Cisco Systems STEV SRT-M-66 User Manual
Size:
853.38 Kb
Download

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

Installing the Router on the Shipping Pallet

Figure A-7 shows how to install the router andscissor-jackplatform on the shipping pallet.

Figure A-7Installing the Router andScissor-JackPlatform on the Pallet

29186

Pallet body

Pallet front bar

Top view of pallet parts

 

Cisco XR 12416 Router Chassis Installation Guide

A-16

OL-xxxxx-xx

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

To reinstall the router and scissor-jackplatform on the shipping pallet, use

Figure A-7 as a reference and follow these steps:

Step 1 Use the hand truck to move the chassis to a level, open space with a solid floor.

Step 2 Tilt the chassis upright so that it stands on thescissor-jackplatform, then remove the hand truck.

Step 3 Use the bolts from the original shipping package to attach the eighthold-downbrackets to the sides of thescissor-jackplatform (two brackets on each side).

Note Thehold-downbrackets arenot symmetrical: The bracket plate that fastens to the side of thescissor-jackplatform is narrower than the bracket plate that fastens to the top of the pallet, and has smaller diameter bolt holes.

Step 4 Position theU-shapedpallet body behind thescissor-jackplatform with the opening facing the back panel of the router.

Step 5 Use the3/4-inch(19-mm)socket and ratchet wrench to turn thescissor-jackscrew slowly counterclockwise to expand thescissor-jackplatform and raise the top of thescissor-jackplatform high enough for thehold-downbrackets to clear the top of the pallet body.

Step 6 Slide the pallet body around thescissor-jackplatform.

Step 7 Slide the pallet front bar into the opening on the pallet body and use the hinge locks to secure it as instructed in these steps:

a.Pivot the butterfly handle on the hinge lock up so that it is perpendicular to the body of the hinge lock.

b.Twist the butterfly handle counterclockwise to extend the hinge lock hook to its maximum reach.

c.Lower the hinge lock hook over the hinge lock catch on the pallet body.

d.Twist the butterfly handle clockwise to clamp the hinge lock hook on the hinge lock catch on the pallet body.

e.Pivot the butterfly lever down onto the hinge lock body so that it lies flat.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-17

 

 

 

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

Step 8 Shift the pallet to ensure that it is positioned evenly all the way around thescissor-jackplatform and the bolt holes in thehold-downbrackets on the sides of thescissor-jackplatform are aligned with the holes in the top of the shipping pallet.

Step 9 Turn thescissor-jackscrew slowly clockwise to close thescissor-jackplatform and lower the top of thescissor-jackplatform slowly until thehold-downbrackets touch the top of the shipping pallet.

Step 10 Set a blocking plate into thehold-downbracket so that the blank side of the blocking plate is against the heads of the bolts in the side of thescissor-jackplatform and the open holes in the blocking plate align with the bolt holes in the top of the pallet.

Step 11 Insert bolts through each of thehold-downbracket holes and into the holes in the top of the shipping pallet, then use the9/16-inch(14-mm)wrench to tighten the bolts.

Step 12 Turn thescissor-jackscrew slowly clockwise to collapse thescissor-jackplatform and raise the base of thescissor-jackplatform until the weight of the router andscissor-jackplatform is absorbed by the pallet. Continue turning thescissor-jackscrew clockwise to close thescissor-jackplatform and lift the base of thescissor-jackplatform until thescissor-jackplatform is completely closed (the screw can not be turned).

 

Cisco XR 12416 Router Chassis Installation Guide

A-18

OL-xxxxx-xx

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT —CISCOCONFIDENTIAL

Reinstalling Components in the Router

If you elected to remove components from the chassis before removing it from the rack, you must now reinstall all the components in the chassis.

Reinstalling the Cards in the Upper and Lower Card Cages

Reinstall all of the cards from the upper and lower card cages in their original slots.

Reinstall all of the cards in the upper card cage as instructed in the “Reinstalling the Cards in the Upper Card Cage” section on page 3-52.

Reinstall all of the cards in the lower card cage as instructed in the “Reinstalling the Cards in the Lower Card Cage” section on page 3-53.

Caution Any unoccupied card slot in the upper or lower card cages must have a blank filler panel installed for electromagnetic compatibility (EMC) and to ensure proper air flow through the chassis. When the faceplate of a line card does not completely fill the card slot opening, a narrow card filler panel must be installed for electromagnetic compatibility (EMC) and to ensure proper air flow through the chassis.

Reinstalling the Cards in the Switch Fabric Card Cage

Reinstall all of the cards from the switch fabric card cage in their original slots as instructed in the “Reinstalling the Cards in the Switch Fabric Card Cage” section on page 3-50.

Replacing the Blower Modules

Replace the blower modules as instructed in the “Reinstalling the Blower

Modules” section on page 3-47.

Reinstalling the Power Modules

If you removed AC-inputpower supplies from the chassis, reinstall each power supply as instructed in the“Installing AC-Input Power Supplies” section on page 3-75.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-19