Cisco Systems STEV SRT-M-66 User Manual
Size:
853.38 Kb
Download

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

If you removed DC-inputpower entry modules, reinstall each power entry module as instructed in the“Installing DC-Input Power Entry Modules” section on page 3-78.

Reinstalling the Front Covers

When the router is repackaged for shipping, two foam inserts must be paced around the top of the router. To avoid interference with the foam inserts, the front cover for the power shelf and upper blower module should not be reinstalled on the router. It must be placed in its original box and packaged in the accessories boxed.

Reinstall the other front covers as instructed in the “Installing the Front Covers” section on page 3-39.

Repackaging the Router Accessories

To protect the accessories and the router from damage during shipment, you must repackage the router accessories in their original packaging and reassemble the accessories boxes into a package that is packed against the back panel of the router on the deck of the pallet body.

Repackaging the Rack-MountingPlatform

To repackage the rack-mountingplatform, follow these steps:

Step 1 Remove the screws that fasten the angle brackets to the sides of therack-mountingplatform.

Step 2 Place the screws and brackets in a plastic bag.

Step 3 Screw the threaded leveling feet completely into the legs of the platform.

Step 4 Turn the platform on its top and place it in its accessories box.

Step 5 Place the bag of screws and brackets in the accessories box.

Step 6 Place the corrugated pad foam side down on top of the platform.

Step 7 Close and seal the platform accessories box.

 

Cisco XR 12416 Router Chassis Installation Guide

A-20

OL-xxxxx-xx

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

Repackaging the Vertical Cable-ManagementTroughs

To repackage the vertical cable-managementtroughs, follow these steps:

Step 1 Place the six screws in a plastic bag.

Step 2 Insert the trough into the long plastic bag.

Step 3 Put the foam cap on each end of the trough.

Step 4 Place the trough and the bag of screws into the corrugated carton.

Step 5 Close and seal the carton.

Step 6 RepeatStep 1 throughStep 5 for the second trough.

Repackaging the Center-MountRack-MountingBrackets

If you used the optional center-mountrack-mountingbrackets to install the router in the equipment rack, you must repackage the brackets.

To repackage the brackets, follow these steps:

Step 1 Remove the brackets from the rack and place all of the screws in a plastic bag.

Step 2 Turn the brackets so the screw rails are interlocked.

Step 3 Hold the brackets together and put the two foam caps on the ends of the brackets.

Step 4 Place the brackets and the bag of screws into the corrugated carton.

Step 5 Close and seal the carton.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-21

 

 

 

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

Repackaging the Miscellaneous Accessories

To repackage the all of the miscellaneous accessory pieces, follow these steps:

Step 1 Put the box containing the front cover for the power shelf and upper blower module into the large miscellaneous accessories box.

Step 2 Put all of the other miscellaneous accessory pieces in the box.

Step 3 Close and seal the carton.

Reassembling the Accessories Package

Figure A-2 shows an exploded view of the pieces that make up the accessories package for the router. To reassemble the accessory box package, useFigure A-2 on page A-5 as a reference and follow these steps:

Step 1 Place the bottom accessories package cap open side up on the floor.

Step 2 To insert the accessory boxes into their slots in the bottom cap, follow these steps:

a.Insert the box containing the center-mountrack-mountingbrackets in the center slot closest to the back panel of the router.

b.Set the box containing the rack-mountingplatform against the box containing thecenter-mountrack-mountingbrackets.

c.Insert one vertical cable-managementtrough box on either side of the box containing therack-mountingplatform.

d.Place the miscellaneous accessories box on top of the rack-mountingplatform box, between the two trough boxes.

Step 3 Place the top accessories package cap over the ends of the accessories boxes and push it down to hold all the boxes together.

 

Cisco XR 12416 Router Chassis Installation Guide

A-22

OL-xxxxx-xx