . . . . . . . 93 |
DC-powered systems .. . . . . . . . . . . . . . . . . . . . . . |
. . . . . . . . . . . . . . . . 93 |
Candeo DC power systems . . . . . . . . . . . . . . . . . . |
. . . . . . . . . . . . . . . . 94 |
Planning and designating a
Main Distribution Frame . . . . . . . . . . . . . . . . . . . . . 133
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 About terminations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 Installation and designation .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 Terminal block requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134 Installing the BIX cross-connect terminal .. . . . . . . . . . . . . . . . . . . . . . 134 Installing the Krone cross-connect system (UK) . . . . . . . . . . . . . . . . . 138
Installing Power Failure Transfer Units . . . . . . . . . 145
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145 PFTU configurations .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145 Installing a PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148 Connecting trunks and telephones .. . . . . . . . . . . . . . . . . . . . . . . . . . . . 149 Installing QUA6 PFTUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150
Configuring the system monitor . . . . . . . . . . . . . . 151
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151 System monitor cabling .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151 Configuring the System Monitor .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153 Cabling the System Monitor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157 Alarm interfacing to Candeo .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165 Configuring the alarm ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 168 Customizing alarms .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 169
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 6 of 456 Contents |
|
Connecting a system terminal or modem . . . . . . |
171 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
171 |
About the system terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
171 |
Connecting a terminal .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
173 |
Connecting a terminal to a COM port . . . . . . . . . . . . . . . . . . . . . . . . . |
174 |
Connecting a switch box and terminal to |
|
COM1 and COM2 ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
175 |
Connecting a switch box and terminal to |
|
SDI and COM1 ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
177 |
Connecting a modem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
178 |
Configuring a modem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
180 |
Connecting a modem to an SDI port . . . . . . . . . . . . . . . . . . . . . . . . . . |
181 |
Connecting a modem to switch box, COM2 ports, SDI ports . . . . . . . |
183 |
Cabling Common Equipment in a |
|
Single Group system . . . . . . . . . . . . . . . . . . . . . . . |
187 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
187 |
Cabling guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
187 |
Core/Net module .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
189 |
Cabling the Core side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
193 |
Cabling the I/O panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
195 |
Cabling the Network side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
197 |
Configuring and cabling the Clock Controllers . . . . . . . . . . . . . . . . . . |
198 |
Network Group 0: Shelf 0 to Shelf 1 . . . . . . . . . . . . . . . . . . . . . . . . . . |
199 |
Connecting the 3PE faceplates in the Core/Net modules . . . . . . . . . . . |
199 |
Inspecting CNI to 3PE factory installed cables . . . . . . . . . . . . . . . . . . |
200 |
Connecting the Core/Net backplanes . . . . . . . . . . . . . . . . . . . . . . . . . . |
202 |
Optioning the System Utility Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
203 |
Connecting Core modules to a LAN .. . . . . . . . . . . . . . . . . . . . . . . . . . |
204 |
NN43021-310 Standard 02.01 December 2007
Contents Page 7 of 456
Cabling Common Equipment in a
Multi Group system . . . . . . . . . . . . . . . . . . . . . . . . . 207
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207 Cabling guidelines .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207 Core/Net module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209 Cabling the Core/Net module backplane . . . . . . . . . . . . . . . . . . . . . . . 212 Disconnecting cables from the Core/Net module backplane . . . . . . . . 213 Optioning the System Utility Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215 Core shelf cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216 Installing the CP PIV to I/O panel cables . . . . . . . . . . . . . . . . . . . . . . . 220 Connecting the Core module to a LAN .. . . . . . . . . . . . . . . . . . . . . . . . 223 Cabling a Dual Ring Fiber Network . . . . . . . . . . . . . . . . . . . . . . . . . . . 224 FIJI card cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 228 Installing the Shelf 0 fiber optic ring (ascending) .. . . . . . . . . . . . . . . . 231 Installing the Shelf 1 fiber optic ring (descending) .. . . . . . . . . . . . . . . 232 FIJI to FIJI cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 234 Connecting the Clock Controller cables . . . . . . . . . . . . . . . . . . . . . . . . 235
Cabling network modules and loops . . . . . . . . . . . 239
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 239 Network-to-network cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 239 Network module connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 240 Network Group 0: Shelf 0 to Shelf 1 .. . . . . . . . . . . . . . . . . . . . . . . . . . 240 Connecting the 3PE faceplates in the Core/Net modules . . . . . . . . . . . 240 Connecting the Core/Net backplanes . . . . . . . . . . . . . . . . . . . . . . . . . . 241 Connecting Groups 1 through 7: Shelf 0 to Shelf 1 . . . . . . . . . . . . . . . 242 Connecting the Network modules to the Core/Net modules .. . . . . . . . 245 Connecting the 3PE cables to the 3PE fanout panels . . . . . . . . . . . . . . 250 Cabling a Superloop Network Card – single column . . . . . . . . . . . . . . 252 Cabling a Superloop Network Card – multiple columns . . . . . . . . . . . 256
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 8 of 456 Contents |
|
Cabling lines and trunks . . . . . . . . . . . . . . . . . . . . |
261 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
261 |
Overview .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
261 |
Cabling an IPE Module or Media Gateway . . . . . . . . . . . . . . . . . . . . . |
263 |
Connecting lines and trunks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
266 |
Powering up the system and initial loading . . . . . |
299 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
299 |
Overview .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
299 |
Installing the Security Device .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
299 |
Preparing to power up – AC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
302 |
Connecting the AC power source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
302 |
Turning AC power ON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
303 |
Resetting the main circuit breakers (AC power) . . . . . . . . . . . . . . . . . |
304 |
Preparing to power up – DC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
306 |
Turning DC power ON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
306 |
Installing software .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
308 |
Testing Core/Net 1 and Core/Net 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . |
330 |
Performing acceptance tests . . . . . . . . . . . . . . . . |
335 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
335 |
Acceptance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
335 |
Testing the module power supply .. . . . . . . . . . . . . . . . . . . . . . . . . . . . |
336 |
Testing the blower unit and thermal sensor . . . . . . . . . . . . . . . . . . . . . |
337 |
Testing the sysload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
339 |
Testing the system terminal and system monitor . . . . . . . . . . . . . . . . . |
340 |
Testing the PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
341 |
Installing earthquake bracing . . . . . . . . . . . . . . . . |
343 |
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
343 |
Seismic-approved applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
343 |
NN43021-310 Standard 02.01 December 2007
Contents Page 9 of 456
Installing seismic bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 344 Drilling concrete floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 347 Installing Kit A and Kit B anchor plates .. . . . . . . . . . . . . . . . . . . . . . . 349 Installing earthquake rods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351 Positioning and leveling the system . . . . . . . . . . . . . . . . . . . . . . . . . . . 357 Installing non-seismic bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 358 Installing a non-seismic anchor kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359
Adding a module to a column . . . . . . . . . . . . . . . . 363
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 363 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 363 Adding a module to the base of a column .. . . . . . . . . . . . . . . . . . . . . . 364 Adding a module between two other modules . . . . . . . . . . . . . . . . . . . 370 Adding a module to the top of a column .. . . . . . . . . . . . . . . . . . . . . . . 374
Installing a Signaling Server . . . . . . . . . . . . . . . . . 383
Contents .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 383 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 384 Readiness checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 385 Installing the CP PM Signaling Server hardware . . . . . . . . . . . . . . . . . 387 Connections .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 389 Installing the Signaling Server software . . . . . . . . . . . . . . . . . . . . . . . . 399 First boot of a new Nortel CP PM Signaling Server .. . . . . . . . . . . . . . 426 Unpacking Help files for Virtual Terminal Emulator . . . . . . . . . . . . . . 445 Logging in to the Signaling Server . . . . . . . . . . . . . . . . . . . . . . . . . . . . 445 Verifying a successful configuration .. . . . . . . . . . . . . . . . . . . . . . . . . . 447 Testing the Leader Signaling Server . . . . . . . . . . . . . . . . . . . . . . . . . . . 447
Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 449
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 10 of 456 Contents
NN43021-310 Standard 02.01 December 2007
12
Page 11 of 456
There are no new features in this NTP for CS 1000 Release 5.5.
December 2007
Standard 02.01. This document is up-issued for Communication Server 1000
Release 5.5.
July 2007
Standard 01.03. This document is up-issued for Communication Server 1000
Release 5.0.
July 2007
Standard 01.02. This document is up-issued for Communication Server 1000
Release 5.0.
May 2007
Standard 01.01. This document is up-issued for Communication Server 1000 Release 5.0. This document contains information previously contained in the following legacy document, now retired: Communication Server 1000M and Meridian 1: Large System Installation and Configuration (553-3021-210).
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 12 of 456 New in this release
April 2006
Standard 4.00. This document is up-issued with corrections from CR Q01311083. The corrections appear in the “Configuring the System Monitor' section (page 153 to page 157).
August 2005
Standard 3.00. This document is up-issued to support Communication
Server 1000 Release 4.5.
September 2004
Standard 2.00. This document is up-issued to support Communication
Server 1000 Release 4.0.
October 2003
Standard 1.00. This document is a new NTP for Succession 3.0. It was created to support a restructuring of the Documentation Library, which resulted in the merging of multiple legacy NTPs. This new document consolidates information previously contained in the following legacy documents, now retired:
•Cabling Guide (553-3001-109)
•System Installation Procedures (553-3001-210)
NN43021-310 Standard 02.01 December 2007
18
Page 13 of 456
Procedure 1
Preparing the equipment for installation . . . . . . . . . . . . . . . . . . . . . 62
Procedure 2
Placing the fourth module on a column . . . . . . . . . . . . . . . . . . . . . . 66
Procedure 3
Positioning and leveling the equipment . . . . . . . . . . . . . . . . . . . . . . 71
Procedure 4
Installing safety ground/protective earth and logic return wiring . 82
Procedure 5 |
|
Installing the UPS ground cabling . . . . . . . . . . . . . . . . . . . . . . . . . . |
86 |
Procedure 6
Installing the overhead cable tray kits . . . . . . . . . . . . . . . . . . . . . . . 90
Procedure 7
Installing and connecting the power plant frame ground leads . . . 113
Procedure 8
Installing safety ground/protective earth wiring . . . . . . . . . . . . . . . 123
Procedure 9
Connecting power from the power plant to the PDU (NT4N49AA) . 125
Procedure 10
Connecting UK power to the Four-Feed PDU . . . . . . . . . . . . . . . . . 129
Procedure 11
Installing the BIX cross-connect terminal . . . . . . . . . . . . . . . . . . . . 135
Procedure 12
Installing the Krone Test Jack Frame (UK) . . . . . . . . . . . . . . . . . . . . 138
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 14 of 456
Procedure 13 |
|
Installing a PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
148 |
Procedure 14
Connecting trunks and telephones . . . . . . . . . . . . . . . . . . . . . . . . . 149
Procedure 15
Configuring the System Monitor (NT8D22) . . . . . . . . . . . . . . . . . . . 153
Procedure 16
Cabling the System Monitor (NT8D22) . . . . . . . . . . . . . . . . . . . . . . . 158
Procedure 17 |
|
Configuring the alarm ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
169 |
Procedure 18
Connecting a terminal to a COM port . . . . . . . . . . . . . . . . . . . . . . . . 174
Procedure 19 |
|
Connecting a switch box and terminal to COM1 and COM2 ports |
175 |
Procedure 20 |
|
Connecting a switch box and terminal to the SDI and COM1 ports 177 |
|
Procedure 21 |
|
Configuring a modem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
180 |
Procedure 22 |
|
Connecting a modem to an SDI port . . . . . . . . . . . . . . . . . . . . . . . . |
181 |
Procedure 23
Connecting a modem to a switch box, COM2 and SDI ports . . . . . 183
Procedure 24
Installing the CP PIV to I/O panel cables . . . . . . . . . . . . . . . . . . . . . 196
Procedure 25
Connecting the Clock Controller cables . . . . . . . . . . . . . . . . . . . . . 199
Procedure 26
Connecting the 3PE faceplates in the Core/Net modules . . . . . . . . 200
Procedure 27
Inspecting NT4N29AA factory installed cables . . . . . . . . . . . . . . . . 200
Procedure 28
Connecting the Core/Net backplanes . . . . . . . . . . . . . . . . . . . . . . . . 202
NN43021-310 Standard 02.01 December 2007
Page 15 of 456
Procedure 29
Connecting the Core module to a LAN . . . . . . . . . . . . . . . . . . . . . . . 205
Procedure 30
Cabling the Core/Net module backplane . . . . . . . . . . . . . . . . . . . . . 213
Procedure 31
Disconnecting cable connectors from the backplane . . . . . . . . . . . 214
Procedure 32
Installing the CP PIV to I/O panel cables . . . . . . . . . . . . . . . . . . . . . 221
Procedure 33
Connecting the Core module to a LAN . . . . . . . . . . . . . . . . . . . . . . . 223
Procedure 34
Installing the Shelf 0 fiber optic ring (ascending) . . . . . . . . . . . . . . 231
Procedure 35
Installing the Shelf 1 fiber optic ring . . . . . . . . . . . . . . . . . . . . . . . . . 232
Procedure 36
Connecting the FIJI to FIJI cables . . . . . . . . . . . . . . . . . . . . . . . . . . . 234
Procedure 37
Connecting the Clock Controller cables . . . . . . . . . . . . . . . . . . . . . . 236
Procedure 38
Connecting the 3PE faceplates in the Core/Net modules . . . . . . . . 240
Procedure 39
Connecting the Core/Net backplanes . . . . . . . . . . . . . . . . . . . . . . . . 241
Procedure 40
Connecting Groups 1 through 7: Shelf 0 to Shelf 1 . . . . . . . . . . . . . 243
Procedure 41
Connecting the Network Shelf 0 3PE cards to Core/Net 0 . . . . . . . 251
Procedure 42
Connecting the Network Shelf 1 3PE cards to Core/Net 1 . . . . . . . 251
Procedure 43
Basic cabling for single-row network connections . . . . . . . . . . . . . 252
Procedure 44
Basic cabling for multiple-row network connections . . . . . . . . . . . 256
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 16 of 456
Procedure 45
Cabling an IPE Module (NT8D37) or Media Gateway . . . . . . . . . . . 264
Procedure 46 |
|
Connecting lines and trunks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
266 |
Procedure 47 |
|
Installing the Security Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
300 |
Procedure 48 |
|
Preparing to power up – AC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
302 |
Procedure 49
Option 1: Using the installed power plug (recommended) . . . . . . . 302
Procedure 50
Option 2: Hard-wiring the power connections (optional) . . . . . . . . 303
Procedure 51 |
|
Turning AC power on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
303 |
Procedure 52
Resetting the main circuit breakers (AC power) . . . . . . . . . . . . . . . 304
Procedure 53 |
|
Preparing to power up – DC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
306 |
Procedure 54 |
|
Turning DC power ON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
307 |
Procedure 55 |
|
Installing the software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
309 |
Procedure 56 |
|
Testing Core/Net 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
330 |
Procedure 57 |
|
Switching call processing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
332 |
Procedure 58 |
|
Testing Core/Net 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
333 |
Procedure 59 |
|
Testing module power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
336 |
Procedure 60 |
|
Testing blower unit and thermal sensor . . . . . . . . . . . . . . . . . . . . . |
337 |
NN43021-310 Standard 02.01 December 2007
Page 17 of 456
Procedure 61
Sysload test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 339
Procedure 62
Testing system terminal and system monitor . . . . . . . . . . . . . . . . . 340
Procedure 63
Testing the PFTU and its interface . . . . . . . . . . . . . . . . . . . . . . . . . . 341
Procedure 64 |
|
Drilling concrete floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
348 |
Procedure 65
Installing Kit A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 349
Procedure 66
Installing Kit B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351
Procedure 67
Installing earthquake rods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352
Procedure 68
Leveling the system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 357
Procedure 69
Installing a Floor Mounting Kit (NT8D64BF) . . . . . . . . . . . . . . . . . . . 359
Procedure 70
Adding a module to the base of a column . . . . . . . . . . . . . . . . . . . . 365
Procedure 71
Adding a module between two other modules . . . . . . . . . . . . . . . . 370
Procedure 72
Adding a module to the top of the column . . . . . . . . . . . . . . . . . . . . 374
Procedure 73
Connecting a Nortel CP PM Signaling Server . . . . . . . . . . . . . . . . . 392
Procedure 74
Connecting a CP PM Signaling Server to the ELAN and TLAN subnets of a CS 1000E system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 393
Procedure 75 |
|
Connecting a CP PM Signaling Server to the ELAN and TLAN subnets of |
|
a CS 1000M system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
395 |
Procedure 76 |
|
Connecting an IBM X306m Signaling Server . . . . . . . . . . . . . . . . . . |
396 |
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 18 of 456
Procedure 77
Connecting an HP DL320-G4 Signaling Server . . . . . . . . . . . . . . . . 398
Procedure 78
Installing Signaling Server software . . . . . . . . . . . . . . . . . . . . . . . . . 400
Procedure 79
Entering basic system configuration parameters . . . . . . . . . . . . . . 427
Procedure 80
Adding a Follower Signaling Server to an IP Telephony node . . . 441
Procedure 81
Logging in to the Signaling Server . . . . . . . . . . . . . . . . . . . . . . . . . . 446
Procedure 82
Verifying the Signaling Server Ethernet connection . . . . . . . . . . . . 447
NN43021-310 Standard 02.01 December 2007
20
Page 19 of 456
This section explains how to get help for Nortel products and services.
The best way to get technical support for Nortel products is from the Nortel
Technical Support Web site:
www.nortel.com/support
This site provides quick access to software, documentation, bulletins, and tools to address issues with Nortel products. More specifically, the site enables you to:
•download software, documentation, and product bulletins
•search the Technical Support Web site and the Nortel Knowledge Base for answers to technical issues
•sign up for automatic notification of new software and documentation for Nortel equipment
•open and manage technical support cases
If you don’t find the information you require on the Nortel Technical Support Web site, and have a Nortel support contract, you can also get help over the phone from a Nortel Solutions Center.
In North America, call 1-800-4NORTEL (1-800-466-7835).
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 20 of 456 How to get help
Outside North America, go to the following Web site to obtain the phone number for your region:
www.nortel.com/callus
To access some Nortel Technical Solutions Centers, you can use an Express Routing Code (ERC) to quickly route your call to a specialist in your Nortel product or service. To locate the ERC for your product or service, go to:
www.nortel.com/erc
If you purchased a service contract for your Nortel product from a distributor or authorized reseller, contact the technical support staff for that distributor or reseller.
NN43021-310 Standard 02.01 December 2007
22
Page 21 of 456
The content of this documentation was current at the time the product was released. To check for updates to the latest documentation and software for CS 1000 Release 5.5, click one of the links below.
Latest Software |
Takes you directly to the Nortel |
|
page for CS 1000 Release 5.5 |
|
software. |
|
|
Latest Documentation |
Takes you directly to the Nortel |
|
page for CS 1000 Release 5.5 |
|
documentation. |
|
|
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 22 of 456 Finding the latest updates on the Nortel web site
NN43021-310 Standard 02.01 December 2007
30
Page 23 of 456
This document is a global document. Contact your system supplier or your Nortel representative to verify that the hardware and software described are supported in your area.
WARNING
Before a Large System can be installed, a network assessment must be performed and the network must be VoIP-ready.
If the minimum VoIP network requirements are not met, the system will not operate properly.
For information on the minimum VoIP network requirements and converging a data network with VoIP, refer to Converging the Data Network with VoIP
(NN43001-260).
This document provides installation and acceptance testing procedures for
Meridian 1 Large Systems and Communication Server 1000M Large
Systems.
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 24 of 456 System information
For this document, the CP PIV processor is assumed in the case of the CS 1000M SG, Meridian 1 PBX 61C, CS 1000M MG, and Meridian 1
PBX 81C. If you are installing a system with a CP PII processor, please refer to the CS 1000 Release 5.0 version of this document, available on the web at:
www.nortel.com/support
To access the NTP from the Technical Support page, go to the content listing page for Communication Server 1000M:
1Select the Browse product support tab on the main page.
2Select Product Families from the drop-down menu, and then
Enterprise Communication Servers in the first window.
3Select Communication Server 1000M Cabinet/Chassis from the second window.
4Select Documentation from the third window and click the Go button on the right.
5Use the filter provided under the Documentation tab to search for
Communication Server 1000M 4.0.
Note on legacy products and releases
This NTP contains information about systems, components, and features that are compatible with Nortel Communication Server 1000 Release 5.5 software. For more information on legacy products and releases, click the
Technical Documentation link under Support & Training on the Nortel home page:
www.nortel.com/
This document applies to the following systems:
•Communication Server 1000M Half Group (CS 1000M HG)
•Communication Server 1000M Single Group (CS 1000M SG)
•Communication Server 1000M Multi Group (CS 1000M MG)
NN43021-310 Standard 02.01 December 2007
System information Page 25 of 456
•Meridian 1 Option 51
•Meridian 1 PBX 51C
•Meridian 1 PBX 61C
•Meridian 1 Option 71
•Meridian 1 PBX 81
•Meridian 1 PBX 81C
Note: When upgrading software, memory upgrades may be required on the Signaling Server, the Call Server, or both.
System migration
When particular Meridian 1 systems are upgraded to run CS 1000 Release 5.5 software and configured to include a Signaling Server, they become CS 1000M systems. Table 1 lists each Meridian 1 system that supports an upgrade path to a CS 1000M system.
Table 1
Meridian 1 systems to CS 1000M systems
This Meridian 1 system... |
Maps to this CS 1000M system |
|
|
|
|
Meridian 1 PBX 51C |
CS 1000M Half Group |
|
|
|
|
Meridian 1 |
PBX 61C |
CS 1000M Single Group |
|
|
|
Meridian 1 |
PBX 81 |
CS 1000M Multi Group |
|
|
|
Meridian 1 |
PBX 81C |
CS 1000M Multi Group |
|
|
|
For more information, see Communication Server 1000M and Meridian 1 Large System Upgrade NTPs (NN43021-458 – NN43021-475).
This document is intended for individuals responsible for installing and configuring Large Systems. To use this document, you should have a basic knowledge of Large System equipment and operation. Contact Nortel for information on installation courses. You should also read and fully
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 26 of 456 System information
understand the Communication Server 1000M and Meridian 1: Large System Overview (NN43021-110) before you install a system.
Terminology
The following systems are referred to generically as “Large System”:
•Communication Server 1000M Half Group (CS 1000M HG)
•Communication Server 1000M Single Group (CS 1000M SG)
•Communication Server 1000M Multi Group (CS 1000M MG)
•Meridian 1 Option 51
•Meridian 1 PBX 51C
•Meridian 1 PBX 61C
•Meridian 1 Option 71
•Meridian 1 PBX 81
•Meridian 1 PBX 81C
Nortel strives to provide accurate documentation for our customers. However, if you feel there are errors or omissions in this document, your feedback is welcome.
Send comments via e-mail to gntsdoc@nortel.com or open a problem report via the normal procedures.
Please provide as much information as possible including the NTP number, standard version and date of the document, as well as the page, problem description, and any supporting documentation and capture files.
NN43021-310 Standard 02.01 December 2007
System information Page 27 of 456
This section lists information sources that relate to this document.
NTPs
The following NTPs are referenced in this document:
•Circuit Card: Description and Installation (NN43001-311)
•Signaling Server: Installation and Commissioning (NN43001-312)
•System Security Management (NN43001-602)
•Software Input/Output: Administration (NN43001-611)
•Telephones and Consoles: Description, Installation, and Operation
(NN43001-567)
•Software Input/Output: System Messages (NN43001-712)
•Communication Server 1000M and Meridian 1: Large System Overview
(NN43021-110)
•Communication Server 1000M and Meridian 1: Large System Planning and Engineering (NN43021-220)
•CS 1000M and Meridian 1 Large System Upgrades Overview
(NN43021-458)
•CS 1000M and Meridian 1 51C to CS 1000M SG CP PIV Upgrade
(NN43021-459)
•CS 1000M and Meridian 1 Option 51C to CS 1000M MG (CP PIV FNF) Upgrade (NN43021-460)
•CS 1000M and Meridian 1 61C to CS 1000M SG CP PIV Upgrade
(NN43021-461)
•CS 1000M and Meridian 1 61C CP PII to CS 1000M SG CP PIV Upgrade (NN43021-462)
•CS 1000M and Meridian 1 61C to CS 1000M MG CP PIV FNF Upgrade
(NN43021-463)
•CS 1000M and Meridian 1 61C CP PII to CS 1000M MG CP PII FNF Upgrade (NN43021-464)
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 28 of 456 System information
•CS 1000M and Meridian 1 61C CP PII to CS 1000M MG CP PIV FNF Upgrade (NN43021-465)
•CS 1000M and Meridian 1 CS1000M SG CP PIV to CS 1000M MG CP PIV FNF Upgrade (NN43021-466)
•CS 1000M and Meridian 1 71 to CS 1000M MG CP PIV FNF Upgrade
(NN43021-467)
•CS 1000M and Meridian 1 81 to CS 1000M MG CP PII FNF Upgrade
(NN43021-468)
•CS 1000M and Meridian 1 81C IGS to CS 1000M MG CP PII FNF Upgrade (NN43021-469)
•CS 1000M and Meridian 1 81C FNF to CS 1000M MG CP PII FNF Upgrade (NN43021-470)
•CS 1000M and Meridian 1 81C IGS to CS 1000M MG CP PIV FNF Upgrade (NN43021-471)
•CS 1000M and Meridian 1 CS 1000M MG CP PII IGS to CS 1000M MG CP PII FNF Upgrade (NN43021-472)
•CS 1000M and Meridian 1 CS 1000M MG CP PII IGS to CS 1000M MG CP PIV FNF Upgrade (NN43021-473)
•CS 1000M and Meridian 1 CS 1000M MG CP PII FNF to CS 1000M MG CP PIV FNF Upgrade (NN43021-474)
Other documentation
The following documentation is referenced in this document:
•Candeo Power System User Guide (P0914425)
•Candeo Power System Installation Guide (P0914426)
•Candeo SP 48300 Power System AP6C55AA User Manual (P7000154)
•Candeo SP 48300 Power System AP6C55AA Installation Manual
(P7000289)
NN43021-310 Standard 02.01 December 2007
System information Page 29 of 456
Online
To access Nortel documentation online, click the Technical Documentation link under Support & Training on the Nortel home page:
www.nortel.com
CD-ROM
To obtain Nortel documentation on CD-ROM, contact your Nortel customer representative.
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Page 30 of 456 System information
NN43021-310 Standard 02.01 December 2007