Carrier 25HBB User Manual

0 (0)

25HBB

Baset Series Heat Pumps with Puronr Refrigerant

1---1/2 To 5 Nominal Tons (Sizes 18 to 60)

Installation Instructions

NOTE: Read the entire instruction manual before starting the installation.

SAFETY CONSIDERATIONS

Improper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may cause death, personal injury, or property damage. Consult a qualified installer, service agency, or your distributor or branch for information or assistance. The qualified installer or agency must use factory-authorized kits or accessories when modifying this product. Refer to the individual instructions packaged with the kits or accessories when installing.

Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit. Consult local building codes and National Electrical Code (NEC) for special requirements.

Recognize safety information. This is the safety-alert symbol !! . When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.

Understand these signal words; DANGER, WARNING, and CAUTION. These words are used with the safety-alert symbol. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.

!WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

Before installing, modifying, or servicing system, main electrical disconnect switch must be in the OFF position. There may be more than 1 disconnect switch. Lock out and tag switch with a suitable warning label.

INSTALLATION RECOMMENDATIONS

NOTE: In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment.

1.Locate unit away from windows, patios, decks, etc. where unit operation sound may disturb customer.

2.Ensure that vapor and liquid tube diameters are appropriate for unit capacity.

3.Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.

4.Leave some slack between structure and unit to absorb vibration.

5.When passing refrigerant tubes through the wall, seal opening with RTV or other pliable silicon-based caulk. (See Fig. 1.)

6.Avoid direct tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls.

7.Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct contact with tubing.(See Fig. 1.)

8.Ensure that tubing insulation is pliable and completely surrounds vapor tube.

9.When necessary, use hanger straps which are 1 in. wide and conform to shape of tubing insulation. (See Fig. 1.)

10.Isolate hanger straps from insulation by using metal sleeves bent to conform to shape of insulation.

NOTE: Avoid contact between tubing and structure

OUTDOOR WALL

INDOOR WALL

CAULK

LIQUID TUBE

 

 

VAPOR TUBE

INSULATION

 

THROUGH THE WALL

 

JOIST

HANGER STRAP

(AROUND VAPOR

TUBE ONLY) INSULATION VAPOR TUBE

1MIN.

LIQUID TUBE

SUSPENSION

A94028

Fig. 1 - Connecting Tubing Installation

When outdoor unit is connected to factory-approved indoor unit, outdoor unit contains system refrigerant charge for operation with ARI rated indoor unit when connected by 15 ft. (4.57 m) of field-supplied or factory accessory tubing. For proper unit operation, check refrigerant charge using charging information located on control box cover and/or in the Check Charge section of this instruction.

IMPORTANT: Maximum liquid-line size is 3/8-in. OD for all residential applications including line line.

IMPORTANT: Always install the factory-supplied liquid-line filter drier. Obtain replacement filter driers from your distributor or branch.

25HBB

INSTALLATION

Check Equipment and Job Site

Unpack Unit

Move to final location. Remove carton taking care not to damage unit.

Inspect Equipment

File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit rating plate on unit corner panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications.

Install on a Solid, Level Mounting Pad

If conditions or local codes require the unit be attached to pad, tie down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit mounting pattern in Fig. 2 to determine base pan size and knockout hole location.

For hurricane tie downs, contact distributor for details and PE Certification (Professional Engineer), if required.

On rooftop applications, mount on level platform or frame. Place unit above a load-bearing wall and isolate unit and tubing set from structure. Arrange supporting members to adequately support unit and minimize transmission of vibration to building. Consult local codes governing rooftop applications.

Roof mounted units exposed to winds above 5 mph may require wind baffles. Consult the Service Manual - Residential Split System Air Conditioners and Heat Pumps for wind baffle construction.

NOTE: Unit must be level to within ±2° (±3/8 in./ft) per compressor manufacturer specifications.

Clearance Requirements

When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 24 in. (609.6 mm) clearance to service end of unit and 48 in. (1219.2 mm) (above unit. For proper airflow, a 6-in. (152.4 mm) clearance on 1 side of unit and 12-in. (304.8 mm) on all remaining sides must be maintained. Maintain a distance of 24 in. (609.6 mm) between units or 18 in. (457.2 mm) if no overhang within 12 ft. (3.66 m). Position so water, snow, or ice from roof or eaves cannot fall directly on unit.

NOTE: 18” clearance option described above is approved for outdoor units with wire grille coil guard only. Units with louver panels require 24” between units.

On rooftop applications, locate unit at least 6 in. above roof surface.

3/8---in. (9.53 mm) Dia. Tiedown Knockouts in Basepan(2) Places

View From Top

UNIT BASE PAN

TIEDOWN KNOCKOUT LOCATIONS in. (mm)

Dimension

A

B

C

26

X 26

9–1/8 (231.8)

4–7/16 (112.7)

21–1/4 (539.8)

31–1/2

X 31–1/2

9–1/8 (231.8)

6–9/16 (166.7)

24–11/16 (627.1)

35

X 35

9–1/8 (231.8)

6–9/16 (166.7)

28–7/16 (722.3)

 

 

 

 

A05177

Fig. 2 - Tiedown Knockout Locations

Operating Ambient

The minimum outdoor operating ambient in cooling mode without accessory is 55°F (12.78°C), and the maximum outdoor operating ambient in cooling mode is 125°F (51.67°C). The maximum outdoor operating ambient in heating mode is 66 °F (18.89°C).

Check Defrost Thermostat

Check defrost thermostat to ensure it is properly located and securely attached. There is a liquid header with a brass distributor and feeder tube going into outdoor coil. At the end of the one of the feeder tubes, there is a 3/8 in. O.D. stub tube approximately 2 in. long. (See Fig. 3.) The defrost thermostat should be located on stub tube. Note that there is only one stub tube used with liquid header, and on most units it is the bottom circuit.

FEEDER TUBE

STUB TUBE

DEFROST

THERMOSTAT

A97517

Fig. 3 - Defrost Thermostat Location

Make Piping Connections

!WARNING

PERSONAL INJURY AND ENVIRONMENTAL HAZARD

Failure to follow this warning could result in personal injury or death.

Relieve pressure and recover all refrigerant before system repair or final unit disposal.

Use all service ports and open all flow-control devices, including solenoid valves.

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

If ANY refrigerant tubing is buried, provide a 6-in (152.4 mm). vertical rise at service valve. Refrigerant tubing lengths up to 36-in (914.4 mm). may be buried without further special consideration. Do not bury lines longer than 36 in (914.4 mm).

Outdoor units may be connected to indoor section using accessory tubing package or field-supplied refrigerant grade tubing of correct size and condition. For tubing requirements beyond 80 ft, substantial capacity and performance losses can occur. Following the recommendations in the Application Guideline and Service Manual-Residential Split-System Air Conditioners and Heat Pumps will reduce these losses. Refer to Table 1 for accessory requirements. Refer to Table 2 for field tubing diameters.

There are no buried-line applications greater than 36 in. (914.4 mm)

If refrigerant tubes or indoor coil are exposed to atmosphere, they must be evacuated to 500 microns to eliminate contamination and moisture in the system.

2

Carrier 25HBB User Manual

Table 1 – Accessory Usage

 

REQUIRED FOR LOW---AMBIENT

REQUIRED FOR

REQUIRED FOR

Accessory

COOLING APPLICATIONS

LONG LINE APPLICATIONS*

SEA COAST APPLICATIONS

 

(Below 55°F / 12.8°C)

(Over 80 ft. / 24.38 m)

(Within 2 miles / 3.22 km)

 

 

 

 

Accumulator

Standard

Standard

Standard

Ball Bearing Fan Motor

Yes{

No

No

Compressor Start Assist Capacitor and

Yes

Yes

No

Relay

 

 

 

 

 

 

 

Crankcase Heater

Yes

Yes

No

 

 

 

 

Evaporator Freeze Thermostat

Yes

No

No

Hard Shutoff TXV

Yes

Yes

Yes

Isolation Relay

Yes

No

No

Liquid Line Solenoid Valve

No

See Long---Line Application

No

Guideline

 

 

 

 

 

 

 

Motor MasterControl or

Yes

No

No

Low Ambient Switch

 

 

 

 

 

 

 

Support Feet

Recommended

No

Recommended

*For tubing line sets between 80 and 200 ft. (24.38 and 60.96 m) and/or 20 ft. (6.09 m) vertical differential, refer to Residential Split---System Longline Application Guideline.

{ Additional requirement for Low---Ambient Controller (full modulation feature) MotorMasterr Control.

Outdoor Unit Connected To Factory Approved Indoor Unit

Outdoor unit contains correct system refrigerant charge for operation with approved ARI rated indoor unit when connected by 15 ft (4.57 m) of field-supplied or factory-accessory tubing, and factory supplied filter drier. Check refrigerant charge for maximum efficiency.

Refrigerant Tubing and Sweat Connections

Connect vapor tube to fitting on outdoor unit vapor service valves (see Table 2). Connect liquid tubing to adapter tube on liquid service valve. Use refrigerant grade tubing.

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

Service valves must be wrapped in a heat-sinking material such as a wet cloth while brazing.

Remove plastic retainer holding outdoor piston in liquid service valve, leaving the piston and piston retainer inside the valve. Connect sweat/flare adapter provided, to valve. (See Fig. 4.) Connect refrigerant tubing to fittings on outdoor unit vapor and liquid service valves. Service valves are closed from factory and ready for brazing. After wrapping service valve with a wet cloth, tubing set can be brazed to service valve using either silver bearing or non-silver bearing brazing material. Do not use soft solder (materials which melt below 800°F/427°C). Consult local code requirements. Refrigerant tubing and indoor coil are now ready for leak testing. This check should include all field and factory joints.

A05226

Fig. 4 - Liquid Service Valve

Table 2 – Refrigerant Connections and Recommended Liquid

and Vapor Tube Diameters (In.)

 

 

 

RATED VAPOR

 

LIQUID

up to 80 ft. (24.38 m)*

UNIT SIZE

 

 

 

 

 

Connection

Tube

Connection

Tube

 

Diameter

Diameter

Diameter

Diameter

 

 

 

 

 

018, 024

3/8

3/8

5/8

5/8

030, 036

3/8

3/8

3/4

3/4

042, 048

3/8

3/8

7/8

7/8

060

3/8

3/8

7/8

1-1/8

Notes:

1.Tube diameters are for total equivalent lengths up to 80 ft. (24.38 m)

2.Do not apply capillary tube or fixed orifice indoor coils to these units.

*For Tubing Set lengths between 80 and 200 ft. (24.38 and 60.96 m) horizontal or 20 ft. (6.10 m) vertical differential (250 ft./ 76.2 m)Total Equivalent Length), refer to the Longline Guideline--- Air Conditioners and Heat Pumps using Puronr Refrigerant.

Install Liquid Line Filter Drier Indoor

Refer to Fig. 5 and install filter drier as follows:

1.Braze 5 in. (127 mm) liquid tube to the indoor coil.

2.Wrap filter drier with damp cloth.

3.Braze filter drier to 5 in. (127 mm) long liquid tube from step 1.

4.Connect and braze liquid refrigerant tube to the filter drier.

A05227

Fig. 5 - Liquid Line Filter Drier

Evacuate Refrigerant Tubing and Indoor Coil

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

Never use the system compressor as a vacuum pump.

Refrigerant tubes and indoor coil should be evacuated using the recommended deep vacuum method of 500 microns. The alternate triple evacuation method may be used (see triple evacuation procedure in service manual). Always break a vacuum with dry nitrogen.

25HBB

3

Loading...
+ 5 hidden pages