APC MGE Galaxy 3500, G35T10KF1B2S, KVA 208-220 V User Manual

0 (0)
APC MGE Galaxy 3500, G35T10KF1B2S, KVA 208-220 V User Manual

Single and Parallel

Installation

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V

American Power Conversion Legal Disclaimer

The information presented in this manual is not warranted by the American Power Conversion Corporation to be authoriative, error free, or complete. This publication is not meant to be

a substitute for detailed operational and site specific development plan. Therefore, American Power Conversion Corporation assumes no liability for damages, violations of codes, improper installation, system failures, or any other problems that could arise based on the use of this Publication.

The information contained in this Publication is provided as is and has been prepared solely for the purpose of evaluating data center design and construction. This Publication has been compiled in good faith by American Power Conversion Corporation. However, no presentation is made or warranty, either express or implied, as to the completeness or accuracy of the information this Publication contains.

NO EVENT SHALL AMERICAN POWER CONVERSION CORPORATION BE LIABLE FOR ANY DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE, SPECIAL, OR INCIDENTAL DAMAGES (INCLUDING, WITHOUT LIMITATION, DAMAGES FOR LOSS OF BUSINESS, CONTRACT, REVENUE, DATA, INFORMATION, OR BUSINESS INTERRUPTION) RESULTING FROM, ARISING OUT, OR IN CONNECTION WITH THE USE OF, OR INABILITY TO USE THIS PUBLICATION OR THE CONTENT, EVEN IF AMERICAN POWER CONVERSION CORPORATION HAS BEEN EXPRESSLY ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AMERICAN POWER CONVERSION CORPORATION RESERVES THE RIGHT TO MAKE CHANGES OR UPDATES WITH RESPECT TO OR IN THE CONTENT OF THE PUBLICATION OR THE FORMAT THEREOF AT ANY TIME WITHOUT NOTICE.

Copyright, intellectual, and all other proprietary rights in the content (including but not limited to software, audio, video, text, and photographs) rests with American Power Conversion Corporation or its licensors. All rights in the content not expressly granted herein are reserved. No rights of any kind are licensed or assigned or shall otherwise pass to persons accessing this information.

This Publication shall not be for resale in whole or in part.

Table of Contents

IMPORTANT SAFETY INSTRUCTIONS – SAVE THESE

 

INSTRUCTIONS ...............................................................................................................

1

Specifications...................................................................................................................

2

AC Input Specifications..............................................................................................

2

AC Bypass Input Specifications ..............................................................................

2

AC Output Specifications ..........................................................................................

3

Battery Specifications ................................................................................................

3

Recommended Cable Sizes ......................................................................................

4

Connection Terminals................................................................................................

4

Torque Specifications................................................................................................

4

Fuses and Breakers ....................................................................................................

5

Single Utility/Mains System .......................................................................................

5

Dual Utility/Mains System..........................................................................................

5

Parallel System..........................................................................................................

6

Fuse and Breaker Sizes in Single Systems................................................................

6

Fuse and Breaker Sizes in Parallel Systems..............................................................

6

Minimum Breaker Settings ........................................................................................

7

Mechanical Installation ...............................................................................................

8

Clearance .......................................................................................................................

8

Level the Cabinet .........................................................................................................

8

Remove the Front Panel ............................................................................................

9

Floor Anchoring ..........................................................................................................

9

Hole Positions for a Stand-alone UPS Enclosure with L-shaped Anchoring

 

Brackets ....................................................................................................................

10

Hole Positions for Up to Four UPS Units in Parallel with U-shaped Anchoring

 

Brackets ...................................................................................................................

10

Connect Floor Anchoring Brackets to the UPS and XR Battery Enclosure for

 

Stability......................................................................................................................

11

Remove the Battery Modules.....................................................................................

12

Install the Baying Kit (Optional) for Interconnection of Enclosures and Seismic

 

Anchoring..................................................................................................................

13

Install XR Battery Enclosures (Option)..............................................................

16

Remove the Cable Landing Cover and Bottom Plates ......................................

16

Connect Battery Power in Installations with Busbars .......................................

17

Isolator Installation Principle.....................................................................................

17

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

i

Install Busbars in 523 mm (20.59 in) UPS System with the UPS Placed to the Left

 

(seen from the front)..................................................................................................

18

Install Busbars in 523 mm (20.59 in) UPS System with the UPS Placed to the

 

Right (seen from the front) ........................................................................................

19

Install Busbars in 352 mm (13.85 in) UPS System with the UPS Placed to the

 

Right (seen from the front) ........................................................................................

20

Install Busbars in 352 mm (13.85 in) UPS System with the UPS Placed to the Left

 

(seen from the front)..................................................................................................

21

Connect Battery Power in Installations with Cables..........................................

22

Connect Power Cables Between the UPS and the XR Battery Enclosure ..................

22

Connect Power Cables between Two XR Battery Enclosures....................................

23

Connect the Power Cables to the UPS...............................................................

25

Single System 10-30 kVA 208 V................................................................................

25

Single System 10-30 kVA 480 V................................................................................

26

Prepare for Cables.......................................................................................................

27

Bottom Cable Entry ...................................................................................................

27

Connect the AC Input and AC Output Cables......................................................

28

Single Mains ..............................................................................................................

28

Dual Mains.................................................................................................................

28

Connect the DC Battery Cables (if applicable)...........................................................

29

Connect the Communication Cables ..................................................................

30

Prepare for Communication Cables........................................................................

30

Overview of Pin Connections ...................................................................................

31

J106 ...........................................................................................................................

31

EPO in Single Systems...............................................................................................

32

EPO in Parallel Systems ............................................................................................

33

Connect Communication Cables between UPS and XR Battery

 

Enclosure .......................................................................................................................

34

Connect APC Communication Options .................................................................

35

Connect Communication Cables in Parallel System..........................................

36

Overview of the PBus Cables ....................................................................................

36

Prepare for Cables.....................................................................................................

37

UPS Units Apart without Conduits and Interconnection ..................................

38

UPS Units Bayed Together without Conduits ......................................................

39

UPS Units Apart or Bayed Together with Conduits ...........................................

40

Install Seismic Option..................................................................................................

42

Install the Seismic Battery Lock ..............................................................................

42

ii

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

Install the Seismic Stabilizing Brackets ................................................................

42

Final Mechanical Installation...................................................................................

44

Connect Battery Securing Brackets for Stability ................................................

44

Reinstall the Top Cover and the Front Panel .......................................................

45

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

iii

iv

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

IMPORTANT SAFETY INSTRUCTIONS – SAVE THESE INSTRUCTIONS

WARNING: ALL safety instructions in the Safety Sheet (990-2940) must be read, understood, and followed when installing the UPS system. Failure to do so could result in equipment damage, serious injury, or death.

WARNING: After the UPS has been electrically wired, do not start it up. Start-up is commissioned to authorized personnel from Schneider Electric.

WARNING: When the UPS input is connected through external isolators that, when opened, isolate the neutral, or is connected to an IT power distribution system, a label must be fitted at the UPS input terminals by the UPS supplier, and on all primary power isolators installed remote from the UPS area and on external access points between such isolators and the UPS by the user, displaying the following text (or equivalent): "Risk of voltage backfeed. Before working on this circuit, isolate the UPS and check for hazardous voltage between all terminals including the protective earth."

Caution: All electrical power and power control wiring must be installed by a qualified electrician and must comply with local and national regulations for maximum power rating.

Caution: Wait until the system is ready be powered up before installing batteries. Failure to do so can result in a deep discharge of the batteries and cause permanent damage (the time from the battery installation time till the UPS is powered up should not exceed 72 hours or 3 days.

Note: The system is designed for connection to an IT power distribution system.

Note: The parallel cables must be run by the electrician but not attached. The field service engineer from Schneider Electric will install the parallel communication box and attach all cables to the UPS units.

Note: Up to four UPS units can run in parallel.

Note: Ensure that the all UPS units are in their final location prior to the installation.

Note: Battery and utility/mains power must not be connected until all other wiring has been completed.

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

1

Specifications

WARNING: The UPS must be supplied from a 208/120 V or 220/127 V 4W + GND 60 HZ source.

AC Input Specifications

 

10 kVA

 

15 kVA

 

20 kVA

 

30 kVA

 

 

 

 

 

 

 

 

 

 

 

208 V

220 V

208 V

220 V

208 V

220 V

208 V

220 V

 

 

 

 

 

 

 

 

 

Connection type

4-wire (3PH + N + G)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Input frequency

40-70

 

 

 

 

 

 

 

(Hz)

 

 

 

 

 

 

 

 

I thd

< 5% at full load

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nom input current

24.3

23.0

36.6

34.6

48.6

45.8

73.2

69.0

(A)

 

 

 

 

 

 

 

 

Max input current

26.7

25.2

40.2

38.0

53.0

50.1

80.1

75.8

(A)

 

 

 

 

 

 

 

 

Input current

32.8

32.8

49.5

49.5

65.2

65.2

98.8

98.8

limitation (A)

 

 

 

 

 

 

 

 

Input power factor

> 0.98 at load > 50%

 

 

 

 

 

 

correction

 

 

 

 

 

 

 

 

Maximum Short

30

 

 

 

 

 

 

 

Circuit Withstand

 

 

 

 

 

 

 

 

(kA)

 

 

 

 

 

 

 

 

AC Bypass Input Specifications

 

10 kVA

 

15 kVA

 

20 kVA

 

30 kVA

 

 

 

 

 

 

 

 

 

 

 

208 V

220 V

208 V

220 V

208 V

220 V

208 V

220 V

 

 

 

 

 

 

 

 

 

Connection type

4-wire (3PH + N + G)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Input frequency

50 +/- 10 or 60 +/- 10

 

 

 

 

 

 

(Hz)

 

 

 

 

 

 

 

 

Nom input current

27.8

26.2

41.6

39.4

55.5

52.5

83.3

78.7

(A)

 

 

 

 

 

 

 

 

2

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

AC Output Specifications

 

10 kVA

 

15 kVA

 

20 kVA

 

30 kVA

 

 

 

 

 

 

 

 

 

 

 

208 V

220 V

208 V

220 V

208 V

220 V

208 V

220 V

 

 

 

 

 

 

 

 

 

Connection type

4-wire (3PH + N + G)

 

 

 

 

 

 

 

 

 

 

 

 

Overload capacity

150% for 1 minute (normal operation)

 

 

 

 

 

125% for 10 minutes (normal operation)

 

 

 

 

 

150% for 1 minute (battery operation)

 

 

 

 

 

125% for 10 minutes (battery operation)

 

 

 

 

 

110% continuous (bypass operation)

 

 

 

 

 

800% for 500 ms (bypass operation)

 

 

 

 

Voltage tolerance

160-240 V for 208 V systems

 

 

 

 

 

 

160-253 V for 220 V systems

 

 

 

 

 

Nom output

27.8

26.2

41.6

39.4

55.5

52.5

83.3

78.7

current (A)

 

 

 

 

 

 

 

 

Output frequency

50 Hz ±0.1 Hz, ±3 Hz, ±10 Hz

 

 

 

 

 

(sync to mains)

60 Hz ±0.1 Hz, ±3 Hz, ±10 Hz

 

 

 

 

 

Slew rate (Hz/Sec)

0.25-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Harmonic

< 1.5% linear

 

 

 

 

 

 

Distortion (THD)

< 3.5% non-linear

 

 

 

 

 

 

Load power factor

0.5 leading to 0.5 lagging

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dynamic load

± 5%

 

 

 

 

 

 

 

response

 

 

 

 

 

 

 

 

Output voltage

± 1%

 

 

 

 

 

 

 

regulation

 

 

 

 

 

 

 

 

Battery Specifications

Type

VRLA

 

 

Nominal voltage (VDC)

+/- 192

 

 

Float voltage (VDC)

+/- 219

 

 

End of discharge voltage (VDC)

+/- 154

 

 

Battery current (at full load)

66.5 A at +/-192 V

 

 

Max. current (at end of discharge)

83.2 A at + 154 V

 

 

Max. charging power

10 kVA: 1600 W

 

15 kVA: 2400 W

 

20 kVA: 3200 W

 

30 kVA: 3200 W

Typical re-charge time

5 hours

 

 

End voltage

1.6-1.75 V/cell (automatic, depending on load)

 

 

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

3

Recommended Cable Sizes

WARNING: At 100% switch mode load, the neutral must be rated for 200% phase current.

Caution: All wiring must comply with all applicable national and/or electrical code.

Note: The recommended cable sizes are based on an environment with an ambient temperature of 30° C (86° F). Use stranded copper cables.

 

10 kVA

15 kVA

20 kVA

30 kVA

 

 

 

 

 

Utility/mains input

8 AWG

6 AWG

4 AWG

1 AWG

 

 

 

 

 

Static bypass input

8 AWG

6 AWG

4 AWG

1 AWG

 

 

 

 

 

DC input

1 AWG

1 AWG

1 AWG

1 AWG

 

 

 

 

 

Output

8 AWG

6 AWG

4 AWG

1 AWG

 

 

 

 

 

Connection Terminals

Cable size (AWG)

Cable lug type

Crimping tool

Die

Terminal bolt

 

 

 

 

diameter

 

 

 

 

 

12

YA12CL2TC38

MD7-34R

W12CVT

6 mm (0.2 in)

 

 

 

 

 

8

YA8CL2TC38

MD7-34R

W8CVT

6 mm (0.2 in)

 

 

 

 

 

6

YA6CL2TC38

MD7-34R

W6CVT

6 mm (0.2 in)

 

 

 

 

 

4

YA4CL2TC38

MD7-34R

W4CVT

6 mm (0.2 in)

 

 

 

 

 

1

YA1CL2TC38

MD7-34R

W1CVT

6 mm (0.2 in)

 

 

 

 

 

Torque Specifications

The power wiring should be torqued to 7 Nm (45 lbf-in).

4

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

Fuses and Breakers

Single Utility/Mains System

Q1: Utility/mains input

Q2: UPS output

Q3: Manual bypass

MBS: Mechanical bypass switch

Dual Utility/Mains System

Q1: Utility/mains input

Q2: UPS output

Q3: Manual bypass

Q5: Static bypass input

MBS: Mechanical bypass switch

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

5

Parallel System

Q1: Utility/mains input

Q2: UPS output

Q3: Manual bypass

Q4: System output

Q5: Static bypass input

Fuse and Breaker Sizes in Single Systems

 

10 kVA

15 kVA

20 kVA

30 kVA

 

 

 

 

 

Utility input Q1

35 A

60 A

80 A

110 A

 

 

 

 

 

Static bypass input

35 A

60 A

80 A

110 A

Q5

 

 

 

 

UPS output Q2

35 A

60 A

80 A

110 A

 

 

 

 

 

Manual bypass Q3

35 A

60 A

80 A

110 A

Fuse and Breaker Sizes in Parallel Systems

Q3 and Q4 in Parallel Capacity Systems

Units in parallel

10 kVA

15 kVA

20 kVA

30 kVA

 

 

 

 

 

2

70 A

110 A

150 A

225 A

 

 

 

 

 

3

110 A

175 A

225 A

350 A

 

 

 

 

 

4

150 A

225 A

300 A

450 A

 

 

 

 

 

Q3 and Q4 in Redundant Parallel Systems (n+1)

Units in parallel

10 kVA

15 kVA

20 kVA

30 kVA

 

 

 

 

 

2

35 A

60 A

80 A

110 A

 

 

 

 

 

3

70 A

110 A

150 A

225 A

 

 

 

 

 

4

110 A

175 A

225 A

350 A

 

 

 

 

 

6

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

Minimum Breaker Settings

 

 

800% overload

150% overload

125% overload

Continuously

 

 

bypass

normal/battery

normal/battery

 

 

 

operation

operation

operation

 

 

Duration

500 ms

60 s

10 min

 

 

 

 

 

 

 

10 kVA

Mains input

-1

-

-

34 A

 

Static bypass

223 A

-

-

31 A

 

input

 

 

 

 

 

UPS output

223 A

42 A

35 A

31 A

 

 

 

 

 

 

15 kVA

Mains input

-1

-

-

51 A

 

Static bypass

333 A

-

-

46 A

 

input

 

 

 

 

 

UPS output

333 A

63 A

52 A

46 A

 

 

 

 

 

 

20 kVA

Mains input

-1

-

-

68 A

 

Static bypass

444 A

-

-

62 A

 

input

 

 

 

 

 

UPS output

444 A

84 A

70 A

62 A

 

 

 

 

 

 

30 kVA

Mains input

-1

-

-

99 A

 

Static bypass

667 A

-

-

92 A

 

input

 

 

 

 

 

UPS output

667 A

125 A

105 A

92 A

 

 

 

 

 

 

1 For single mains systems, use the higher value of mains and static bypass

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

7

Mechanical Installation

Clearance

Note: Clearance dimensions are published for airflow and service access only. Consult with the local safety codes and standards for additional requirements in your local area.

Level the Cabinet

WARNING: The system must be installed on a level floor. The leveling feet will stabilize the cabinet, but will not account for a badly sloped floor.

1. Take the 13/14 mm wrench attached to the pallet.

2. Adjust the four leveling feet and ensure that the system is level.

Note: Do not move the cabinet after the leveling feet have been lowered.

8

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

Remove the Front Panel

1.Use a coin or similar to turn the two black lock devices on either side of the display in the

direction of each other to a vertical position.

2. Push the front panel upwards and pull it outwards to disengage the locking device at the top of the enclosure.

3. Lift the front panel free of the two slots at the bottom of the enclosure.

Floor Anchoring

There are two floor anchoring options that can be used depending on the requirements in the installation area:

For stability: Reuse the L-shaped brackets that secured the enclosure to the pallet during shipment for a stand-alone UPS.

For seismic anchoring: Use a baying kit that includes U-shaped seismic anchoring brackets.

Note: Allow for enough working space behind the enclosure for electrical work to be carried out (e.g. if you want to install an XR Battery Enclosure at a later stage). Minimum rear clearance is 100 mm (3.93 in) and must comply with applicable national and local codes. 600 mm (23.6 in) is recommended.

Note: Hole positions are guidelines only.

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

9

Hole Positions for a Stand-alone UPS Enclosure with L-shaped Anchoring Brackets

Note: Recommended minimum number of screws per enclosure for the L-shaped brackets is four; one in each corner. Recommended floor bolt size: M8.

Model Width: 352 mm (13.85 in) and 523 mm (20.59 in)

Hole Positions for Up to Four UPS Units in Parallel with U-shaped Anchoring Brackets

Note: Recommended minimum number of floor screws for the two configurations below is 10.

Model Width: 352 mm (13.85 in)

10

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001

Loading...
+ 36 hidden pages